Industrial wood-chip biomass boiler (hot water or steam) - levelised cost of heat
Grate-fired wood-chip boiler for hot water or low-pressure steam: wood tonnage from the moisture content, ash, auxiliaries, installed CAPEX on a DEA scale law checked against ADEME, and the levelised cost of heat in EUR/MWh.
- CurrencyEUR 2020
- Battery limitinstalled
- 59 documented assumptions
- Updated2 Nov 2026
Mass and energy balance
What the asset draws and delivers for the case and load you choose.
Reference case
Equivalent hours per year at nominal output. ADEME's typical industrial duty is 3,000 h below 1 MW, 4,000 h at 1-3 MW and 5,000 h above 3 MW; 7,000 h is near-baseload process steam.
Flows
- In: Wood chips (as received)—
- In: Auxiliary electricity—
Asset
Industrial wood-chip biomass boiler
- Out: Heat (hot water or low-pressure steam)—
Annual quantities at the current usage. Band width: share of energy in; non-energy flows are not to scale.
Heat delivered by the boiler at full load, as printed on the nameplate. 300-20,000 kW covers industrial grate boilers; it includes the catalogue products HARGASSNER Magno-SR 700 (700 kW) and HERZ BioFire Taurus 2000 (2,000 kW, the default). Costs are anchored on the DEA small wood-chip plant (6,840 kW); below it the CAPEX is an extrapolation of the DEA scale law, counter-checked against ADEME's size bands.
- Fuel input at nominal output
- — kW
- Wood feed at nominal output
- — t/h
- Auxiliary electric load at nominal output
- — kW
- Heat delivered
- — MWh
CAPEX
Specific cost at this size, what backs it, and how it behaves with scale.
Specific CAPEX at this size
—
Reference size 6,840 kW
Scale law exponent
Model value: the DEA installed cost scaled to the size. Customized: your own installed figure, used as is at every size and no longer sourced.
Log in to view this sensitivity chart.
- Ex-factory
- Installed· this figure
- Fully financed
Included
- Equipment
- Installation, civil works and engineering
Not included
- Working capital
- Contingency
Added at project level
- Working capital layer, from the project settings
- Contingency, from the project settings
Project figures
Values passed to project mode when this asset is added to a project.
Industrial wood-chip biomass boilerConcept sketch, not to scale · drag to rotate
- Wood chips (as received) in
- —
- Auxiliary electricity in
- —
- Heat (hot water or low-pressure steam) outMain product
- —
- CAPEX to the battery limit
- —
- Fixed O&M
- —
- Variable O&M, excluding feedstocks
- —
- Asset lifetime
- 25 years
Log in to add this asset to a project.
Levelised cost of heat
A standalone indicator for a quick read. Project mode recomputes it for the whole system.
—
- LCOH - capital—
- LCOH - fixed O&M—
- LCOH - variable O&M and ash—
- LCOH - auxiliary electricity—
- LCOH - wood fuel—
Linked to the balance above
Equivalent hours per year at nominal output. ADEME's typical industrial duty is 3,000 h below 1 MW, 4,000 h at 1-3 MW and 5,000 h above 3 MW; 7,000 h is near-baseload process steam.
Water as a share of the delivered (wet) mass. It sets the LHV as received and so the tonnes to buy and handle. Danish plants burned 25-55 % (DEA, 2014-15); 35 % is the C.A.R.M.E.N. price reference; DEA reports combustion up to 60 %.
Ash per dry mass of wood. 2 % is typical of coniferous forest residues and 1.5 % of broad-leaf residues (FAO / CEN/TS 14961); DEA's commercial chip specification caps it at 2 %.
Delivered price per MWh of LHV. Default 32.40 EUR/MWh is the C.A.R.M.E.N. 2025 average for 35 % chips (100.45 EUR/t, gross of 7 % VAT). If your supplier quotes per tonne, divide by the LHV as received shown in the results (MWh/t).
Leave at 0: DEA's variable O&M already includes disposal of residues. Enter a price only if your site pays ash disposal on top of O&M (no sourced price was found).
Delivered price excluding VAT for fans, conveyors and pumps. Default 121.7 EUR/MWh is Eurostat's EU27 band IF, 2025-S2; the range runs from France band IG (61.4) to EU band IC (183.7).
