CO2 Battery 23 MW / 200 MWh County Offaly (Google)

23 MW / 200 MWh CO2 Battery near Rhode, Ireland, contracted with Google

StorageCO2 battery energy storage plant
CO
Rated power
23MW
Energy capacity
200MWh
Round-trip efficiency
70%

Characteristics

3 of 4 fields · all sourced · retrieved 2026-10-27
Rated power
23MW
Energy capacity
200MWh
Round-trip efficiency
70%

A 23 MW / 200 MWh CO2 Battery near Rhode, County Offaly, on the site of a former peat-fired power plant, and the first bilateral commercial contract between Energy Dome and Google. Energy Dome develops, owns and operates the plant, which compresses and stores CO2 with grid power and expands it through a turbine when power is needed. The project holds land, planning consent, a grid connection and a 10-year EirGrid capacity contract, and is expected online in 2028; a second 200 MWh unit is planned on the site.

Manufacturer datasheet (5)

Location
County Offaly, Ireland
Offtaker
Google
Expected online
2028
Capacity contract
10-year capacity contract by EirGrid
Local developer
Lumcloon Energy