Energy mass balanceCostingEquipment sizingBiomass
Wood pellet plant: drying heat by feedstock moisture, grinding and pelleting electricity, production cost per tonne
Wood pellet plant from wet sawdust or chips: feedstock and water evaporated from the moisture balance, drying heat, electricity, all-in CAPEX on Pirraglia's scale law and the production cost in EUR/t and EUR/MWh.
- CurrencyEUR 2023
- Battery limitfully financed
- 67 documented assumptions
- Updated2 Nov 2026
Mass and energy balance
What the asset draws and delivers for the case and load you choose.
Reference case
Hours per year at nominal output. EUBIA's example plant runs 8,000 h; Sultana 2010 uses 7,200 h and Pirraglia 2010 8,400 h. Fewer hours spread capital and the fixed staff over fewer tonnes.
Flows
- In: Wet wood (sawdust or chips)—
- In: Drying heat (delivered to the dryer)—
- In: Electricity (grinding, pelleting, cooling)—
Asset
Wood pellet plant
- Out: Wood pellets—
Annual quantities at the current usage. Band width: share of energy in; non-energy flows are not to scale.
Finished pellets leaving the plant at nominal rate. 1-40 t/h covers containerized units to large export plants; it includes the catalogue products PRODESA containerized plant (6 t/h, the default) and AMANDUS KAHL press 65-1500 (12 t/h, a press alone, without drying or grinding). The CAPEX is anchored on Pirraglia's 8.93 t/h plant and scaled with an exponent of 0.7.
- Feedstock input
- — t/h
- Water evaporated
- — t/h
- Drying heat duty
- — MW
- Electric load
- — MW
CAPEX
Specific cost at this size, what backs it, and how it behaves with scale.
Specific CAPEX at this size
—
Reference size 8.93 t/h
Pirraglia 2010 p. 2380
Model value: Pirraglia's total installed cost escalated to 2023 EUR and scaled to the size. Customized: your own all-in figure per t/h, used as is at every size and no longer sourced.
Log in to view this sensitivity chart.
- Ex-factory
- Installed
- Fully financed· this figure
Included
- Equipment and installation
- Indirect and owner's costs
- Contingency
Not included
- Nothing
Added at project level
- Nothing: project mode uses the figure as is
Project figures
Values passed to project mode when this asset is added to a project.
- Wet wood (sawdust or chips) in
- —
- Drying heat (delivered to the dryer) in
- —
- Electricity (grinding, pelleting, cooling) in
- —
- Wood pellets outMain product
- —
- CAPEX to the battery limit
- —
- Fixed O&M
- —
- Variable O&M, excluding feedstocks
- —
- Asset lifetime
- 30 years
Log in to add this asset to a project.
Pellet production cost
A standalone indicator for a quick read. Project mode recomputes it for the whole system.
—
- Cost - feedstock—
- Cost - drying heat—
- Cost - electricity—
- Cost - capital—
- Cost - staff—
- Cost - maintenance and consumables—
Linked to the balance above
Hours per year at nominal output. EUBIA's example plant runs 8,000 h; Sultana 2010 uses 7,200 h and Pirraglia 2010 8,400 h. Fewer hours spread capital and the fixed staff over fewer tonnes.
Water as a share of the wet mass of sawdust or chips received. It sets the tonnes to buy and the water the dryer must evaporate. 35 % is the TFZ wood-chip price basis; fresh sawdust is around 50-55 % (EUBIA example: 55 %).
Moisture of the finished pellets. Sultana 2010 dries to 8-10 %; ENplus A1 requires 10 % or less.
Delivered price per wet tonne at the moisture entered above. Default 108 EUR/t is TFZ's wood-chip price at 35 % moisture (July 2026). A wetter feed should come with a lower price per wet tonne: the results show the price per tonne of dry matter.
Furnace case: wood-chip fuel price per MWh LHV (TFZ July 2026: 3.4 ct/kWh = 34 EUR/MWh). Waste-heat case: price of heat delivered to the dryer, often well below a fuel price.
Delivered price excluding VAT. Default 180 EUR/MWh is Eurostat's EU average non-household price, S1 2026.
Whole-plant electricity per tonne of pellets: grinding, pelleting, cooling, conveying. EUBIA gives 80-150 kWh/t; the default is the midpoint. Hardwood and fine dies sit at the top of the range.