Real rate for the capital annuity, as a fraction. ADEME reports industrial biomass heat at 5, 8 and 10 %; costs are held constant over the life, so the rate is real.
Annuity period. Default 20 years is ADEME's; DEA gives a technical lifetime of 25 years (20-35).
Log in to view this sensitivity chart.
Benchmarks
This model's figures against published references and reference cases.
Specific installed CAPEX, EUR/kW
610 ADEME 2016 p. 32
940 ADEME 2016 p. 32
1,100 ADEME 2016 p. 32
Wood LHV as received, GJ/t
8.1 DEA Table 3 p. 73
10.3 DEA Table 3 p. 73
Levelised cost of heat, EUR/MWh
46 ADEME 2016 p. 31
79 ADEME 2018 p. 2
Reference cases at this size and usage
Log in to compare the reference cases.
All results
Every model output at the current settings, grouped, with the sensitivity charts.
62 outputs · 4 groups · 17 also shown above, dimmed
Levelised cost of heat
12- Wood share of the LCOH
- Computing%
- LCOH at ADEME typical hours for this size
- ComputingEUR/MWh
- LCOH with the ADEME size-band CAPEX
- ComputingEUR/MWh
- LCOH over the DEA 25-year lifetime
- ComputingEUR/MWh
- LCOH at a 5 % discount rate
- ComputingEUR/MWh
- LCOH at a 10 % discount rate
- ComputingEUR/MWh
Wood fuel and ash
14- Ash to dispose of
- Computingt
- Wood LHV as received (MWh/t)
- ComputingMWh/t
- Wood price per tonne as received
- ComputingEUR/t
- Model LHV at 35 % moisture
- ComputingMWh/t
- Energy content implied by C.A.R.M.E.N. prices
- ComputingMWh/t
- Moisture outside the DEA measured range
- Computingbool
- Wood per MWh of heat
- Computingt/MWh
- Dry wood burned
- Computingt
- Water carried in with the fuel
- Computingt
- Heat spent evaporating fuel water
- ComputingMWh
- Ash above the 2 % commercial limit
- Computingbool
Capital and O&M
21- Installed CAPEX (MEUR)
- ComputingMEUR
- Specific-cost exponent from the DEA sheets
- Computingratio
- ADEME CAPEX for this size band
- ComputingEUR/kW
- Gap to the ADEME size band
- Computing%
- Equipment part of the CAPEX
- ComputingEUR
- Installation part of the CAPEX
- ComputingEUR
- Equipment share of the CAPEX
- Computing%
- Capital recovery factor
- Computing1/year
- CRF over 25 years
- Computing1/year
- CRF at 5 %
- Computing1/year
- CRF at 10 %
- Computing1/year
- Annualised CAPEX
- ComputingEUR/year
- Variable O&M (residue disposal included)
- ComputingEUR/year
- Separate ash disposal charge
- ComputingEUR/year
- Auxiliary electricity cost
- ComputingEUR/year
- Wood fuel cost
- ComputingEUR/year
- Total annual cost
- ComputingEUR/year
Heat and energy balance
15- Nominal heat output (MW)
- ComputingMW
- Full-load hours used
- Computingh/year
- Capacity factor
- Computing%
- ADEME typical hours for this size
- Computingh/year
- Boiler efficiency (LHV, annual)
- Computing%
- Fuel energy per MWh of heat
- ComputingMWh/MWh
- Auxiliary uplift on purchased energy
- Computingratio
- Purchased energy per MWh of heat
- ComputingMWh/MWh
- Fuel energy input (LHV)
- ComputingMWh
- Auxiliary electricity
- ComputingMWh
- Overall efficiency (auxiliaries counted)
- Computing%
Sensitivities
5 chartsLog in to view this sensitivity chart.
Log in to view this sensitivity chart.
Log in to view this sensitivity chart.
Log in to view this sensitivity chart.
Log in to view this sensitivity chart.
