Advanced adiabatic compressed air energy storage (A-CAES): round-trip efficiency, duration and LCOS

Advanced adiabatic compressed air energy storage plant: LCOS in EUR/MWh delivered from a DOE/PNNL power block and a storage block calibrated on Hydrostor Silver City, scaled at 8 % per tenfold size (PNNL-33283), with literature round-trip efficiency, cycles capped by recharge time, and flags where the cost law is extrapolated.

  • CurrencyEUR 2022
  • Battery limitfully financed
  • 68 documented assumptions
  • Updated27 Oct 2026

Mass and energy balance

What the asset draws and delivers for the case and load you choose.

Reference case

Full equivalent cycles you want a year. Default 365, the PNNL-33283 ceiling of one full cycle a day. The plant cannot do more than the clock allows (charge plus discharge time), and the model caps the request accordingly.

Flows

  • In: Electricity for charging—

Asset

Advanced adiabatic compressed air energy storage (A-CAES) plant

  • Out: Electricity discharged—

Annual quantities at the current usage.

Electrical output of the expansion turbines. The catalogue binds products here: Hydrostor Silver City is 200 MW / 1,600 MWh, Willow Rock 500 MW / 4,000 MWh. The PNNL scale law (8 % cheaper per kW for each tenfold size) is fitted on 100 and 1,000 MW: below 100 MW it is an extrapolation and an output flags it.

Storage energy
— MWh
Compressor electrical power
— MW
Energy discharged a year
— MWh/a

CAPEX

Specific cost at this size, what backs it, and how it behaves with scale.

Specific CAPEX at this size

—

Reference size 100 MW

PNNL-33283 Sec. 4.5.1 (8 % per decade)

Model value: power block from the DOE/PNNL cost basis plus a storage block calibrated on the Silver City total project cost, scaled with size. Customized: your own total project cost per kW, used as is at every size; it is then no longer sourced.

Scaled model CAPEX per kW by rated discharge power

Log in to view this sensitivity chart.

  1. Ex-factory
  2. Installed
  3. Fully financed· this figure
CAPEX at the battery limit—

Included

  • Equipment and installation
  • Indirect and owner's costs
  • Contingency

Not included

  • Nothing

Added at project level

  • Nothing: project mode uses the figure as is

Project figures

Values passed to project mode when this asset is added to a project.

Concept sketch, not to scale · drag to rotate

Electricity for charging in
—
Electricity discharged outMain product
—
CAPEX to the battery limit
—
Fixed O&M
—
Variable O&M, excluding feedstocks
0 EUR/year
Asset lifetime
60 years

Log in to add this asset to a project.

Levelised cost of storage

A standalone indicator for a quick read. Project mode recomputes it for the whole system.

—

  • LCOS: capital—
  • LCOS: fixed O&M—
  • LCOS: charging—

Linked to the balance above

Full equivalent cycles you want a year. Default 365, the PNNL-33283 ceiling of one full cycle a day. The plant cannot do more than the clock allows (charge plus discharge time), and the model caps the request accordingly.

Hours of discharge at rated power; storage energy = power x duration. Silver City and Willow Rock are both 8 h. With the compressor rated at the turbine power, recharging takes duration / RTE, so above about 8 to 10 h a full cycle no longer fits in a day and the achieved cycles fall.

Average price of the electricity bought to charge. Default 26.3 EUR/MWh = the PNNL-33283 0.03 $/kWh at the ECB 2020 rate. Divided by the round-trip efficiency in the LCOS.

Real weighted average cost of capital used in the capital recovery factor. Default 6.52 %, PNNL-33283 Table 6.1. Real, because every cost is in constant money with no escalation.

Period over which the CAPEX is annualised. Default 20 years, the PNNL-33283 baseline. The physical calendar life of a CAES plant is 60 years (PNNL); it is exported to project mode as the asset lifetime and not used here.

Levelised cost of storage by cycles per year (requested)

Log in to view this sensitivity chart.

Benchmarks

This model's figures against published references and reference cases.

Levelised cost of storage, EUR/MWh

87.55 PNNL-33283 Executive summary

131.3 DOE TSA 2023 p.4

525.3 DOE TSA 2023 p.4

CAPEX per kW, EUR/kW

2,655 Power Engineering 2025 (press)

Round-trip efficiency, %

52 Wolf and Budt 2014

52 PNNL-33283 Sec. 4.5.4.2

60 Wolf and Budt 2014

70 DOE CAES TSA 2023 p.2

Model CAPEX at ADELE size, EUR/kW

1,648 PNNL 2020 Table 6

Reference cases at this size and usage

Log in to compare the reference cases.