Real rate for the capital annuity, as a fraction. Default 10 % is Sultana 2010's internal rate of return; costs are held constant over the life, so the rate is real.
Annuity period. Default 30 years is Sultana 2010's plant life.
Log in to view this sensitivity chart.
Benchmarks
This model's figures against published references and reference cases.
Electricity per t of pellets, kWh/t
80 EUBIA
150 EUBIA
Process energy at 55 -> 10 % drying, kWh/t
1,140 EUBIA / Obernberger
Pellet production cost per MWh, EUR/MWh
85 TFZ Juli 2026
Pellet production cost, EUR/t
402 TFZ Juli 2026
Reference cases at this size and usage
Log in to compare the reference cases.
All results
Every model output at the current settings, grouped, with the sensitivity charts.
70 outputs · 4 groups · 21 also shown above, dimmed
Production cost
16- Cost - maintenance
- ComputingEUR/t
- Cost - dies, rollers and screens
- ComputingEUR/t
- Feedstock share of cost
- Computing%
- Feedstock price per t of dry matter
- ComputingEUR/t
- Cost with a 0.6 scale exponent
- ComputingEUR/t
- Gap to retail pellet price
- ComputingEUR/t
- Cost as share of retail price
- Computing%
- Pirraglia production cost (2009 EUR)
- ComputingEUR/t
Feedstock and drying
16- Feedstock per t of pellets
- Computingt/t
- Dry matter in pellets
- Computingt/h
- Dry matter in feedstock
- Computingt/h
- Dry-matter loss factor
- Computingratio
- Dry matter lost per year
- Computingt
- Water evaporated per year
- Computingt
- Water evaporated per t of pellets
- Computingt/t
- Drying heat per year
- ComputingMWh
- Drying heat per t of pellets
- ComputingkWh/t
- Heat supply efficiency
- Computingratio
- Drying heat bought per year
- ComputingMWh
Electricity and energy balance
14- Electricity vs EUBIA midpoint
- ComputingkWh/t
- Electricity inside EUBIA range
- Computingbool
- Electricity per year
- ComputingMWh
- Process energy per t of pellets
- ComputingkWh/t
- Gap to Obernberger total
- Computing%
- Pellet LHV
- ComputingMWh/t
- Pellet energy per year
- ComputingMWh
- Process energy vs pellet energy
- Computing%
- Operating hours
- Computingh/year
- Capacity factor
- Computing%
Capital and O&M
24- Total installed CAPEX (MEUR)
- ComputingMEUR
- Reference specific CAPEX
- ComputingEUR/(t/h)
- Reference plant CAPEX (2023 EUR)
- ComputingEUR
- CEPCI escalation 2009 -> 2023
- Computingratio
- Reference plant rate (check)
- Computingt/h
- Direct installed cost
- ComputingEUR
- Indirect costs
- ComputingEUR
- Contingency
- ComputingEUR
- CAPEX per annual tonne
- ComputingEUR/(t/year)
- CAPEX with a 0.6 scale exponent
- ComputingEUR
- Exponent implied by Pirraglia's two plants
- Computingratio
- Capital recovery factor
- Computing1/year
- Annualised CAPEX
- ComputingEUR/year
- Maintenance
- ComputingEUR/year
- Paid labour hours
- Computingh/year
- Staff cost
- ComputingEUR/year
- Feedstock cost per year
- ComputingEUR/year
- Drying heat cost per year
- ComputingEUR/year
- Electricity cost per year
- ComputingEUR/year
- Total annual cost
- ComputingEUR/year
Sensitivities
5 chartsLog in to view this sensitivity chart.
Log in to view this sensitivity chart.
Log in to view this sensitivity chart.
Log in to view this sensitivity chart.
Log in to view this sensitivity chart.
