Industrial waste-heat ORC unit: efficiency by source temperature, auxiliaries and LCOE
ORC unit on industrial waste heat (thermal-oil loop): conversion efficiency from the source temperature as a fraction of Carnot, 7 % auxiliaries, installed CAPEX on a sourced 0.867 scale law and the LCOE in EUR/MWh.
- CurrencyEUR 2013
- Battery limitinstalled
- 65 documented assumptions
- Updated2 Nov 2026
Mass and energy balance
What the asset draws and delivers for the case and load you choose.
Reference case
Equivalent hours per year at gross output. IFC 2014 gives 7,200-7,800 h/year as typical for cement kiln heat recovery and assumes 7,500 h.
Flows
- In: Industrial waste heat (thermal oil loop)—
Asset
Industrial waste-heat ORC unit
- Out: Net electricity—
Annual quantities at the current usage. Band width: share of energy in; non-energy flows are not to scale.
Gross electric power of the ORC at the generator terminals, before auxiliaries. 0.1-20 MW covers industrial waste-heat ORC units, including the catalogue products Exergy CementiRossi Pederobba (3.5 MW, the default) and Sisecam Targovishte (4.8 MW). The cost anchor is a 0.375 MW kiln ORC (Lemmens 2016); larger sizes follow its 0.867 scale law.
- Heat absorbed from the source
- — MW
- Net electric output
- — MW
- Auxiliary load
- — MW
- Heat rejected at the condenser
- — MW
CAPEX
Specific cost at this size, what backs it, and how it behaves with scale.
Specific CAPEX at this size
—
Reference size 0.375 MW
Lemmens 2016 §4.2
Model value: the Lemmens 2016 installed cost scaled to the size. Customized: your own installed figure, used as is at every size and no longer sourced.
Log in to view this sensitivity chart.
- Ex-factory
- Installed· this figure
- Fully financed
Included
- Equipment
- Installation, civil works and engineering
Not included
- Working capital
- Contingency
Added at project level
- Working capital layer, from the project settings
- Contingency, from the project settings
Project figures
Values passed to project mode when this asset is added to a project.
Industrial waste-heat ORC unitConcept sketch, not to scale · drag to rotate
- Industrial waste heat (thermal oil loop) in
- —
- Net electricity outMain product
- —
- CAPEX to the battery limit
- —
- Fixed O&M
- —
- Variable O&M, excluding feedstocks
- 0 EUR/year
- Asset lifetime
- 25 years
Log in to add this asset to a project.
Levelised cost of electricity
A standalone indicator for a quick read. Project mode recomputes it for the whole system.
—
- LCOE - capital—
- LCOE - fixed O&M—
Linked to the balance above
Equivalent hours per year at gross output. IFC 2014 gives 7,200-7,800 h/year as typical for cement kiln heat recovery and assumes 7,500 h.
Temperature of the thermal oil (or hot gas) entering the ORC evaporator. 150 °C is the IFC floor for ORC; 300 °C is the Exergy Targovishte oil inlet. Pederobba runs at 280 °C.
Thermal power the source can deliver to the oil loop (site measurement or m·cp·ΔT). It is compared with the heat the ORC must absorb; a shortfall raises a flag but does not resize the unit.
Price of the grid electricity the plant no longer buys. 180 EUR/MWh is the Eurostat EU non-household average, H1 2026, including non-recoverable taxes. Used only for the avoided cost; it does not enter the LCOE.
Real weighted average cost of capital. IRENA uses 5 % real (OECD and China, 2020) and 7.5 % in 2010.
Annuity period. IRENA uses 25 years for geothermal plants and 20 for biomass power; Quoilin gives an ORC turbine 30 years.
Log in to view this sensitivity chart.
Benchmarks
This model's figures against published references and reference cases.
Gross cycle efficiency, %
22.8 Exergy CementiRossi
24 Quoilin 2013 §4
Fraction of Carnot applied, %
30 ORNL/ICF 2015 §3.1
50 ORNL/ICF 2015 §3.1
Reference cases at this size and usage
Log in to compare the reference cases.
All results
Every model output at the current settings, grouped, with the sensitivity charts.
