Refrigerated ammonia storage with boil-off reliquefaction

Liquid ammonia tank farm at -33 C for a plant or export terminal, 10 to 3,000 t/d and 1 to 45 days: working capacity, number of 50 kt tanks, boil-off, reliquefaction electricity, installed CAPEX and storage cost per tonne shipped, from IEA terminal tank costs and IRENA boil-off rates.

  • CurrencyEUR 2019
  • Battery limitinstalled
  • 64 documented assumptions
  • Updated2 Nov 2026

Mass and energy balance

What the asset draws and delivers for the case and load you choose.

Reference case

Yearly average ammonia shipped through the tanks, as a percent of nameplate output. 100 % = every tonne the plant can make passes through storage (IEA basis). The tanks stay sized on nameplate, so their fixed cost per tonne rises as this falls: this is the lever project mode sets from the plant's real output.

Flows

  • In: Liquid ammonia from the plant—
  • In: Electricity for boil-off reliquefaction—

Asset

Refrigerated ammonia storage tank farm (-33 C, full containment, boil-off reliquefaction)

  • Out: Liquid ammonia shipped—

Annual quantities at the current usage.

Nameplate ammonia output of the plant that fills the tanks, in tonnes per day. Same key and unit as the ammonia flow of the green ammonia calculators, so project mode can chain it. It sizes the storage together with the storage days.

Working capacity
— t
Number of tanks
— -
Content of each tank
— t
Reliquefaction power
— kW

CAPEX

Specific cost at this size, what backs it, and how it behaves with scale.

Specific CAPEX at this size

—

Reference size 34,100 t/d

Derived from IEA 2019 annex, p.7

Model value scales the reference tank cost of the selected case. Customized uses your own cost per tonne stored, at every size: the value is then no longer sourced.

Tank CAPEX per tonne stored by ammonia output

Log in to view this sensitivity chart.

  1. Ex-factory
  2. Installed· this figure
  3. Fully financed
CAPEX at the battery limit—
Working capital, contingencyproject level

Included

  • Equipment
  • Installation, civil works and engineering

Not included

  • Working capital
  • Contingency

Added at project level

  • Working capital layer, from the project settings
  • Contingency, from the project settings

Project figures

Values passed to project mode when this asset is added to a project.

Concept sketch, not to scale · drag to rotate

Liquid ammonia from the plant in
—
Electricity for boil-off reliquefaction in
—
Liquid ammonia shipped outMain product
—
CAPEX to the battery limit
—
Fixed O&M
—
Variable O&M, excluding feedstocks
0 EUR/year
Asset lifetime
30 years

Log in to add this asset to a project.

Storage cost per tonne of ammonia

A standalone indicator for a quick read. Project mode recomputes it for the whole system.

—

  • Capital part—
  • Fixed O&M part—
  • Reliquefaction electricity part—

Linked to the balance above

Yearly average ammonia shipped through the tanks, as a percent of nameplate output. 100 % = every tonne the plant can make passes through storage (IEA basis). The tanks stay sized on nameplate, so their fixed cost per tonne rises as this falls: this is the lever project mode sets from the plant's real output.

Days of nameplate output the tanks hold. A few days buffers a plant; two to six weeks covers an export terminal between ships. Stored quantity = output x days; below 5,000 t the refrigerated CAPEX law is extrapolated.

Cycle that recondenses the boil-off gas, with its specific electricity from Ji et al. 2025 (ammonia carrier design applied to a land tank at the same -33 C).

Price of the electricity for the reliquefaction loop. Your assumption: no grounded default exists, 50 EUR/MWh is a placeholder. At nominal it weighs under 1 % of the storage cost.

Real discount rate of the annuity on the tank CAPEX. Default 0.08, the IEA 2019 rate.

Storage cost per tonne of ammonia by throughput load factor

Log in to view this sensitivity chart.

Benchmarks

This model's figures against published references and reference cases.