Sources
67 documented assumptions · 10 sources
- bioresources.cnr.ncsu.eduPirraglia, Gonzalez, Saloni (2010), Techno-economical analysis of wood pellets production for U.S. manufacturers, BioResources 5(4)CAPEX, scale exponent 0.7, Tables 2 and 4
- doi.orgSultana, Kumar, Harfield (2010), Development of agri-pellet production cost and optimum size, Bioresource Technology 101loss, staffing, maintenance, consumables, furnace efficiency, life and rate
- eubia.orgEUBIA, Biomass pelleting - economics, applications and standards950 kWh per t of water, 80-150 kWh/t electricity, 1,140 kWh/t total
- ornl.govMani, Sokhansanj, Bi, Turhollow (2006), Economics of producing fuel pellets from biomass (ORNL)
- tfz.bayern.deTFZ Bayern, Entwicklung der Brennstoffpreise (July 2026)wood chips 108 EUR/t at 35 %, 3.4 ct/kWh; pellets 402 EUR/t, 8.5 ct/kWh
- enplus-pellets.euENplus Handbook part III (2023)A1 LHV >= 16.5 MJ/kg, moisture <= 10 %
- chemengonline.comChemical Engineering, CEPCI 2023 annual average 797.9 (2009521.9)
- data.ecb.europa.euECB, USD/EUR annual reference rate2009 = 1.3948, 2023 = 1.0813
- ec.europa.euEurostat, electricity price statisticsEU non-household S1 2026 = 0.18 EUR/kWh
- ec.europa.euEurostat, EU hourly labour costs 2024EUR 33.5 average
About
Calculator context
About
Calculator context
A screening model of a wood pellet plant (reception, belt or drum dryer, hammer mill, pellet press with conditioning, cooler and screen, bulk storage) for a feasibility study that has to stand in front of a lender. A dry-matter balance with Sultana's 5 % material loss sets the wet sawdust or chips to receive and the water the dryer must remove; each tonne of water costs EUBIA's 950 kWh of heat, a figure that already includes the dryer's real efficiency. Two heat sources: a wood-chip furnace at 80 % efficiency (Sultana 2010) priced on TFZ's 34 EUR/MWh, or waste heat bought as delivered. Whole-plant electricity is an input in EUBIA's 80-150 kWh/t range. The CAPEX is Pirraglia's total installed cost of a 75,000 t/yr, 8.93 t/h plant (USD 12.249 M in 2009, indirects and contingency included), escalated with CEPCI to 2023, converted at the ECB 2023 rate (17.32 MEUR) and scaled with the 0.7 exponent the authors apply; a customized all-in figure is used as is. Staff is held flat with size (Sultana: 4 workers per shift for a bulk plant, 1 maintenance worker, 4 salaried staff) at Eurostat's 33.5 EUR/h; maintenance is 2.5 % of CAPEX a year.
At 6 t/h (the PRODESA containerized plant size), 8,000 h, feedstock at 35 % moisture and 108 EUR/t, pellets at 8 %, furnace heat, 180 EUR/MWh electricity, 115 kWh/t, 10 % and 30 years, the plant receives 8.94 t/h of wet wood, evaporates 2.65 t/h of water, needs 419 kWh of drying heat and 115 kWh of electricity per tonne, costs 13.1 MEUR all-in and produces pellets at 267 EUR/t, or 58.3 EUR/MWh LHV, of which feedstock is 161, staff 30 and capital 29 EUR/t. Size matters through capital and staff: about 441 EUR/t at 1 t/h and 227 EUR/t at 40 t/h; a 60 % moisture feed at the same price per wet tonne gives 406 EUR/t. Recomputed at EUBIA's 55 -> 10 % example, the model needs 1,120 kWh/t against Obernberger's 1,140 quoted on the same EUBIA page: a consistency check, not an independent validation. Pirraglia's two published plants imply an exponent of 0.89, above the 0.7 applied, so above 8.93 t/h the CAPEX may be understated; Sultana reports 0.6 for wood pellet equipment, shown as a sensitivity.
Limits: money years differ (CAPEX 2023 EUR, labour 2024, prices 2026) and are not reconciled; staffing is EU-average and flat with size; bagging, transport and the feedstock supply chain are excluded. The retail pellet price (TFZ, July 2026: 402 EUR/t) includes VAT, distribution and margin and is a ceiling, not a production cost. The CAPEX is all-in and is exported to project mode with battery_limit = fully_financed.
Model
135 variables — inputs, calculations and outputs, with their dependencies.
