Skip to main content

alexi

Creator

Member since December 2024

I do low-carbon energy stuff for 10 years & build things I wish existed.

Calculators
19
Total runs
463
Likes
5
Forks
1

Published calculators19

Sorted by most popular
Most used
Preview — H2 Electrolyser

H2 Electrolyser

Screening-stage hydrogen electrolyser calculator with technology selector, nominal power and capacity factor; outputs hourly/annual H2, water feed, O2 co-product, CAPEX breakdown, and levelized cost of hydrogen (LCOH).

Energy mass balanceCostingHydrogen
alexi
135
Preview — Water Treatment Screening Cost, Energy & Footprint

Water Treatment Screening Cost, Energy & Footprint

Screening-stage estimator for water treatment plant CAPEX/OPEX, electricity use, modular unit count, and plot footprint based on water source, end use, and flow.

CostingEquipment sizing+1Other
Preview — Large compressed H2 Storage

Large compressed H2 Storage

Screens compressed hydrogen storage volume and total cost impacts alongside electrolyser electricity use and levelized cost of hydrogen (LCOH).

CostingHydrogen
Preview — Utility-Scale Solar PV LCOE (Ground-Mounted, 5–200 MWp)

Utility-Scale Solar PV LCOE (Ground-Mounted, 5–200 MWp)

Estimates the levelized cost of electricity (LCOE) for a utility-scale ground-mounted PV plant from capacity, capacity factor, and CAPEX/OPEX per MW.

Energy mass balanceCostingSolar
Preview — ATR Hydrogen (Grey/Blue)

ATR Hydrogen (Grey/Blue)

ATR hydrogen calculator estimating annual production, fuel/electricity use, CO2 (with/without CCS), and levelized cost of hydrogen (LCOH) using a simple scaling CAPEX + CRF cost model.

Energy mass balanceCostingHydrogen
alexi
121
Preview — Direct Air Capture (Climeworks-style solid sorbent)

Direct Air Capture (Climeworks-style solid sorbent)

Screening model for Climeworks-style low-temperature solid-sorbent DAC: energy use, modular unit count, and levelized cost per tCO2.

Energy mass balanceEquipment sizing+1Other
Preview — PEM Fuel Cell Power Plant

PEM Fuel Cell Power Plant

Screening-stage model for a stationary containerized PEM fuel cell system to estimate hydrogen consumption, CAPEX/OPEX breakdown, and LCOE with an optional PSA purification package.

CostingHydrogen
Preview — CSP Plant Surface, Cost Breakdown & LCOE Calculator (DNI-based)

CSP Plant Surface, Cost Breakdown & LCOE Calculator (DNI-based)

Screening-level CSP (solar thermal) sizing and economics from DNI, capacity factor, plant MW, and thermal storage duration, with CSP type selection.

Energy mass balanceEquipment sizing+1Solar
Preview — Power Transformation Station

Power Transformation Station

Screening-stage parametric estimate of substation CAPEX split, annual O&M, total annual cost, and levelized cost per MWh of energy throughput.

CostingOther
Preview — Autothermal Reforming (ATR) Hydrogen Plant — Screening Mass Balance & Cost (NETL-aligned)

Autothermal Reforming (ATR) Hydrogen Plant — Screening Mass Balance & Cost (NETL-aligned)

Screening-stage ATR hydrogen calculator with annual/daily mass & energy balance and CAPEX/OPEX to levelized cost of hydrogen (LCOH).

Energy mass balanceCostingHydrogen
Preview — Ethanol-to-Olefins (ETO) Front-End Unit

Ethanol-to-Olefins (ETO) Front-End Unit

Screening model for an ethanol drying + vaporisation + catalytic dehydration unit producing light olefins for downstream jet-fuel synthesis, including mass balance, utility demands, plot space, and scaled CAPEX/OPEX with levelized cost.

Energy mass balanceEquipment sizing+1Efuel
Preview — Direct Methanol Synthesis (CO2 + H2) — Screening Mass Balance, Sizing & Cost Curve (No Gas Compression)

Direct Methanol Synthesis (CO2 + H2) — Screening Mass Balance, Sizing & Cost Curve (No Gas Compression)

Screening-level direct methanol synthesis calculator: input methanol output, compute H2/CO2 needs, water co-product, key equipment sizing, and CAPEX/OPEX via a power-law cost curve (compression excluded).

Energy mass balanceEquipment sizing+1Other
Preview — Olefin Pooling & Polishing (Oligomerisation Feed Conditioning)

Olefin Pooling & Polishing (Oligomerisation Feed Conditioning)

Pre-feasibility sizing and costing of an intermediate olefin pooling, buffering, and polishing system delivering a controlled feed to oligomerisation, with capacity scaling curves and levelized cost outputs.

Equipment sizingCostingEfuel
Preview — Methanol-to-Olefin (MTO)

Methanol-to-Olefin (MTO)

Pre-feasibility sizing, mass balance, utilities, plot space, and equipment-purchase CAPEX + OPEX for a methanol conversion unit producing olefin/hydrocarbon intermediates for downstream jet-fuel synthesis.

Equipment sizingCostingEfuel
Preview — Kerosene Upgrading (Hydrogenation, Recycle & Separation)

Kerosene Upgrading (Hydrogenation, Recycle & Separation)

Pre-feasibility sizing, utilities, and cost model for a hydrogen-consuming upgrading unit (hydrogenation + recycle gas + separation/stabilisation) for FT synthetic hydrocarbons.

Equipment sizingCostingEfuel
Preview — Ethanol Storage (Unloading, Tanks, Transfer, Metering)

Ethanol Storage (Unloading, Tanks, Transfer, Metering)

Pre-feasibility sizing and costing for a liquid ethanol receiving, storage and transfer asset delivering stable flow to a downstream unit, including tanks, pumping/metering, safety systems, plot space, losses and levelized handling cost.

Equipment sizingCostingEfuel
Preview — Light Olefin Oligomerisation to Jet-Range Hydrocarbons

Light Olefin Oligomerisation to Jet-Range Hydrocarbons

Screening-level sizing and cost model for a catalytic oligomerisation unit converting light olefins to jet-range (kerosene-range) hydrocarbons, including recycle of light ends, primary separation, utilities, and equipment-purchase CAPEX with scaling curves.

Equipment sizingCostingEfuel
Preview — SAF blendstock hydrocarbon separation unit (distillation)

SAF blendstock hydrocarbon separation unit (distillation)

Screening model for a hydrocarbon separation section recovering SAF blendstock and co-products from a stabilised hydrocarbon mixture, with energy demand estimates and a granular equipment purchase cost split.

Equipment sizingCostingEfuel
Preview — Liquid Methanol Receiving & Storage (Unloading, Tanks, Transfer, Safety) — Pre-feasibility

Liquid Methanol Receiving & Storage (Unloading, Tanks, Transfer, Safety) — Pre-feasibility

Pre-feasibility sizing and costing for a liquid methanol receiving and storage system delivering stable flow to a downstream unit, including tank count/volume, pumping energy, losses, and levelized handling cost.

Equipment sizingCostingEfuel