Tank CAPEX per tonne stored, 2019 USD, USD/t

600 IRENA 2022 Part II, Fig. 2.9

1,000 IRENA 2022 Part II, Fig. 2.9

Storage cost in 2019 USD, USD/t

5 IRENA & AEA 2022

30 IRENA & AEA 2022

Reference cases at this size and usage

Log in to compare the reference cases.

All results

Every model output at the current settings, grouped, with the sensitivity charts.

56 outputs · 6 groups · 15 also shown above, dimmed

Storage cost

9
Storage cost per tonne of ammonia
ComputingEUR/t
Capital part
ComputingEUR/t
Fixed O&M part
ComputingEUR/t
Reliquefaction electricity part
ComputingEUR/t
Capital share of the storage cost
Computing%
Electricity share of the storage cost
Computing%
Fixed-cost load penalty
Computing-
Equivalent full-flow hours
Computingh/year
Ammonia shipped through storage a year
Computingt/year

Double count with #482

3
Storage cost in 2019 USD
ComputingUSD/t
Share of the top of #482's rest-of-plant lump
Computing%
Ratio to the bottom of #482's rest-of-plant lump
Computing-

Size and regime

13
Working capacity
Computingt
Number of tanks
Computing-
Content of each tank
Computingt
Tank size against IRENA's largest storage
Computing%
Tank turnovers a year
Computing1/year
Refrigerated regime
Computing-
Transition zone
Computing-
Pressurised regime
Computing-
CAPEX extrapolated (not sourced)
Computing-
Pressure of the pressurised option, low
Computingbar
Pressure of the pressurised option, high
Computingbar
Steel mass, refrigerated storage
Computingt
Steel mass if stored pressurised
Computingt

Boil-off and reliquefaction

13
Boil-off rate
Computing%/day
Boil-off
Computingt/d
Boil-off gas flow
Computingkg/h
Boil-off a year
Computingt/year
Boil-off against output
Computing%
Reliquefaction specific energy
ComputingkWh/kg
Reliquefaction power
ComputingkW
Reliquefaction electricity a year
ComputingMWh/yr
Electricity per tonne shipped
ComputingkWh/t
Electricity per kg of hydrogen carried
ComputingkWh/kg
Heat leaking into the tanks
ComputingkW
Implied coefficient of performance
Computing-
Heat rejected a year
ComputingMWh/yr

CAPEX

11
Total tank CAPEX
ComputingEUR
Tank CAPEX per tonne stored
ComputingEUR/t
CAPEX per tank
ComputingEUR
CAPEX per t/d of output
ComputingEUR/(t/d)
Tank CAPEX per tonne stored, 2019 USD
ComputingUSD/t
Reference tank content
Computingt
Reference tank CAPEX
ComputingMUSD
Reference CAPEX per tonne stored, USD
ComputingUSD/t
Reference CAPEX per tonne stored, EUR
ComputingEUR/t
Scaling exponent applied
Computing-
Exponent from the two IEA 2019 tanks
Computing-

Yearly costs

7
Yearly storage cost
ComputingEUR/year
Annualised CAPEX
ComputingEUR/year
Fixed O&M
ComputingEUR/year
Reliquefaction electricity cost
ComputingEUR/year
O&M rate of the case
Computing%/year
Capital recovery factor
Computing1/year
Capital recovery factor, IEA basis
Computing1/year

Sensitivities

4 charts
Storage cost components vs throughput load factor

Log in to view this sensitivity chart.

Storage cost vs storage autonomy (refrigerated domain)

Log in to view this sensitivity chart.

Tank CAPEX and CAPEX per tonne stored vs ammonia output

Log in to view this sensitivity chart.

Reliquefaction electricity vs storage autonomy

Log in to view this sensitivity chart.

About

Calculator context

Tank farm that holds liquid ammonia between an ammonia plant and its offtake or export berth. The calculator covers the standard large-scale design: atmospheric tanks at -33 C with full containment (API 625 / EN 14620), whose boil-off gas is recondensed by an electric refrigeration loop and returned to the tank, so no product is lost.