Sources
59 documented assumptions · 8 sources
- ens.dkDanish Energy Agency, Technology Data for Generation of Electricity and District Heating (v0019), ch. 09 Biomass CHP and HOP plants, pp. 85-89; Table 3 wood-chip LHV
- ens.dkDanish Energy Agency, data sheets 09a Wood Chips HOP small and medium (xlsx v0019, 2020 EUR)investment, O&M, efficiency, auxiliaries, lifetime
- bioenergie-promotion.frADEME, Couts des energies renouvelables en France, ed. 2016, pp. 31-32industrial biomass boilers (investment, hours, efficiency, LCOH)
- bioenergie-promotion.frADEME fiche technique, Integration des EnR&R dans l'industrie - Biomasse (2018)CAPEX and heat cost ranges
- assets.publishing.service.gov.ukUK DESNZ, CHPQA Guidance Note 29 v3 (2026)wood net CV as received vs moisture
- carmen-ev.deC.A.R.M.E.N. e.V., Marktpreise Hackschnitzel, 2025 annual average (35 % moisture)
- bioenergy.org.nzFAO, Wood Fuels Handbook (2015), Table 10ash content of wood fuels (CEN/TS 14961)
- ec.europa.euEurostat nrg_pc_205, non-household electricity prices excl. VAT, 2025-S2
About
Calculator context
About
Calculator context
A screening model of an industrial grate boiler burning wood chips to deliver hot water or low-pressure steam, built for a feasibility study that has to stand in front of a lender. The wood LHV as received follows the CHPQA formula (18.3 MJ/kg dry, minus the water share and its 2.442 MJ/kg of evaporation), so the moisture content sets the tonnes to buy and the ash to remove. Two sourced reference cases set the annual efficiency: hot water without flue-gas condensation, 89 % (Danish Energy Agency, data sheet 09a, 2020 lower value), or low-pressure steam, 85 % (ADEME industrial boiler). Auxiliary electricity is 2.2 % of the heat (DEA). The installed CAPEX scales from DEA's 733.7 EUR/kW at 6.84 MW with a capacity exponent of 0.831, derived from DEA's own small and medium wood-chip sheets and counter-checked against ADEME's size bands (1,100 / 940 / 610 EUR/kW); a customized installed figure is used as is. Fixed O&M is 34,560 EUR/MW/year and variable O&M 1.27 EUR/MWh, residue disposal included (DEA). The CAPEX is installed and is exported to project mode with battery_limit = installed.
At 2,000 kW (HERZ BioFire Taurus 2000 size), 4,000 h, 35 % moisture, steam, wood at 32.40 EUR/MWh (C.A.R.M.E.N. 2025), auxiliaries at 121.7 EUR/MWh (Eurostat EU band IF), 8 % and 20 years, the boiler delivers 8,000 MWh of heat a year from about 3,069 t of chips, leaves about 40 t of ash, costs 1.81 MEUR installed (903 EUR/kW) and gives a levelised cost of heat of 73.7 EUR/MWh, of which 38.1 is wood and 23.0 capital. ADEME reports 46-79 EUR/MWh for industrial biomass heat in 2014 terms; that comparison is qualitative, as fuel prices and money years differ.
Limits: capital and O&M are DEA 2020 EUR, not escalated to 2025, while fuel and electricity are 2025 prices; below 6.84 MW the CAPEX is an extrapolation of the DEA law. Steam pressure, flue-gas cleaning beyond DEA's scope and backup capacity are not sized.
Model
123 variables — inputs, calculations and outputs, with their dependencies.
Model
123 variables — inputs, calculations and outputs, with their dependencies.