46 outputs · 4 groups · 13 also shown above, dimmed
Levelised cost of electricity
7- Capital share of the LCOE
- Computing%
- LCOE at 7.5 % real WACC
- ComputingEUR/MWh
- LCOE with the six-tenths rule
- ComputingEUR/MWh
- Avoided electricity purchases
- ComputingEUR/year
Conversion efficiency
8- Net conversion efficiency
- Computing%
- Carnot efficiency
- Computing%
- Carnot fraction of the Pederobba anchor
- Computing%
- Net efficiency at Targovishte conditions
- Computing%
- Efficiency capped at 24 %
- Computingbool
- Auxiliary load penalty
- Computingratio
Heat and power balance
15- Source heat coverage
- Computing%
- Heat shortfall
- Computingbool
- Gross output the source can carry
- ComputingMW
- Operating hours
- Computingh/year
- Capacity factor
- Computing%
- Gross electricity
- ComputingMWh/yr
- Auxiliary electricity
- ComputingMWh/yr
- Net electricity
- ComputingMWh/yr
- Waste heat absorbed
- ComputingMWh/yr
- Specific heat consumption
- ComputingMWh/MWh
Capital and O&M
16- Installed CAPEX (MEUR)
- ComputingMEUR
- Specific CAPEX, model value
- ComputingEUR/kW
- Specific CAPEX per net kW
- ComputingEUR/kW
- Specific CAPEX with the six-tenths rule
- ComputingEUR/kW
- ORNL installed cost bracket
- ComputingUSD/kW
- Thermal-oil loop CAPEX
- ComputingEUR
- ORC unit and integration CAPEX
- ComputingEUR
- Implied module price (low)
- ComputingEUR
- Implied module price (high)
- ComputingEUR
- Capital recovery factor
- Computing1/year
- Capital recovery factor at 7.5 %
- Computing1/year
- Annualised CAPEX
- ComputingEUR/year
- Total annual cost
- ComputingEUR/year
Sensitivities
5 chartsLog in to view this sensitivity chart.
Log in to view this sensitivity chart.
Log in to view this sensitivity chart.
Log in to view this sensitivity chart.
Log in to view this sensitivity chart.
Sources
65 documented assumptions · 8 sources
- info.ornl.govElson, Tidball, Hampson (ICF) for ORNL, Waste Heat to Power Market Assessment (2015)Carnot method §3.1, 30-50 % of Carnot, ORC cost and O&M Table 5
- mdpi.comLemmens, Cost Engineering Techniques and Their Applicability for Cost Estimation of ORC Systems, Energies 9(7) 485 (2016)375 kW kiln ORC at 4,216 EUR2013/kW installed, exponent 0.867
- openknowledge.worldbank.orgIFC / IIP, Waste Heat Recovery for the Cement SectorMarket and Supplier Analysis (2014): auxiliaries 7 %, ORC O&M, 7,200-7,800 h, 150 °C floor
- exergyint.comExergy International, CementiRossi Pederobba case study3.5 MWe, 22.8 % gross, thermal oil 280-100 °C, reheat
- exergy-orc.comExergy International, Sisecam Targovishte glass case study4.8 MWe, thermal oil 300-150 °C
- orbi.uliege.beQuoilin et al., Techno-economic survey of Organic Rankine Cycle systems, RSER 22 (2013)24 % ceiling, 2-3x module cost, 30-year turbine life
- irena.orgIRENA, Renewable Power Generation Costs in 2023, Annex I Table A1real WACC 5-7.5 %, economic life
- ec.europa.euEurostat, Electricity price statisticsEU non-household price H1 2026
About
Calculator context
About
Calculator context
This calculator targets industrial waste heat: an organic Rankine cycle (ORC) unit that turns the heat of cement-kiln or glass-furnace flue gas, engines or compressors, usually carried by a thermal-oil loop, into electricity. It is filed under the geothermal sector only to attach to the catalogue sheet of ORC power units; there is no well, no brine and the heat is free.
Efficiency follows the ORNL/ICF 2015 method: the cycle reaches a fraction of the Carnot efficiency between the source inlet temperature and a 15.6 °C sink. The default fraction, 47.7 %, is calibrated on one plant, Exergy's CementiRossi Pederobba ORC (3.5 MWe, 22.8 % gross at 280 °C oil, with reheat), so reproducing 22.8 % there is the calibration, not a validation. A non-reheat case removes Exergy's 10 % reheat gain (derived), and two cases span ORNL's 30-50 % range; the gross efficiency is capped at the 24 % Quoilin ceiling. Auxiliaries take 7 % of gross output (IFC 2014, cement WHR, transposed to ORC). At 4.8 MW and 300 °C (Exergy Targovishte) the model predicts about 22 % net; Exergy prints no efficiency for that plant.
