Skip to main content
Equipment catalogWillow Rock Energy Storage Center
Hydrostor

Willow Rock Energy Storage Center

Safe, reliable, and clean long duration energy storage for California

StorageCompressed air energy storage plantModelled
WI
Rated power
500MW
Energy capacity
4000MWh
Storage duration
8h

Characteristics

3 of 3 fields · all sourced · retrieved 2026-10-23
Rated power
500MW
Energy capacity
4000MWh
Storage duration
8h

Willow Rock is a 500 MW / 4,000 MWh Advanced Compressed Air Energy Storage (A-CAES) facility in late-stage development in Kern County, California, able to deliver 8+ hours of energy on a full charge. During charging, off-peak or surplus grid electricity drives a compressor; the heat is pulled out of the compressed air and kept in above-ground thermal storage, and the air is held in a purpose-built underground hard rock cavern where a water head keeps the pressure constant. To discharge, the water head pushes the air back to the surface, where it is recombined with the stored heat and expanded through a turbine to generate electricity. The project targets renewables integration and transmission optimization, with a design life of 50+ years. Hydrostor says the process is non-combustible and needs less land and water than pumped hydro.

Manufacturer datasheet (11)

Technology
Advanced Compressed Air Energy Storage (A-CAES)
Project design life
50+ yearsyears
Location
Kern County, California
Owner
Hydrostor
Application
Renewables Integration, Transmission Optimization
Project status
under late-stage development in California
Economic impact
25-40 full-time equivalent jobs during operation, an estimated peak workforce of 700 jobs during construction, and over $500 million of regional direct and indirect economic impacts.
Offtake agreement
60 megawatt (MW) offtake agreement with Clean Energy Alliance (CEA)MW
Site
located in California's Antelope Valley
Permit
received its California Energy Commission permit in December of 2025
Construction start
On-site work has officially begun on the Willow Rock Energy Storage Center as of July 2026