Model
135 variables — inputs, calculations and outputs, with their dependencies.
| Variable | Value | Unit | Depends on |
|---|---|---|---|
| 6 | t/h | — | |
| 8000 | h/year | — | |
| 1 | — | — | |
| 0 | — | — | |
| 2200000 | EUR/(t/h) | — | |
| 35 | % | — | |
| 8 | % | — | |
| 108 | EUR/t | — | |
| 34 | EUR/MWh | — | |
| 180 | EUR/MWh | — | |
| 115 | kWh/t | — | |
| 0.1 | ratio | — | |
| 30 | years | — |
| Variable | Formula | Unit | Depends on |
|---|---|---|---|
if((<=)+(<=)+(>)+(!=)*(!=)+(<)+(>)+(>=)*(<=)+(<)+(>=)+(<)+(>)+(<)+(<)+(<)+(<=)+(<)+(>=)+(<)+(>)>,,) | bool |
| Variable | Formula | Unit | Depends on |
|---|---|---|---|
min(,) | h/year | ||
/* | % | ||
* | t | ||
/(-) | ratio | ||
*(-*) | t/h | ||
* | t/h | ||
/max(-*,) | t/h | ||
* | t | ||
/max(,) | t/t | ||
(-)* | t | ||
max(**-**,) | t/h | ||
* | t | ||
/max(,) | t/t | ||
*/ | MW | ||
* | MWh | ||
*/max(,) | kWh/t | ||
if(==,,) | ratio | ||
/max(,) | MWh | ||
| kWh/t | ||
- | kWh/t | ||
if((<)+(>)>,,) | bool | ||
*/ | MWh | ||
*/ | MW | ||
+ | kWh/t | ||
/ | MWh/t | ||
* | MWh | ||
//max(,)* | % | ||
+ | MWh | ||
max((-*)*/(-*)**-*,)*+ | kWh/t | ||
(/-)* | % | ||
/ | ratio | ||
*/ | EUR | ||
/ | t/h | ||
/ | EUR/(t/h) | ||
if(>=,,clamp(*(/)^(-),,)) | EUR/(t/h) | ||
* | EUR | ||
/ | MEUR | ||
/(++) | EUR | ||
* | EUR | ||
* | EUR | ||
/max(,) | EUR/(t/year) | ||
if(>=,,*(/)^(-)*) | EUR | ||
ln(/)/ln(/) | ratio | ||
if(<,/max(,),(*(+)^)/max((+)^-,)) | 1/year | ||
* | EUR/year | ||
* | EUR/year | ||
*+*+* | h/year | ||
* | EUR/year | ||
+ | EUR/year | ||
/* | EUR/year | ||
* | EUR/year | ||
* | EUR/year | ||
* | EUR/year | ||
+++++ | EUR/year | ||
/max(,) | EUR/t | ||
/max(,) | EUR/t | ||
/max(,) | EUR/t | ||
/max(,) | EUR/t | ||
+ | EUR/t | ||
/max(,) | EUR/t | ||
/max(,) | EUR/t | ||
/max(,) | EUR/t | ||
/max(,) | EUR/t | ||
/max(,) | EUR/MWh | ||
/max(,)* | % | ||
/max(-*,) | EUR/t | ||
+(-)*(+)/max(,) | EUR/t | ||
- | EUR/t | ||
/* | % | ||
/ | EUR/t |
Assumptions
67 assumptions used in the calculations
Assumptions
67 assumptions used in the calculations
Prevents division by zero.
Market range Not applicable.
0.000001Numerical constantNamed zero for guards (no inline literal).
Market range Not applicable.
0Numerical constantNamed one for guards, the annuity formula and the waste-heat supply efficiency.
Market range Not applicable.
1Numerical constantCalendar hours, upper limit of operating hours.
Market range Not applicable.
8760h/yearNumerical constant100 % for percent conversions and guards.
Market range Not applicable.
100%Numerical constantPercent to fraction.
Market range Not applicable.
0.01Numerical constantUnit conversion.
Market range Not applicable.
1000kWh/MWhNumerical constantUnit conversion: MJ/kg divided by 3.6 gives kWh/kg, i.e. MWh/t.
Market range Not applicable.
3.6MJ/kWhNumerical constantUnit conversion.
Market range Not applicable.
1000000EUR/MEURNumerical constantSelector value: drying heat from a wood-chip furnace.
Market range Not applicable.
1Numerical constantSelector value: drying heat bought as waste heat.