All results

Every model output at the current settings, grouped, with the sensitivity charts.

60 outputs · 6 groups · 14 also shown above, dimmed

Levelised cost

6
Levelised cost of storage
ComputingEUR/MWh
Total project CAPEX
ComputingEUR
LCOS: capital
ComputingEUR/MWh
LCOS: fixed O&M
ComputingEUR/MWh
LCOS: charging
ComputingEUR/MWh
Capital share of LCOS
Computing%

Size and CAPEX

13
Storage energy
ComputingMWh
Compressor electrical power
ComputingMW
CAPEX per kW
ComputingEUR/kW
Scaled model CAPEX per kW
ComputingEUR/kW
Model CAPEX at 100 MW
ComputingEUR/kW
Size factor
Computingratio
CAPEX per kWh stored
ComputingEUR/kWh
Power block cost
ComputingEUR/kW
Storage block cost
ComputingEUR/kWh
Calibrated storage block
ComputingEUR/kWh
Power block share of CAPEX
Computing%
Power block CAPEX
ComputingEUR
Storage block CAPEX
ComputingEUR

Efficiency and duty

13
Round-trip efficiency
Computing%
Charging energy per MWh delivered
ComputingMWh/MWh
Cycles achieved a year
Computingcycles/year
Maximum cycles a year
Computingcycles/year
Clock cap penalty
Computingratio
Charge time per cycle
Computingh
Charge plus discharge time
Computingh
Discharge hours a year
Computingh/year
Charge hours a year
Computingh/year
Discharge capacity factor
Computing%
Energy discharged a year
ComputingMWh/a
Energy charged a year
ComputingMWh/a
Heat and losses a year
ComputingMWh/a

Sourced domain

7
Outside sourced domain
Computingflag
Power below sourced scaling range
Computingflag
Storage far from calibration point
Computingflag
Model cost drop per tenfold size
Computing%
Howitt cost drop per tenfold size
Computing%
Howitt power island, 40 MW
ComputingEUR/kW
Howitt power island, 1,000 MW
ComputingEUR/kW

Published references

13
Silver City cost per kW
ComputingEUR/kW
Model CAPEX at Willow Rock size
ComputingEUR/kW
Willow Rock DOE loan per kW
ComputingEUR/kW
Willow Rock loan over model
Computingratio
ADELE estimate per kW
ComputingEUR/kW
Model CAPEX at ADELE size
ComputingEUR/kW
ADELE over model
Computingratio
PNNL salt cavern cost
ComputingEUR/kWh
Storage block over salt cavern
Computingratio
PNNL CAES LCOS (diabatic)
ComputingEUR/MWh
DOE CAES cost range, low
ComputingEUR/MWh
DOE CAES cost range, high
ComputingEUR/MWh
PNNL charging price
ComputingEUR/MWh

Finance and yearly costs

8
Capital recovery factor
Computing1/year
Annualised CAPEX
ComputingEUR/year
Fixed O&M size exponent
Computingratio
Fixed O&M per kW
ComputingEUR/kW/year
Fixed O&M a year
ComputingEUR/year
Charging cost a year
ComputingEUR/year
Total yearly cost
ComputingEUR/year
Economic life over calendar life
Computing%

Sensitivities

6 charts
LCOS components vs cycles per year

Log in to view this sensitivity chart.

LCOS components by storage duration

Log in to view this sensitivity chart.

CAPEX per kW and total CAPEX vs rated power

Log in to view this sensitivity chart.

LCOS vs charging price

Log in to view this sensitivity chart.

Round-trip efficiency and LCOS by efficiency basis

Log in to view this sensitivity chart.

Achieved and maximum cycles vs duration

Log in to view this sensitivity chart.

About

Calculator context

Advanced adiabatic compressed air energy storage plant of the Hydrostor type (Silver City, Willow Rock). In charge, grid electricity drives compressors; the compression heat is taken out and kept in a thermal store (hot water), and the cooled air is pushed into an underground cavern, mined in hard rock and held at constant pressure by a column of water, or a salt cavern. In discharge the air comes back up, is reheated with the stored heat and expands through turbines. No fuel is burnt. You set the discharge power (50 to 1,000 MW), the duration (4 to 12 h), the cycles you want a year, the round-trip efficiency basis, the charging price and the finance.