The installed CAPEX scales from the actual cost of a 375 kW kiln ORC in Flanders, 4,216 EUR2013/kW gross including the oil circuit, piping, installation and project management (Lemmens 2016), with the 0.867 ORC capacity exponent reported by Lemmens; it is declared installed, never a module price (Quoilin: total cost 2-3x the module). Published gaps: ORNL's 2015 installed brackets (4,500 to 2,500 USD2015/kW) sit close to the model, IFC's 7,000 USD/kW for a 2 MW cement ORC sits well above it, and ORNL's O&M per kWh is about twice the 1.25 % of CAPEX derived from IFC. The CAPEX depends on electric output only, so it does not grow with the larger heat exchangers a low-temperature source needs: below about 200 °C the cost is likely understated.
At the nominal case (3.5 MW, 280 °C, 7,500 h, 5 % real WACC, 25 years) the unit absorbs 15.35 MW of heat, nets 21.2 % and 24,413 MWh/yr for 10.96 MEUR2013 installed (3,132 EUR/kW), an LCOE of about 37.5 EUR2013/MWh. Costs are in EUR 2013, not escalated; the avoided electricity price (Eurostat, H1 2026) is in EUR 2026 and is not compared with the LCOE without indexation.
Model
125 variables — inputs, calculations and outputs, with their dependencies.
Model
125 variables — inputs, calculations and outputs, with their dependencies.
| Variable | Value | Unit | Depends on |
|---|---|---|---|
| 3.5 | MW | — | |
| 7500 | h/year | — | |
| 280 | °C | — | |
| 1 | — | — | |
| 16 | MW | — | |
| 0 | — | — | |
| 3100 | EUR/kW | — | |
| 180 | EUR/MWh | — | |
| 0.05 | ratio | — | |
| 25 | years | — |
| Variable | Formula | Unit | Depends on |
|---|---|---|---|
if((<=)+(<=)+(>)+(<)+(>)+(!=)*(!=)*(!=)*(!=)+(<)+(<)+(>)+(>=)*(<=)+(<)+(<)+(>=)+(<)+(>)>,,) | bool | ||
+ | K | ||
+ | K | ||
(-/(+))* | % | ||
/(+*) | % | ||
** | % | ||
/ | ratio | ||
if(>=,,) | — | ||
* | ratio |
| Variable | Formula | Unit | Depends on |
|---|---|---|---|
(-/max(,))* | % | ||
/max(,)* | % | ||
if(==,,if(==,,if(==,,))) | % | ||
min(,) | % | ||
if(>,,) | bool | ||
* | ratio | ||
*(-) | % | ||
min(**(-/(+))*,)*(-) | % | ||
/max(*,) | MW | ||
* | MW | ||
- | MW | ||
- | MW | ||
/max(,)* | % | ||
if(<,,) | bool | ||
** | MW | ||
min(,) | h/year | ||
/* | % | ||
* | MWh/yr | ||
* | MWh/yr | ||
* | MWh/yr | ||
* | MWh/yr | ||
- | MWh/yr | ||
/max(,) | MWh/MWh | ||
clamp(*^(-),,) | EUR/kW | ||
if(>=,,clamp(*^(-),,)) | EUR/kW | ||
** | EUR | ||
/ | MEUR | ||
/max(*,) | EUR/kW | ||
** | EUR | ||
- | EUR | ||
/ | EUR | ||
/ | EUR | ||
*^(-) | EUR/kW | ||
if(<,,if(<,,if(<,,if(<=,,)))) | USD/kW | ||
if(<,/max(,),(*(+)^)/max((+)^-,)) | 1/year | ||
* | EUR/year | ||
** | EUR/year | ||
+ | EUR/year | ||
/max(,) | EUR/MWh | ||
/max(,) | EUR/MWh | ||
+ | EUR/MWh | ||
/max(,)* | % | ||
(*(+)^)/max((+)^-,) | 1/year | ||
(*+)/max(,) | EUR/MWh | ||
***(+*)/max(,) | EUR/MWh | ||
* | EUR/year |
Assumptions
65 assumptions used in the calculations
Assumptions
65 assumptions used in the calculations
Prevents division by zero.