Regime. IRENA & AEA (2022, p.29) put ammonia in refrigerated atmospheric tanks above 5 kt stored and in pressurised spheres or bullets at 16-18 bar below 1.5 kt. Refrigerated tanks use about 1 t of steel per 45 t of ammonia, against 1 t per 2.8 t when pressurised (IRENA 2022 Part II, citing Valera-Medina 2020), which is why refrigeration wins at scale. Only the refrigerated case is priced: no source found prints a CAPEX for pressurised storage. Below 5 kt the calculator still returns a number, extrapolated from the refrigerated law, and raises the flag 'CAPEX extrapolated'. That number is not defended.

Sizing. Working capacity = ammonia output (t/d) x storage days, split into the fewest tanks of at most 50 kt each (IRENA & AEA 2022). Boil-off = capacity x daily boil-off rate: 0.04 %/day for large tanks (IRENA Part II) in the IEA 2019 case, 0.01 %/day for terminal tanks (IEA GHR 2024) in the IEA 2024 case. The tank is assumed full all year, a conservative reading. Reliquefaction takes 0.1898 kWh per kg of boil-off gas with a vapour-compression cycle, or 0.1728 with Linde-Hampson (Ji et al. 2025). That figure comes from an 88,000 m3 carrier design applied to a land tank at the same -33 C, so it is medium evidence. With the latent heat of ammonia (1,370 kJ/kg, NIST) it implies a coefficient of performance of about 2, plausible for a loop lifting heat from -33 C to ambient.

Cost. Each tank costs the IEA reference tank (68 MUSD for 34,100 t, IEA 2019; or 115 MUSD for 36,700 t, IEA 2024) scaled as (content / reference content)^0.7. The exponent is derived from IEA 2019's two tank points (ln(97/68) / ln(56,700/34,100) = 0.699); IEA does not print it. USD are converted at the 2019 ECB rate (1.1195 USD/EUR), so the calculator is in constant 2019 euros at a real discount rate, IEA's 8 % over 30 years by default. The IEA 2024 figures are not deflated to 2019, so part of their 57 % premium is price inflation between the two reports. Storage cost per tonne = (CAPEX x CRF + fixed O&M at 4 % or 3 % of CAPEX + reliquefaction electricity at your price) / tonnes shipped through storage a year. The throughput load factor sets that tonnage: the tanks stay sized on nameplate output, so their fixed cost per tonne rises as the flow falls. The electricity price is your assumption and weighs under 1 % of the cost.

Sources disagree on tank cost by a factor of 2 to 5. IEA 2019 gives about 1,700-2,000 USD per tonne stored at 34-57 kt. IEA 2024 gives about 3,130 USD/t. IRENA Part II reproduces a Morgan (2013) curve at about 600-1,000 USD/t, read off a chart with no printed table and in older money. IEA 2019 is the default because it sits mid-range; the reference-case selector switches to IEA 2024, and the Customized option takes your own EPC quote. A separate check: IEA's throughput-based terminal electricity figures (0.005-0.02 kWh/kg H2 in 2019, 0.001-0.003 in 2024) bracket the reliquefaction electricity per kg of hydrogen carried that the calculator returns at the IEA 2019 basis.

Double count with #482. The small modular green ammonia calculator (#482) includes a rest-of-plant lump of 5-30 USD/t of ammonia (IRENA & AEA 2022) that covers nitrogen purification, water desalination and ammonia storage. If this calculator is chained to #482, remove the storage share of that lump, or set #482's rest of plant to its low end, so storage is not counted twice.

There is no catalogue product: refrigerated ammonia tanks are built by EPC contractors to the site, and no maker prints a capacity.

Model

125 variables — inputs, calculations and outputs, with their dependencies.