Market range Not applicable.
2Numerical constantGuard: the annuity is not computed for an economic life under 10 years.
Market range Not applicable.
10yearsNumerical constantGuard: the annuity is not computed beyond 40 years.
Market range Not applicable.
40yearsNumerical constantShare of the dry matter lost between reception and finished pellets (fines, screenings, spills). Applied on the dry-matter balance, so 1/(1-0.05) = 1.053 t of dry matter enters per t of dry matter shipped.
Market range No independent range cited.
0.05ratioSultana 2010 Table 4 p. 5613Heat supplied to the dryer per tonne of water evaporated. The figure already includes the real dryer efficiency (latent heat of water is about 627 kWh/t at 100 degC, so 950 implies about 66 %); no latent-heat / efficiency division is applied on top of it.
Market range No independent range cited.
950kWh/tEUBIA pelleting economicsNet calorific value as received of the finished pellets, ENplus A1 minimum. Used to express the cost per MWh LHV for chaining with a pellet or chip boiler; a pellet above the minimum gives a slightly lower cost per MWh.
Market range ENplus A1 >= 16.5 MJ/kg; typical 16.5-19 MJ/kg as received.
16.5MJ/kgENplus A1Upper limit of pellet moisture accepted by the model (guard): a pellet above 10 % is not ENplus A1.
Market range No independent range cited.
10%ENplus A1Low end of the whole-plant electricity demand (grinding, pelleting, cooling, conveying) per tonne of pellets. Used to flag an input outside the EUBIA range and as a benchmark.
Market range No independent range cited.
80kWh/tEUBIAHigh end of the EUBIA electricity range. Used to flag an input outside the range and as a benchmark.
Market range No independent range cited.
150kWh/tEUBIADefault of the electricity demand input and reference for the deviation output. The midpoint is not printed by EUBIA; it is a derived central value. Pirraglia 2010 gives the split of plant energy use (pelleting 13 %, size reduction 4 %, drying 70 %), which is why grinding and pelleting are not modelled as separate sourced lines here.
Market range115kWh/tEUBIA range midpointPublished total energy demand (drying heat plus electricity) per tonne of pellets for drying 55 -> 10 %. The model recomputes this case with its own mass balance; both figures come from the same EUBIA page, so it is a consistency check, not an independent validation.
Market range No independent range cited.
1140kWh/tEUBIA / ObernbergerFeed moisture of the EUBIA/Obernberger reference case.
Market range No independent range cited.
55%EUBIA examplePellet moisture of the EUBIA/Obernberger reference case.
Market range No independent range cited.
10%EUBIA exampleEfficiency of the wood-chip furnace that supplies the dryer in the biomass case: MWh of fuel bought per MWh of heat delivered to the dryer = 1/0.80. In the waste-heat case the heat is bought as delivered (efficiency 1).
Market range No independent range cited.
0.8ratioSultana 2010 p. 5616-5617Total installed cost of the reference plant (reception, dryer, hammer mill, pellet mill, cooler, storage, building, installation, indirect costs and contingency), in 2009 USD. It is an all-in figure, not a purchase price.
Market range No independent range cited.
12249000USDPirraglia 2010 Table 2 p. 2381Annual output of the CAPEX reference plant.
Market range No independent range cited.
75000t/yearPirraglia 2010Operating hours of the CAPEX reference plant; 75,000 / 8,400 = 8.93 t/h.
Market range No independent range cited.
8400h/yearPirraglia 2010Reference size of the CAPEX scale law (pellet output of the cited plant).
Market range No independent range cited.
8.93t/hPirraglia 2010Second published plant size of the same study. The model does not use it to fit the law; it reports the exponent the two Pirraglia cases imply (0.89) next to the 0.7 the authors apply.
Market range No independent range cited.
19259000USDPirraglia 2010 Table 4Annual output of the second Pirraglia case.
Market range No independent range cited.
125000t/yearPirraglia 2010 Table 4Capacity exponent of the total installed cost: CAPEX = CAPEX_ref x (size / 8.93 t/h)^0.7. Sultana 2010 says a power law holds up to about 10 times the reference size; 1-40 t/h is 0.11-4.5 times 8.93 t/h. Sultana reports 0.6 for wood pellet equipment (Mani 2006; Hoque 2006), shown as a sensitivity; the two Pirraglia cases imply 0.89.