Market range Not applicable.
0.000001Numerical guardNamed zero for guards (no inline literal).
Market range Not applicable.
0Numerical constantNamed one for guards, switches and the annuity formula.
Market range Not applicable.
1Numerical constantConverts a fraction to percent.
Market range Not applicable.
100%Unit conventionConverts a percent to a fraction.
Market range Not applicable.
0.01Unit conventionUpper limit of operating hours and capacity-factor base.
Market range 8760 (8784 in a leap year).
8760h/yearTime conventionMW to kW for the specific CAPEX.
Market range Not applicable.
1000kW/MWUnit conventionEUR to million EUR for display.
Market range Not applicable.
1000000EUR/MEURUnit conventionCarnot efficiency needs absolute temperatures.
Market range Not applicable.
273.15KUnit conventionKeeps the scale law positive if the size input is ever pushed to an absurd value.
Market range Not applicable.
1EUR/kWNumerical guardUpper numerical guard; it does not cap any value inside the declared domain.
Market range Not applicable.
1000000EUR/kWNumerical guardNumeric id of the reference case: reheat cycle, Exergy Pederobba calibration. The DSL has no strings.
Market range Not applicable.
1Numeric selector encoding.Numeric id of the reference case: non-reheat cycle. The DSL has no strings.
Market range Not applicable.
2Numeric selector encoding.Numeric id of the reference case: ORNL low end of the Carnot-fraction range. The DSL has no strings.
Market range Not applicable.
3Numeric selector encoding.Numeric id of the reference case: ORNL high end of the Carnot-fraction range. The DSL has no strings.
Market range Not applicable.
4Numeric selector encoding.Fraction of the Carnot efficiency reached by the reference case 'Reheat cycle'.
Market range ORNL: 30-50 % of Carnot for Rankine cycles.
47.7%Calibration on Exergy Pederobba (one plant).Low end of the ORNL range, used by the reference case 'ORNL low end'.
Market range30%ORNL/ICF 2015 §3.1High end of the ORNL range, used by the reference case 'ORNL high end'.
Market range50%ORNL/ICF 2015 §3.1Cold-side temperature of the Carnot efficiency. Kept fixed: no sourced air-cooled versus water-cooled split was found.
Market range No independent range cited.
15.6°CORNL Fig. 5 conventionRemoves the reheat gain from the Pederobba calibration to build the 'Non-reheat cycle' case: 47.7 / 1.10 = 43.4 % of Carnot (derived, not printed).
Market range No independent range cited.
10%Exergy CementiRossiCaps the gross cycle efficiency. It binds only in the 'ORNL high end' case above about 292 °C; the flag efficiency_capped_flag then shows 1.
Market range Current high-temperature ORC: up to 24 %.
24%Quoilin 2013 §4Calibration anchor of the default Carnot fraction; shown as a benchmark next to the gross efficiency.
Market range Quoilin 2013: current high-temperature ORC does not exceed 24 %.
22.8%Exergy CementiRossiSize of the calibration plant and default size of the calculator.
Market range Not applicable.
3.5MWExergy CementiRossiHot-side temperature of the calibration; the Carnot efficiency of the anchor is recomputed from it.
Market range Not applicable.
280°CExergy CementiRossiOil return temperature of the calibration plant; not used by the efficiency method.
Market range Not applicable.
100°CExergy CementiRossiSecond catalogue product inside the size slider.
Market range Not applicable.
4.8MWExergy TargovishteUpper limit of the source temperature and the condition of the output net_efficiency_at_targovishte_pct (a model prediction: Exergy prints no efficiency for this plant).
Market range Not applicable.
300°CExergy TargovishteOil return temperature of the Targovishte plant.
Market range Not applicable.
150°CExergy TargovishteLower limit of the source temperature; below it the input is invalid.
Market range Not applicable.
150°CIFC 2014Share of the gross output used by the unit's own auxiliaries.
Market range No independent range cited.
7%IFC 2014 Fig. 11 / 12Default of the operating-hours slider.
Market range IFC: 7,200-7,800 h/year.
7500h/yearIFC 2014Lower end of the operating-hours slider.
Market range7200h/yearIFC 2014Upper end of the operating-hours slider.
Market range7800h/yearIFC 2014Installed specific cost of the cost anchor, in EUR 2013, per kW gross.