The cost has two blocks, as in PNNL-33283: a power block (turbomachinery, balance of plant and EPC, 1,153 $/kW at 100 MW, the DOE 2023 estimate for 2030 of a diabatic CAES, transposed to the adiabatic plant) and a storage block per kWh. No source prints the A-CAES storage block (mined cavern, hydrostatic compensation, heat store, development), so it is calibrated with one free parameter on the Silver City total project cost published by ARENA (A$652.26m for 200 MW / 1,600 MWh): about 146 EUR/kWh, some 24 times the PNNL salt-cavern cost alone. The model therefore matches Silver City at 200 MW / 8 h by construction; that is the calibration, not a validation. Both blocks fall 8 % per tenfold size, the PNNL scale law fitted on 100 and 1,000 MW. Below 100 MW, and for storage energies more than a factor 2 from 1,600 MWh, the law is extrapolated and an output flag says so.

Hydrostor prints no round-trip efficiency. The default 60 % is the top of the 52-60 % range Wolf and Budt 2014 give for low-temperature adiabatic CAES; DOE 2023 quotes 70 % as an upper bound. The PNNL 52 % is for diabatic, gas-fired CAES and is shown as a reference only. The compressor is rated at the turbine power, so recharging takes duration / RTE: above about 8 to 10 h a full cycle no longer fits in a day and the cycles fall below the PNNL ceiling of 365 a year.

At 200 MW, 8 h, 365 cycles, 60 % RTE, 26.3 EUR/MWh charging (PNNL 0.03 $/kWh), a 6.52 % real WACC and a 20-year economic life, the plant costs about 2,150 EUR/kW (430 MEUR), delivers 584,000 MWh a year and the LCOS is about 115 EUR/MWh, close to 58 % of it capital. At the Willow Rock size (500 MW, 8 h) the model gives about 2,080 EUR/kW and 112 EUR/MWh. Two independent figures bracket the CAPEX: the ADELE estimate (HDR 2014, 10 h) is about 30 % below the model at 400 MW / 10 h, while the Willow Rock DOE loan principal alone is about 28 % above the model at 500 MW / 8 h, so the model is probably low for a 2025 US project. These comparisons mix 2020 USD, 2022 AUD and 2025 USD without inflation correction; the gaps are published as outputs, and the Customized option takes a quote. No revenue, tax or financing during construction: those belong to project mode, which reads this CAPEX as a total project cost.

Model

128 variables — inputs, calculations and outputs, with their dependencies.

128 variables shown of 128
VariableValueUnitDepends on
200MW—
8h—
365cycles/year—
2——
0——
2650EUR/kW—
26.3EUR/MWh—
6.52%—
20years—
VariableFormulaUnitDepends on
if((<=)+(<=)+(<=)+(<)+(>)+(<)+(>)+(<=)+(<)+(<)+(>)+(<=)>,,)bool
*kW
*ratio
/EUR/kW
/EUR
*(/)^(-)**EUR
*ratio
/h
(+)*MW
VariableFormulaUnitDepends on
*MWh
if(==,,if(==,,))%
/max(,)MWh/MWh
*MW
*/max(,)h
+h
min(,/max(,))cycles/year
min(,)cycles/year
/max(,)ratio
*h/year
*h/year
/*%
*MWh/a
*MWh/a
-MWh/a
(/)^(-)ratio
*EUR/kW
/(*)EUR/kW
(-)/(*)EUR/kWh
*(/)^(-)EUR/kWh
+*(*/)^(-)*EUR/kW
clamp(if(>=,,*(/)^(-)),,)EUR/kW
EUR/kW
*EUR
/max(*,)EUR/kWh
/max(+*,)*%
**EUR
-EUR
ln(/)/ln(/)ratio
/*(/)^EUR/kW/year
*EUR/year
if(<,/,(*(+)^)/max((+)^-,))1/year
*EUR/year
*EUR/year
++EUR/year
/max(,)EUR/MWh
/max(,)EUR/MWh
/max(,)EUR/MWh
++EUR/MWh
/max(,)*%
if(<,,)flag
if((</)+(>*)>,,)flag
max(,)flag
/*%
*(/)^(-)+*(/)^(-)*EUR/kW
//(*)EUR/kW
/max(,)ratio
/EUR/kW
*(/)^(-)+*(*/)^(-)*EUR/kW
/max(,)ratio
/EUR/kWh
/max(,)ratio
/EUR/kW
/EUR/kW
(-exp(ln(/)*ln()/ln(/)))*%
(-^(-))*%
*/EUR/MWh
*/EUR/MWh
*/EUR/MWh
*/EUR/MWh

Assumptions

68 assumptions used in the calculations

  • Lower limit in guards.