Market range 0.6 (Mani 2006, Hoque 2006, via Sultana 2010) to 0.7 (Pirraglia 2010, after Andersson 2006).
0.7Pirraglia 2010 p. 2380Alternative exponent used only for the sensitivity outputs (CAPEX and pellet cost at 0.6).
Market range No independent range cited.
0.6Sultana 2010Used only to split the CAPEX into direct, indirect and contingency lines. The split assumes both percentages apply to the direct installed cost; the total is unchanged by this assumption.
Market range No independent range cited.
0.24ratioPirraglia 2010 Table 2Used only to split the CAPEX (see indirect_cost_frac_in_ref). Because contingency is already inside the figure, the CAPEX is exported with battery_limit = fully_financed and the project adds nothing.
Market range No independent range cited.
0.1ratioPirraglia 2010 Table 2Plant cost index of the CAPEX reference year.
Market range No independent range cited.
521.9CEPCI 2009Plant cost index used to escalate the 2009 USD CAPEX to 2023 USD (x1.529) before conversion to EUR.
Market range No independent range cited.
797.9CEPCI 2023Used only to state Pirraglia's 2009 production cost in 2009 EUR (same money year, no escalation).
Market range No independent range cited.
1.3948USD/EURECB 2009Converts the escalated 2023 USD CAPEX and the consumables cost to EUR.
Market range No independent range cited.
1.0813USD/EURECB 2023Numerical floor of the clamp on the scaled specific CAPEX; it never binds inside the slider range (checked at 1 and 40 t/h).
Market range Not applicable.
500000EUR/(t/h)GuardNumerical ceiling of the clamp; it never binds inside the slider range.
Market range Not applicable.
10000000EUR/(t/h)GuardAnnual maintenance as a share of the CAPEX. 2.5 % is the general-equipment rate; the hammer mill (18 %) and pellet mill (10 %) are maintained at much higher rates on their own cost, so 2.5 % on the whole plant is a floor.
Market range 2.5 % general equipment; 10 % pellet mill; 18 % hammer mill (Thek and Obernberger 2004, via Sultana 2010).
0.025ratioSultana 2010 p. 5613Workers present every operating hour for a bulk plant: 1 supervisor, 2 machine operators, 1 forklift operator. The 2 packaging workers are excluded because the plant ships in bulk. Held flat with size: Sultana 2010 section 5.3.3 says nearly the same number of workers is required, and Pirraglia keeps labour unchanged from 75 to 125 kt/yr.
Market range No independent range cited.
4personsSultana 2010 Table 5One maintenance worker on a full-time year.
Market range No independent range cited.
1personsSultana 2010 Table 5Paid hours of the maintenance worker.
Market range No independent range cited.
2080h/yearSultana 2010 Table 5Management and office staff, held flat with size.
Market range No independent range cited.
4personsSultana 2010 Table 5Paid hours per salaried person.
Market range No independent range cited.
2080h/yearSultana 2010 Table 5Employer cost per paid hour, EU average 2024, applied to all labour hours. Country costs range from 11 to 55 EUR/h, which moves the labour line by a factor of five.
Market range EUR 11-55 per hour across EU countries (2024).
33.5EUR/hEurostat 2024Dies, rollers, hammers and screens per tonne of pellets. Converted at the 2023 ECB rate without escalation from 2007; at about 2.5 EUR/t it is under 1 % of the cost.
Market range No independent range cited.
2.75USD/tSultana 2010 p. 5617Retail price of pellets in Bavaria, July 2026 (delivered, incl. VAT, distribution and margin). A market ceiling for the production cost, not a production cost.
Market range No independent range cited.
402EUR/tTFZ Juli 2026Retail pellet price per MWh, July 2026. A market ceiling for the production cost per MWh.
Market range No independent range cited.
85EUR/MWhTFZ Juli 2026US total production cost in 2009 USD with US feedstock and labour prices. Reported in 2009 EUR (at the 2009 ECB rate) as a qualitative reference: money year, feedstock and labour differ from the model.
Market range No independent range cited.
203.7USD/tPirraglia 2010 Table 4Default feed moisture, wet basis: the moisture of the TFZ wood-chip price basis. The slider runs 10-60 %: dry shavings to fresh sawdust or chips (EUBIA's example starts at 55 %).