125 variables shown of 125
VariableValueUnitDepends on
1000t/d—
14d—
100%—
1——
1——
50EUR/MWh—
0.08ratio—
0——
2300EUR/t—
VariableFormulaUnitDepends on
if((<)+(>)+(<)+(>)+(<)+(>)+(<)+(>)+(<)+(>)+(<)+(<)+(>)+(<)+(>)+(<=)>0,1,0)bool
VariableFormulaUnitDepends on
*t
max(ceil(/),)-
/max(,)t
/*%
if(>=,,)-
if(<,,)-
---
--
*bar
*bar
/t
/t
if(==,,)%/day
**t/d
*/kg/h
*t/year
/max(,)*%
if(==,,)kWh/kg
*kW
**MWh/yr
*/kW
/max(,)-
(+)**MWh/yr
**h/year
/*t/year
/max(*,)-
/max(,)1/year
*/max(,)kWh/t
//kWh/kg
if(==,,)t
if(==,,)MUSD
*/USD/t
*EUR/t
ln(/)/ln(/)-
if(>=,,)-
if(>=,,clamp(*(/)^(-),,))EUR/t
*EUR
/max(,)EUR
*USD/t
/max(,)EUR/(t/d)
if(<,/,(*(+)^)/max((+)^-,))1/year
(**(+*)^)/max((+*)^-,)1/year
*EUR/year
if(==,,)%/year
**EUR/year
*EUR/year
++EUR/year
/max(,)EUR/t
/max(,)EUR/t
/max(,)EUR/t
++EUR/t
*USD/t
/*%
/-
/max(,)*%
/max(,)*%

Assumptions

64 assumptions used in the calculations

  • Protects divisions against a zero denominator.

    0.000001
    Numerical constant
  • Lower limit in the input guard and gauge pressure of an atmospheric tank.

    0
    Numerical constant
  • Unit value used in the CRF, the tank count and the Customized switch.

    1
    Numerical constant
  • Converts a percent into a fraction.

    0.01
    Numerical constant
  • Converts a fraction into a percent.

    100
    Numerical constant
  • Kilograms per tonne.

    1000kg/t
    Numerical constant
  • Hours per day, to turn a daily boil-off into an hourly rate.

    24h/d
    Numerical constant
  • Days per year: boil-off and throughput are daily rates.

    365d/year
    Numerical constant
  • Hours per year.

    8760h/year
    Numerical constant
  • MWh per kWh.

    0.001MWh/kWh
    Numerical constant
  • kWh per MWh.

    1000kWh/MWh
    Numerical constant
  • USD per million USD.

    1000000USD/MUSD
    Numerical constant
  • kJ per kWh, to turn kJ/h into kW.

    3600kJ/kWh
    Numerical constant
  • Reference case 1: IEA 2019 terminal tank cost (34,100 t for 68 MUSD), 4 % O&M, IRENA large-tank boil-off of 0.04 %/day.

    1
    Selector code
  • Reference case 2: IEA Global Hydrogen Review 2024 terminal tank cost (36,700 t for 115 MUSD), 3 % O&M, terminal-tank boil-off of 0.01 %/day.

    2
    Selector code
  • Lowest valid reference-case code, used by the input guard.

    1
    Selector code
  • Highest valid reference-case code, used by the input guard.

    2
    Selector code
  • Reliquefaction cycle 1: single-stage vapour-compression cycle on the boil-off gas (Ji et al. 2025).

    1
    Selector code
  • Reliquefaction cycle 2: Linde-Hampson open cycle on the boil-off gas (Ji et al. 2025).

    2
    Selector code
  • Smallest ammonia output accepted: a small modular green ammonia plant. Below 5 kt stored the CAPEX is extrapolated and flagged.

    10t/d
    Input guard
  • Largest ammonia output accepted: a world-scale ammonia train.

    3000t/d
    Input guard
  • Shortest storage autonomy accepted, one day of output.

    1d
    Input guard
  • Longest storage autonomy accepted, covering an export terminal waiting on ship arrivals.

    45d
    Input guard
  • Lowest throughput load factor accepted. Below half load the tank is oversized for the flow and the fixed cost per tonne stops being representative.

    50%
    Input guard
  • A plant cannot ship more than its nameplate output.

    100%
    Input guard
  • Highest real discount rate accepted.