Market range ORNL Table 5: 4,500-2,100 USD2015/kW (50 kW to >20 MW); IFC 2014: up to 7,000 USD/kW at 2 MW.
4216EUR/kWLemmens 2016 §4.1Reference size of the scale law.
Market range Not applicable.
0.375MWLemmens 2016 §4.1Capacity exponent of the installed cost on gross electric output.
Market range Generic six-tenths rule 0.6 (Lemmens §2), rejected over 0.1-20 MW.
0.867Lemmens 2016 §4.2Exponent of the comparison output specific_capex_six_tenths_eur_per_kw.
Market range Not applicable.
0.6Lemmens 2016 §2Currency year of every cost in this calculator.
Market range Not applicable.
2013yearLemmens 2016Splits the CAPEX into the thermal-oil loop and the ORC unit with its integration.
Market range No independent range cited.
11%Lemmens 2016 §4.1Lower ratio: gives the highest module price implied by the installed CAPEX.
Market range2Quoilin 2013 §3Higher ratio: gives the lowest module price implied by the installed CAPEX.
Market range3Quoilin 2013 §3ORNL bracket shown next to the model's specific CAPEX.
Market range4500USD/kWORNL/ICF 2015 Table 5ORNL bracket shown next to the model's specific CAPEX.
Market range4000USD/kWORNL/ICF 2015 Table 5ORNL bracket shown next to the model's specific CAPEX.
Market range3000USD/kWORNL/ICF 2015 Table 5ORNL bracket shown next to the model's specific CAPEX.
Market range2500USD/kWORNL/ICF 2015 Table 5Largest ORNL bracket.
Market range2100USD/kWORNL/ICF 2015 Table 5Bracket edge of the ORNL comparison.
Market range Not applicable.
0.5MWORNL/ICF 2015 Table 5Bracket edge of the ORNL comparison.
Market range Not applicable.
1MWORNL/ICF 2015 Table 5Bracket edge of the ORNL comparison.
Market range Not applicable.
5MWORNL/ICF 2015 Table 5Bracket edge of the ORNL comparison.
Market range Not applicable.
20MWORNL/ICF 2015 Table 5Upper reference for a small cement ORC; sets the top of the Customized CAPEX slider.
Market range Not applicable.
7000USD/kWIFC 2014Fixed O&M as a share of the installed CAPEX per year.
Market range ORNL: 10-20 USD2015/MWh.
1.25%/yearIFC 2014Base of the derived ORC O&M share.
Market range Not applicable.
2.5%/yearIFC 2014Cross-check of the O&M assumption.
Market range0.013USD/kWhORNL/ICF 2015 Table 5Default of the real discount rate.
Market range IRENA: 5-7.5 % real.
5%IRENA RPGC 2023 p. 199High real WACC used by the sensitivity output lcoe_at_wacc_high_eur_per_mwh.
Market range IRENA: 5-7.5 % real.
7.5%IRENA RPGC 2023 p. 199Default economic life and the service life exported to the project.
Market range25yearsIRENA RPGC 2023 p. 199Lower end of the lifetime slider.
Market range20yearsIRENA RPGC 2023 p. 199Upper end of the lifetime slider.
Market range30yearsQuoilin 2013 §4Default of the avoided electricity price (EUR 2026).
Market range180EUR/MWhEurostat H1 2026Gross efficiency = Carnot fraction x Carnot efficiency between the source inlet temperature and a 15.6 °C sink, capped at 24 % (Quoilin). Net efficiency removes 7 % auxiliaries.
Market range Not applicable.
—ORNL/ICF 2015The installed CAPEX depends on the gross electric output only. At low source temperature the heat exchangers grow with the heat input (about 1.5x more heat per kWe at 150 °C than at 280 °C), which this law does not capture: the CAPEX, and so the LCOE, is likely understated below about 200 °C.
Market range Not applicable.
—Model limitAll costs, the CAPEX and the LCOE are in EUR 2013, not escalated. The avoided electricity price is in EUR 2026; the two are not compared directly without indexation.
Market range Not applicable.
—Currency conventionThe waste heat has no cost. The LCOE is a pure cost of service: annualised installed CAPEX plus fixed O&M, per MWh net.
Market range Not applicable.
—Scope conventionThe CAPEX is declared 'installed': the project adds only its working layer and contingency.
Market range Not applicable.
—Battery limit