    0
    Numerical constant
  • Unit multiplier in the CRF, guards and Customized switch.

    1
    Numerical constant
  • Protects divisions.

    0
    Numerical constant
  • Percent to fraction.

    0.01
    Numerical constant
  • Fraction to percent.

    100
    Numerical constant
  • MW to kW.

    1000kW/MW
    Numerical constant
  • MWh to kWh.

    1000kWh/MWh
    Numerical constant
  • Hours in a non-leap year, the clock that caps the cycles.

    8760h/year
    Numerical constant
  • Base of the 'per decade' cost drop (a tenfold size increase).

    10
    Numerical constant
  • Identifier of the low end of the Wolf and Budt 2014 low-temperature A-CAES range (52 %).

    1
    Selector
  • Identifier of the high end of the Wolf and Budt 2014 low-temperature A-CAES range (60 %), the default.

    2
    Selector
  • Identifier of the DOE 2023 upper bound for adiabatic CAES (70 %).

    3
    Selector
  • Low end of the published round-trip efficiency of low-temperature adiabatic CAES (thermal store below about 200 C, hot water or oil), the closest published match to a hot-water A-CAES plant of the Hydrostor type.

    52%
    Wolf and Budt 2014
  • High end of the Wolf and Budt range and the default case. Hydrostor prints no round-trip efficiency for Silver City or Willow Rock; a 60-65 % figure quoted in the press is not used.

    60%
    Wolf and Budt 2014
  • Upper bound quoted by DOE for adiabatic CAES; an optimistic case, not a measured plant value.

    Market range upper bound only; no plant measurement cited

    70%
    DOE CAES TSA 2023 p.2
  • Diabatic CAES baseline of PNNL (natural gas reheating). Shown as a reference only: a diabatic plant burns gas at discharge, so its 52 % is not comparable one-to-one with an adiabatic plant.

    Market range DOE 2023: diabatic 46-54 %

    52%
    PNNL-33283 Sec. 4.5.4.2
  • Ceiling of one full equivalent cycle a day used by PNNL for the LCOS. The model also applies the clock: charge plus discharge time must fit in 24 h.

    365cycles/year
    PNNL-33283 Sec. 6.1.3
  • Compressor electrical input / rated discharge power. Set at 1 because the cost basis prices compressor and turbine on the same kW; Hydrostor does not publish the compressor rating. With RTE below 100 %, recharging then takes duration / RTE, so above about 8 to 10 h a daily cycle no longer fits in 24 h.

    Market range no published compressor rating for Silver City or Willow Rock

    1
    DOE TSA 2023 Table 1 (cost basis), not a published plant rating
  • Power-block cost at the 100 MW reference: turbomachinery, balance of plant and EPC. DOE 2030 estimate for a diabatic CAES, transposed to the adiabatic plant (evidence medium); the heat exchangers and thermal store sit in the storage block, calibrated on Silver City.

    Market range Howitt 2021 power island 890 $/kW at 40 MW, 725 $/kW at 1,000 MW (narrower scope)

    1153USD/kW
    AI
  • Converts the PNNL/DOE cost basis to EUR. No dollar year is printed for it; PNNL-33283 carries its CAES estimates from the 2020 report, so the 2020 rate is used (the 2021 rate, 1.1827, would lower the power block by 3.4 %). No inflation correction between this basis and the 2022 AUD Silver City cost: the model mixes the two and says so.

    1.1422USD/EUR
    ECB 2020
  • Converts the Silver City cost (AUD, project start August 2022) to EUR.

    1.5167AUD/EUR
    ECB 2022
  • Converts the 2025 Willow Rock loan figure to EUR.

    1.13USD/EUR
    ECB 2025
  • Size exponent of the CAPEX: cost per kW multiplied by 0.92 for each tenfold increase in size, applied by PNNL to both the power block (in MW) and the storage block (in MWh). The model applies it to both blocks; at fixed duration the total cost per kW then follows (P / 100 MW)^(0.963788 - 1). PNNL fits this on 100 and 1,000 MW; below 100 MW it is an extrapolation, flagged by an output.

    Market range Howitt 2021 power-island points imply about 13.6 % per decade over 40-1,000 MW (computed in an output)

    0.963788
    PNNL-33283 Sec. 4.5.1 (8 % per decade)
  • Reference size of the scale law, the size of the cited 1,153 $/kW power-block cost.