    0.15ratio
    Input guard
  • Numerical floor of the scaled specific CAPEX. With 50,000 t tanks at most, the law never goes below about 1,580 EUR/t, so the floor never binds inside the declared domain.

    100EUR/t
    Input guard
  • Numerical ceiling of the scaled specific CAPEX. The smallest tank of the domain (10 t) gives about 20,500 EUR/t in case 1 and 36,000 EUR/t in case 2, so the ceiling never binds inside the declared domain.

    100000EUR/t
    Input guard
  • Ceiling on the content of one tank. The working capacity is split into the smallest whole number of tanks that keeps each one at or below it.

    Market range IRENA Part II quotes storage sizes up to 60 kt (see irena_partII_max_storage_size_t).

    50000t
    IRENA & AEA 2022, p.29
  • Upper end of the ammonia storage sizes covered by IRENA Part II. Used only to show how large each tank is against it; the split into tanks uses the stricter 50 kt.

    60000t
    IRENA 2022 Part II, p.41
  • At or above this stored quantity the refrigerated atmospheric tank is the standard choice, and it is the only regime this calculator prices from a source.

    5000t
    IRENA & AEA 2022, p.29
  • Below this stored quantity, pressurised spheres or bullets are the norm. Between 1.5 and 5 kt both regimes are used (transition zone).

    1500t
    IRENA & AEA 2022, p.29
  • Lower end of the storage pressure of a pressurised ammonia vessel at ambient temperature, shown when the stored quantity is below the refrigerated threshold.

    16bar
    IRENA & AEA 2022, p.29
  • Upper end of the same pressure range.

    18bar
    IRENA & AEA 2022, p.29
  • Indicative steel mass of refrigerated storage, the reason refrigerated tanks win at scale. Not used in the cost.

    45t/t
    IRENA 2022 Part II, p.39-40
  • Indicative steel mass if the same quantity were stored pressurised: 16 times more steel per tonne, which is why pressurised storage stays small. Not used in the cost.

    2.8t/t
    IRENA 2022 Part II, p.39-40
  • Daily evaporation of the stored liquid, as a share of the working capacity, in case 1. The model keeps the tank full all year, a conservative reading.

    0.04%/day
    IRENA 2022 Part II, p.41
  • Daily evaporation of the stored liquid in case 2 (IEA 2024 terminal tank).

    0.01%/day
    IEA GHR 2024 annex, p.9
  • Electricity per kg of boil-off gas reliquefied with cycle 1.

    0.1898kWh/kg
    Ji et al. 2025
  • Electricity per kg of boil-off gas reliquefied with cycle 2.

    0.1728kWh/kg
    Ji et al. 2025
  • Heat that evaporates one kg of liquid ammonia at -33 C. The boil-off rate times this value is the heat leaking into the tank, which the reliquefaction loop pumps back out.

    Market range About 1,370 kJ/kg at 1 atm; physical property.

    1370kJ/kg
    NIST Chemistry WebBook
  • Size of the tank whose cost anchors case 1. The law scales the cost of each tank from this size.

    34100t
    IEA 2019 annex, p.7
  • CAPEX of the case 1 reference tank, in 2019 USD. IEA does not itemise it; the calculator reads it as the installed cost of a tank, owner's contingency excluded.

    Market range About 1,700-2,000 USD/t stored at 34-57 kt (IEA 2019); 3,130 USD/t at 36.7 kt (IEA 2024); 600-1,000 USD/t (Morgan 2013 via IRENA).

    68MUSD
    IEA 2019 annex, p.7
  • Second IEA tank point, used only to derive the scaling exponent (shown as a check output).

    56700t
    IEA 2019 annex, p.7
  • CAPEX of the second IEA tank point, used only to derive the scaling exponent.

    97MUSD
    IEA 2019 annex, p.7
  • Exponent of the per-tank power law: the cost of one tank grows as its content to the power 0.7, so the cost per tonne stored falls as content to the power -0.3. Applied to the case 2 anchor as well, which IEA 2024 does not contradict but does not confirm.