| Variable | Value | Unit | Depends on |
|---|---|---|---|
| 2000 | kW | — | |
| 4000 | h/year | — | |
| 2 | — | — | |
| 0 | — | — | |
| 900 | EUR/kW | — | |
| 35 | % | — | |
| 2 | % | — | |
| 32.4 | EUR/MWh | — | |
| 0 | EUR/t | — | |
| 121.7 | EUR/MWh | — | |
| 0.08 | ratio | — | |
| 20 | years | — |
| Variable | Formula | Unit | Depends on |
|---|---|---|---|
if((<=)+(<=)+(>)+(!=)*(!=)+(<)+(>)+(>=)*(<=)+(<)+(>)+(<)+(>=)+(<)+(<)+(<)+(<)+(>=)+(<)+(>)>,,) | bool | ||
if(==,,) | ratio |
| Variable | Formula | Unit | Depends on |
|---|---|---|---|
* | MW | ||
min(,) | h/year | ||
/* | % | ||
* | MWh | ||
* | % | ||
*(-)/-*/ | GJ/t | ||
/ | MWh/t | ||
(*(-)/-*/)/ | MWh/t | ||
/ | MWh/t | ||
if((<)+(>)>,,) | bool | ||
/max(,) | MWh/MWh | ||
+* | ratio | ||
* | MWh/MWh | ||
* | MWh | ||
* | kW | ||
*/max(,) | t | ||
/max(,) | t/MWh | ||
* | t/h | ||
*(-)/ | t | ||
- | t | ||
** | t | ||
if(>,,) | bool | ||
*/ | MWh | ||
* | MWh | ||
* | kW | ||
- | MWh | ||
/max(,) | % | ||
if(>=,,clamp(*(/)^(-),,)) | EUR/kW | ||
ln(/)/ln(/) | ratio | ||
if(<,,if(<=,,)) | EUR/kW | ||
(/max(,)-)* | % | ||
* | EUR | ||
/ | MEUR | ||
/max(+,)* | % | ||
** | EUR | ||
- | EUR | ||
if(<,/max(,),(*(+)^)/max((+)^-,)) | 1/year | ||
* | EUR/year | ||
* | EUR/year | ||
* | EUR/year | ||
* | EUR/year | ||
+ | EUR/year | ||
* | EUR/year | ||
* | EUR/year | ||
++++ | EUR/year | ||
/max(,) | EUR/MWh | ||
/max(,) | EUR/MWh | ||
/max(,) | EUR/MWh | ||
/max(,) | EUR/MWh | ||
/max(,) | EUR/MWh | ||
/max(,) | EUR/MWh | ||
/max(,)* | % | ||
* | EUR/t | ||
if(<,,if(<=,,)) | h/year | ||
(+)/max(*,)+++ | EUR/MWh | ||
-+**/max(,) | EUR/MWh | ||
if(<,/,(*(+)^)/max((+)^-,)) | 1/year | ||
-+*/max(,) | EUR/MWh | ||
(**(+*)^)/max((+*)^-,) | 1/year | ||
(**(+*)^)/max((+*)^-,) | 1/year | ||
-+*/max(,) | EUR/MWh | ||
-+*/max(,) | EUR/MWh |
Assumptions
59 assumptions used in the calculations
Assumptions
59 assumptions used in the calculations
Prevents division by zero.
Market range Not applicable.
0.000001Numerical guardNamed zero for guards (no inline literal).
Market range Not applicable.
0Numerical constantNamed one for guards and the annuity formula.
Market range Not applicable.
1Numerical constantUpper limit of full-load hours and capacity-factor base.
Market range 8760 (8784 in a leap year).
8760h/yearTime conventionFraction to percent.
Market range Not applicable.
100%Unit conversionPercent to fraction.
Market range Not applicable.
0.01Unit conversionkW to MW.
Market range Not applicable.
0.001MW/kWUnit conversionConverts LHV in GJ/t (= MJ/kg) to MWh/t.
Market range Not applicable.
3.6GJ/MWhUnit conversionEUR to million EUR.
Market range Not applicable.
1000000EUR/MEURUnit conversionReference case 1: hot water boiler without flue-gas condensation (DEA 09a, 2020 lower).
Market range Not applicable.
1Selector codeReference case 2: low-pressure steam boiler (ADEME industrial boiler).
Market range Not applicable.
2Selector codeNet calorific value of oven-dry wood, the starting point of the as-received LHV formula. The same table prints a net CV as received of 10.003 MJ/kg at 40 % moisture, which the formula reproduces.
Market range No independent range cited.
18.3MJ/kgCHPQA GN29 p. 5Each kg of water carried in the fuel takes 2.442 MJ to evaporate; this heat leaves with the flue gas in a boiler without condensation, so it is subtracted from the LHV.
Market range Not applicable (physical constant).
2.442MJ/kgCHPQA GN29 p. 4Annual net (LHV) efficiency of a wood-chip hot water boiler without flue-gas condensation. The DEA central value (1.14) includes condensation at a 40 C district-heating return; it does not apply to industrial duty and DEA says condensation is not used below 1-2 MW of input.
Market range DEA 2020: 0.89 (lower, no condensation) to 1.14 (central, with condensation).