Market range35%TFZ Juli 2026Default pellet moisture, wet basis; ENplus A1 requires <= 10 %.
Market range8%Sultana 2010 p. 5610Default feedstock price per wet tonne at 35 % moisture. The input is per wet tonne at the feed moisture you enter: a wetter feed should come with a lower price per wet tonne (the model also shows the price per tonne of dry matter).
Market range No independent range cited.
108EUR/tTFZ Juli 2026Default drying heat price in the biomass-furnace case: wood-chip fuel per MWh LHV, divided by the 80 % furnace efficiency in the model. In the waste-heat case the same input is the price of heat delivered to the dryer.
Market range No independent range cited.
34EUR/MWhTFZ Juli 2026Default electricity price (0.18 EUR/kWh = 180 EUR/MWh).
Market range No independent range cited.
180EUR/MWhEurostat S1 2026Default operating hours at nominal output.
Market range 7,200 h (Sultana 2010) to 8,400 h (Pirraglia 2010).
8000h/yearEUBIADefault economic life of the annuity, equal to the plant life used by Sultana. Exported to project mode as the asset life.
Market range No independent range cited.
30yearsSultana 2010 Table 4Default real discount rate. All costs are held in constant 2023-2026 EUR without escalation, so the rate is read as real.
Market range No independent range cited.
0.1ratioSultana 2010 Table 4North American sawdust plant cost: shows the direction of the scale effect (about -22 % from 6 to above 10 t/h), not the EU level, because feedstock and labour were far cheaper. Not used in the model.
Market range No independent range cited.
51USD/tMani 2006See mani_cost_usd_per_t_6tph. Not used in the model.
Market range No independent range cited.
40USD/tMani 2006Dry-matter balance: feed (wet t/h) = pellets x (1 - pellet moisture) / (1 - 5 % loss) / (1 - feed moisture). Water evaporated = feed water - pellet water, floored at zero. Drying heat = water evaporated x 950 kWh/t. Moisture is on a wet basis, in percent.
Market range Not applicable.
—MethodProduction cost per t = [CAPEX x CRF + maintenance + labour] / t per year + feed t per t x feed price + drying heat bought per t x heat price + electricity per t x electricity price + consumables. CRF = r(1+r)^n / ((1+r)^n - 1), and 1/n at r = 0. Cost per MWh = cost per t / (16.5 MJ/kg / 3.6).
Market range Not applicable.
—MethodThe CAPEX is the total installed cost with indirects and contingency: an all-in figure. It is exported to project mode with battery_limit = fully_financed, so the project adds no buildup. A pellet press or container plant price from a supplier (e.g. a catalogue press alone) is not installed: add dryer, grinding, building, installation, indirects and contingency before entering it as the Customized value.
Market range Not applicable.
—CAPEX boundaryCAPEX in 2023 EUR (CEPCI-escalated, ECB 2023 rate); prices of feedstock, heat and electricity are 2026 market prices; labour is 2024. No line is escalated over the life, so the annuity is taken at a real rate. The money years differ by up to three years; the gap is not corrected.
Market range Not applicable.
—Money basisSingle-input sweeps from the nominal case stay within about 166-441 EUR/t (36-96 EUR/MWh). The 8,192 corners of the box (both heat cases and both CAPEX sources included) span about 58-1,055 EUR/t: 1 t/h with 60 % moisture, 150 EUR/t feed, 4,000 h and expensive power and capital is the top; 40 t/h with dry feed at 40 EUR/t, free waste heat, cheap power and a zero rate is the bottom. Drying heat spans 5-1,353 kWh/t over the corners. Sultana 2010 limits the power law to about 10 times the reference size; 1 t/h is 0.11 times 8.93 t/h, a small container plant (such as a 6 t/h containerized unit) sits inside the range. Bagging is excluded.
Market range Not applicable.
—Validity domainInlets: wet wood (sawdust or chips) in t/year, electricity, and drying heat delivered to the dryer (MWh/year, which a biomass boiler can supply). Outlet: wood pellets in t/year. The cost per MWh LHV can feed the fuel price of a pellet boiler. Bagging, transport to the customer and the feedstock supply chain are outside the model.
Market range Not applicable.
—Scope