    0.7
    Derived from IEA 2019 annex, p.7
  • Size of the tank whose cost anchors case 2.

    36700t
    IEA GHR 2024 annex, p.9
  • CAPEX of the case 2 reference tank, as printed in USD. It is converted at the same 2019 exchange rate as case 1 and is not deflated to 2019, so part of its 57 % premium over IEA 2019 is price inflation between the two reports.

    115MUSD
    IEA GHR 2024 annex, p.9
  • Low end of the Morgan cost curve reproduced by IRENA, shown as a benchmark next to the model's specific CAPEX in USD. Different currency year (2013 study) and scope: the comparison is qualitative.

    600USD/t
    IRENA 2022 Part II, Fig. 2.9
  • High end of the same curve, benchmark only.

    1000USD/t
    IRENA 2022 Part II, Fig. 2.9
  • Fixed O&M of the tank farm in case 1, as a share of CAPEX a year. Excludes the reliquefaction electricity, which is priced separately.

    4%/year
    IEA 2019 annex, p.7-8
  • Fixed O&M in case 2.

    3%/year
    IEA GHR 2024 annex, p.9
  • IEA's discount rate, the default of the discount-rate input and the basis of the reference CRF output, which shows the IEA annuity factor whatever rate you set.

    8%
    IEA 2019 annex, p.8
  • Service life of the tank farm, used for the annuity and exported to project mode as the replacement interval. Refrigerated steel tanks are built for this order of life.

    30years
    IEA 2019 annex, p.8
  • Converts the euro storage cost back into 2019 USD, to set it next to IRENA's rest-of-plant lump and the Morgan curve.

    1.1195USD/EUR
    ECB, EXR 2019
  • Converts the IEA tank CAPEX from USD into EUR. Both cases use the 2019 rate, so the calculator is in 2019 euros.

    0.8933EUR/USD
    ECB, EXR 2019
  • Low end of the lump in which the small modular green ammonia calculator (#482) buries storage. Benchmark for the storage cost in USD, and the reason for the double-count rule.

    5USD/t
    IRENA & AEA 2022
  • High end of the same lump. The output 'share of #482 rest-of-plant' divides the storage cost by it.

    30USD/t
    IRENA & AEA 2022
  • Turns the reliquefaction electricity per tonne of ammonia into kWh per kg of hydrogen carried, the unit of the IEA terminal electricity figures.

    0.1776kg/kg
    Stoichiometry
  • Working capacity = ammonia output x storage days, split into the fewest tanks of at most 50 kt. Boil-off = capacity x daily boil-off rate, reliquefied by an electric loop. Tank CAPEX = number of tanks x reference tank CAPEX x (tank content / reference content)^0.7. Storage cost = (CAPEX x CRF + fixed O&M + reliquefaction electricity) / tonnes of ammonia shipped through storage a year.

    —
    Model scope
  • Only the refrigerated atmospheric tank (-33 C, full containment, API 625 / EN 14620) is priced. Below 5 kt stored the sources favour pressurised spheres or bullets at 16-18 bar, for which no source found prints a CAPEX: the calculator still returns a number, extrapolated from the refrigerated law, and raises the flag 'CAPEX extrapolated'. That number is not defended.

    —
    Model scope
  • Boil-off is computed on the full working capacity every day of the year, whatever the throughput. Real inventory cycles between full and the heel, so this overstates the boil-off and the electricity a little; both weigh under 2 % of the cost.

    —
    Model scope
  • The small modular green ammonia calculator (#482) includes a rest-of-plant lump of 5-30 USD/t that already covers ammonia storage. When this calculator is chained to it, remove the storage share of that lump, or set #482's rest of plant to its low end, so storage is not counted twice.

    —
    Chaining rule
  • Constant 2019 euros: both IEA tank costs are converted at the 2019 ECB rate and not escalated. The discount rate is applied as a real rate, as IEA does, and no cost line is escalated, so real and constant money match. Case 2's USD are not deflated to 2019, which leaves case 2 high by the price inflation between the two reports.

    —
    Model scope