    100MW
    PNNL-33283 Sec. 4.5.1
  • Total project cost of Silver City (Broken Hill), the single cost anchor of the storage block.

    652260000AUD
    ARENA project page
  • Rated power of Silver City, catalogue product and calibration point.

    200MW
    ARENA project page
  • Storage energy of Silver City: the reference size of the storage-block scale law, because the storage block is calibrated at this size.

    1600MWh
    ARENA project page
  • Width of the band around the 1,600 MWh calibration point inside which the storage block is read as anchored. Outside it the 8 %/decade slope is transposed from the PNNL salt-cavern scaling, and the output flag says so.

    2
    Model choice (declared)
  • Rated power of Willow Rock, catalogue product, used only for the convergence check.

    500MW
    Power Engineering 2025
  • Storage energy of Willow Rock (8 h), used only for the convergence check.

    4000MWh
    Power Engineering 2025
  • Loan principal only, before equity: a lower bound of the project cost, from the press, not from a cost breakdown.

    Market range conditional commitment, not a final cost

    1500000000USD
    Power Engineering 2025 (press)
  • Independent adiabatic CAES estimate (ADELE, Germany), 2020 USD, used as a benchmark only. PNNL treats it as a high value and excludes it from its average.

    1882USD/kW
    PNNL 2020 Table 6 (HDR 2014)
  • Low end of the ADELE power range.

    300MW
    PNNL 2020 Table 6
  • High end of the ADELE power range.

    500MW
    PNNL 2020 Table 6
  • Duration of the ADELE estimate.

    10h
    PNNL 2020 Table 6
  • Mid-point of a published range (ADELE 300-500 MW).

    0.5
    Numerical constant
  • Fixed O&M at 100 MW. Converted at the 2020 rate like the rest of the PNNL/DOE basis, without inflation adjustment.

    16.12USD/kW/year
    PNNL-33283 Sec. 4.5.2.1
  • Fixed O&M at 1,000 MW. The model interpolates log-log between the two PNNL points; the exponent is deduced from them, not printed.

    9.82USD/kW/year
    PNNL-33283 Sec. 4.5.2.1
  • Size of the second PNNL fixed O&M point.

    1000MW
    PNNL-33283 Sec. 4.5.2.1
  • Physical service life of a CAES plant (caverns and turbomachinery). Exported to project mode as the asset lifetime; the standalone LCOS annualises over the 20-year economic life instead, as PNNL does.

    60years
    PNNL-33283 Sec. 4.5.4.1
  • Salt-cavern cost only, without thermal store or a mined hard-rock cavern. Shown next to the storage block, not used as its default: the A-CAES storage block (mined cavern, hydrostatic compensation, thermal store, development) is about 24 times higher.

    6.9USD/kWh
    PNNL-33283 Table 4.28
  • Adiabatic power island at 40 MW, the only cost point below 100 MW. Narrower scope than the 1,153 $/kW power block (no full BOP and EPC).

    890USD/kW
    PNNL-33283 Sec. 4.5.1 (Howitt 2021)
  • Adiabatic power island at 1,000 MW. With the 40 MW point it gives an independent slope check of the 8 %/decade law.

    725USD/kW
    PNNL-33283 Sec. 4.5.1 (Howitt 2021)
  • Size of the small Howitt power-island point.

    40MW
    PNNL-33283 Sec. 4.5.1
  • Published LCOS of diabatic CAES at 1,000 MW and 10 h, a benchmark only: different technology (gas-fired reheating, salt cavern) and different scope.

    0.1USD/kWh
    PNNL-33283 Executive summary
  • Low end of the DOE-reported range of CAES stored-electricity costs. The cost year of the underlying studies is not given; converted at the 2020 rate for an indicative comparison only.

    0.15USD/kWh
    DOE TSA 2023 p.4
  • High end of the DOE-reported range; indicative comparison only, cost year not given.

    0.6USD/kWh
    DOE TSA 2023 p.4
  • PNNL charging price, converted to EUR/MWh in an output; it sets the default of the charging price input (26.3 EUR/MWh).

    0.03USD/kWh
    PNNL-33283 Table 6.1
  • Floor of the scaled CAPEX clamp. The model gives 1,490 to 2,850 EUR/kW over 50-1,000 MW x 4-12 h, so the floor never binds inside the sliders.

    500EUR/kW
    Model guard
  • Ceiling of the scaled CAPEX clamp; never binds inside the sliders.

