Skip to main content
Equipment catalogPornainen Sand Battery
Polar Night Energy

Pornainen Sand Battery

Industrial-scale Sand Battery

StorageSolid-media thermal energy storage
PO
Thermal storage capacity
100MWh
Thermal discharge power
1MW
Max storage temperature
400°C
Round-trip efficiency
80%

Characteristics

4 of 6 fields · all sourced · retrieved 2026-10-15
Thermal storage capacity
100MWh
Thermal discharge power
1MW
Max storage temperature
400°C
Round-trip efficiency
80%

Polar Night Energy delivered the Pornainen Sand Battery to Finnish district heating company Loviisan Lämpö as a turnkey project. It is the primary production plant of the local heating network, with 1 MW of heating power and up to 100 MWh of thermal storage, about ten times larger than the Sand Battery running in Kankaanpää since 2022. The storage medium is 2,000 tons of crushed soapstone, a by-product of Tulikivi's fireplace production, which reaches a maximum storage temperature of 400 °C. The battery charges from the grid using optimized algorithms, mainly at low spot prices. It is designed to take part in reserve and balancing markets, with Elisa optimizing its charging and reserve market participation. The existing woodchip plant stays on as a backup and peak-load facility, and the network's emissions are expected to fall by 70%, around 160 t CO2e per year.

Manufacturer datasheet (24)

Height
approximately 13 meters highm
Width
15 meters widem
Diameter
15 metres in diameterm
Enclosure
steel-clad
Storage medium
crushed soapstone, a by-product of fireplace manufacturing
Storage medium mass
2 000 Tons of soapstonet
Storage medium delivery
Forty truckloads of crushed soapstone
Client
Loviisan Lämpö
Location
Pornainen, Finland
Year
2025
Sector
Heating
Delivery model
turnkey project
Role in network
primary production plant of the local heating network
Storage duration
almost one-month heat demand in summer and a one-week demand in winter in Pornainen
Reduction in GHG emissions
70%%
Annual emissions cut
160 t CO₂e per yeart CO2e/yr
Reduction in woodchip combustion
60%%
Saved forest
14 Hectares of saved forest per yearha/yr
Toxic materials used
Zero
Operation and maintenance costs
Low
Backup
The existing wood-chip power plant will remain in operation as a backup and peak-load facility
Reserve market operator
Elisa
Reserve market
electricity reserve markets for the Finnish transmission system operator, Fingrid
Funding support
Business Finland’s new technology energy aid