0.89ratioReference case 1Annual efficiency of an industrial biomass boiler raising low-pressure steam. Steam returns no low-temperature water to condense the flue gas against, hence a lower figure than hot water.
Market range No independent range cited.
0.85ratioReference case 2Electricity for fuel conveyors, fans, pumps and flue-gas cleaning, per MWh of heat delivered. Rounded to 0.022.
Market range No independent range cited.
0.022MWh/MWhDEA 09a smallAnchor of the scale law: installed total investment per kW of heat at the DEA small-plant size. It is an installed figure (equipment + installation), not a boiler purchase price.
Market range DEA note J: small HOP 0.6-1.1 MEUR/MW_th; ADEME 2016: 610-1,100 EUR/kW by size band.
733.7EUR/kWDEA 09a small, 2020Size at which the 733.7 EUR/kW anchor is quoted; the scale law is centred on it.
Market range Not applicable.
6840kWDEA 09a smallCapacity exponent of the total installed cost. It is derived from DEA's own size sheets, not printed as such, and extrapolated below 6.84 MW (most of the slider). Counter-check against ADEME's independent size bands: the law gives 1,079-1,245 EUR/kW at 0.7-0.3 MW (ADEME <1 MW: 1,100), 903 EUR/kW at 2 MW (ADEME 1-3 MW: 940) and 612 EUR/kW at 20 MW (ADEME >3 MW: 610). ADEME is in 2014 money and DEA in 2020 EUR, so the agreement is qualitative.
Market range DEA small-medium -0.169, medium-large -0.155 on the specific cost (capacity exponent 0.83-0.85).
0.831Scale law exponentSecond DEA anchor; with the small sheet it fixes the exponent, recomputed in the model as a check.
Market range Not applicable.
521.1EUR/kWDEA 09a mediumSize of the medium DEA anchor.
Market range Not applicable.
51640kWDEA 09a mediumEquipment part of the DEA total; used only to split the installed CAPEX for display.
Market range Not applicable.
425.3EUR/kWDEA 09a smallInstallation part of the DEA total; used only for the split.
Market range Not applicable.
308.4EUR/kWDEA 09a smallIndependent counter-check of the scale law below 1 MW. ADEME 2016 edition, costs in 2014 terms: compared qualitatively with the 2020 EUR DEA law.
Market range1100EUR/kWADEME 2016 p. 32Counter-check of the scale law between 1 and 3 MW (2014 terms, qualitative).
Market range940EUR/kWADEME 2016 p. 32Counter-check of the scale law above 3 MW (2014 terms, qualitative).
Market range610EUR/kWADEME 2016 p. 32Lower size-band limit of the ADEME table.
Market range Not applicable.
1000kWADEME 2016 p. 32Upper size-band limit of the ADEME table.
Market range Not applicable.
3000kWADEME 2016 p. 32Fixed operation and maintenance per MW of heat capacity and year (staff, insurance, planned maintenance). Rounded to 34,560.
Market range No independent range cited.
34560EUR/MW/yearDEA 09a smallVariable O&M per MWh of heat, excluding fuel and electricity. DEA states it already includes the disposal of residues (ash), so the separate ash disposal input defaults to 0.
Market range No independent range cited.
1.27EUR/MWhDEA 09a smallPhysical service life of the plant, exported to project mode as the asset lifetime (the replacement calendar), and used for a cross-check LCOH.
Market range25yearsDEA 09a smallLower limit of the lifetime input.
Market range20yearsDEA 09a smallUpper limit of the lifetime input.
Market range35yearsDEA 09a smallTypical full-load hours of an industrial boiler below 1 MW, used for the cross-check LCOH at typical duty.
Market range3000h/yearADEME 2016 p. 32Typical full-load hours between 1 and 3 MW; also the default of the hours input.
Market range4000h/yearADEME 2016 p. 32Typical full-load hours above 3 MW.
Market range5000h/yearADEME 2016 p. 32Lower discount rate of the ADEME sensitivity, used for a cross-check LCOH.
Market range5%ADEME 2016 p. 32Upper discount rate of the ADEME sensitivity, used for a cross-check LCOH.
Market range10%ADEME 2016 p. 32Default wood-chip price per MWh LHV, and with the per-tonne price it gives the energy content C.A.R.M.E.N. assumes (a check of the LHV formula). It is a German delivered price including 7 % VAT; an industrial buyer recovering VAT pays about 7 % less.