    6000EUR/kW
    Model guard
  • Default real WACC of the standalone LCOS. Real, because no cost line is escalated.

    6.52%
    PNNL-33283 Table 6.1
  • Default annualisation period. Shorter than the 60-year calendar life; PNNL uses 20 years for every technology so that LCOS values compare.

    20years
    PNNL-33283 Sec. 6.1.1
  • Default charging price, a US planning value, not a European market price. The slider stops at 50 EUR/MWh: above it the LCOS leaves the sourced range.

    26.3EUR/MWh
    PNNL-33283 Table 6.1
  • Default request: one full cycle a day, the PNNL ceiling.

    365cycles/year
    PNNL-33283 Sec. 6.1.3
  • Not used: the model defines the storage energy as the energy actually delivered per cycle (power x duration) and counts full equivalent cycles, so no depth-of-discharge factor applies. A cavern held at constant pressure by hydrostatic compensation delivers its working volume.

    80%
    PNNL-33283 Sec. 6.1.3
  • Not used: the standalone LCOS carries no interest during construction (simplification of PNNL Eq. 1). Project mode holds the schedule and the financing.

    3years
    PNNL-33283 Table 6.2
  • Storage block of A-CAES: mined hard-rock cavern with hydrostatic compensation, thermal store, development and everything in the Silver City total project cost that the power block does not cover. Computed in the model from the Silver City figures (node storage_block_capex_calibrated_eur_per_kwh), so the CAPEX at 200 MW / 8 h equals Silver City by construction.

    Market range PNNL salt cavern alone 2.7-13.8 $/kWh (not comparable: no heat store, no mined cavern)

    145.7EUR/kWh
    Derived from ARENA Silver City
  • Origin of the size exponent 0.963788 = 1 + log10(0.92).

    0.08
    PNNL-33283 Sec. 4.5.1
  • Benchmark only: diabatic CAES (gas-fired reheating, salt cavern) at 1,000 MW / 10 h, a cheaper technology than a mined-cavern A-CAES. Same simplified LCOS family (PNNL Eq. 1).

    87.55EUR/MWh
    PNNL-33283 Executive summary
  • Benchmark only: low end of the DOE-reported range. The cost year of the underlying studies is not stated, so the comparison is indicative.

    131.33EUR/MWh
    DOE TSA 2023 p.4
  • Benchmark only: high end of the DOE-reported range; cost year not stated, indicative.

    525.3EUR/MWh
    DOE TSA 2023 p.4
  • Benchmark of the CAPEX per kW, for a 10 h plant: compare with the model at 400 MW / 10 h (output), not at the current configuration. Scope: total plant estimate.

    1,647.7EUR/kW
    PNNL 2020 Table 6
  • Benchmark of the CAPEX per kW for an 8 h plant: loan principal only, before equity, so a lower bound of the project cost; 2025 USD.

    2,654.87EUR/kW
    Power Engineering 2025 (press)
  • LCOS of the PNNL-33283 type (Eq. 1), simplified: (CRF x CAPEX + fixed O&M) / energy delivered + charging price / RTE. No interest during construction, no tax, no revenue, no replacement within the 20-year economic life. Constant money, so the WACC is real.

    —
    Unspecified
  • The round-trip efficiency is a sourced system-level value, not derived from a compressor/expander chain: Hydrostor publishes no efficiency and no component split, so the model does not invent one. The PNNL and DOE test values (52 %) are for diabatic CAES and are shown as references only.

    —
    Unspecified
  • Charge time = duration / (RTE x charge power ratio). With the compressor rated at the turbine power, a full cycle fits in 24 h up to about 8.2 h (RTE 52 %) to 9.9 h (RTE 70 %); beyond, the achieved cycles fall below 365 and the LCOS rises. PNNL's own Eq. 2 applies the same clock.

    —
    Unspecified
  • Two parts of the slider range sit outside the sourced domain and are flagged: below 100 MW (the PNNL scale law rests on 100 and 1,000 MW; only the 40 MW Howitt power-island point touches that range), and storage energies more than a factor 2 from 1,600 MWh (the storage block rests on one calibration point).

    —
    Unspecified
  • Project mode chains the charging electricity (inlet, priced by the project) and the discharged electricity (main outlet). Fixed O&M is exported undiscounted; no variable O&M is booked, so charging is never paid twice. The CAPEX is a total project cost (battery_limit fully_financed), so project mode adds no buildup on top.

    —
    Unspecified