Market range No independent range cited.
32.4EUR/MWhC.A.R.M.E.N. 2025Per-tonne price of the same chips; divided by the per-MWh price it gives 3.10 MWh/t, the energy content C.A.R.M.E.N. uses at 35 % moisture.
Market range No independent range cited.
100.45EUR/tC.A.R.M.E.N. 2025Moisture content of the reference price, used to compare the LHV formula with C.A.R.M.E.N.'s implied energy content.
Market range Not applicable.
35%C.A.R.M.E.N. 2025Lower end of the moisture measured at Danish plants; below it the page flags drier fuel than the DEA data.
Market range25%DEA ch. 09 p. 87Upper end of the measured moisture; also the slider maximum.
Market range55%DEA ch. 09 p. 87Above 60 % moisture the model refuses the point (invalid input): DEA does not report combustion beyond it.
Market range Not applicable.
60%DEA ch. 09 p. 86Commercial ceiling on ash; above it the page flags fuel outside the DEA purchase specification (bark, residues).
Market range FAO / CEN/TS 14961: forest residues 1-4 % dry.
2%DEA ch. 09 p. 87Numerical guard on the scale law. It never binds inside the slider range (checked at both ends).
Market range Not applicable.
400EUR/kWGuardNumerical guard on the scale law. It never binds inside the slider range (checked at both ends).
Market range Not applicable.
1500EUR/kWGuardPublished as-received LHV at 40 % moisture; the CHPQA formula gives 10.0 GJ/t (3 % lower).
Market range Not applicable.
10.3GJ/tDEA Table 3 p. 73Published as-received LHV at 50 % moisture; the CHPQA formula gives 7.93 GJ/t (2 % lower).
Market range Not applicable.
8.1GJ/tDEA Table 3 p. 73Low end of ADEME's industrial biomass heat cost (large plants, 2014 terms, 5-10 % rate). Different money year and fuel price from the model: a qualitative reference, not a position test.
Market range46EUR/MWhADEME 2016 p. 31High end of ADEME's industrial biomass heat cost (small plants, 2014 terms). Qualitative reference: the 2025 wood-chip price used by default is higher than ADEME's 2014 fuel cost.
Market range79EUR/MWhADEME 2018 p. 2Default of the ash content input.
Market range2%FAO Table 10 p. 11Typical ash of broad-leaf residues, for users of hardwood chips.
Market range1.5%FAO Table 10 p. 11Default price of the auxiliary electricity.
Market range121.7EUR/MWhEurostat 2025-S2LCOH = (installed CAPEX x CRF + fixed O&M + variable O&M + auxiliary electricity + fuel + optional ash disposal) / heat delivered. Fuel is bought per MWh LHV, so the moisture content changes the tonnage, not the fuel cost per MWh of heat.
Market range Not applicable.
—MethodThe CAPEX is installed (equipment and installation, two days of fuel storage), not a bare boiler purchase price and not an all-in financed total. It is exported to project mode with battery_limit = installed, so the project adds only its working layer and contingency. A catalogue boiler price (ex works) must not be entered as the Customized value without adding installation.
Market range Not applicable.
—CAPEX boundaryCapital and O&M are DEA 2020 EUR, not escalated to 2025; fuel and electricity are 2025 prices. All are held constant over the life and discounted at a real rate. The un-escalated CAPEX and O&M are therefore on the low side in 2025 money.
Market range Not applicable.
—Money conventionOver the full input box the LCOH spans about 35-155 EUR/MWh, the CAPEX 0.37-12.2 MEUR, the heat 600-140,000 MWh/year, the wood 170-86,000 t/year and the ash 0.7-1,550 t/year. Below 6.84 MW the CAPEX is an extrapolation of the DEA law, counter-checked against ADEME's size bands.
Market range Not applicable.
—Validity domainInlet: wood chips as received (t/year) and auxiliary electricity; outlet: heat as hot water or low-pressure steam (MWh/year). The steam can feed a back-pressure turbine; the chips can come from a chipping or pellet plant. The model does not size steam pressure, flue-gas cleaning beyond DEA's scope, or a backup boiler.
Market range Not applicable.
—Scope