Electrolyser feed-water demineralisation (RO + EDI)
Reverse osmosis plus EDI polishing of tap, river or sea water to electrolysis-grade water: demand from the H2 rate, intake and brine, electricity, all-in CAPEX and the cost per m3 and per kg H2, chainable as the electrolyser water price.
Open Jack
Founder · OpenJack
- CurrencyEUR 2010
- Battery limitfully financed
- 90 documented assumptions
- Updated2 Nov 2026
Mass and energy balance
What the asset draws and delivers for the case and load you choose.
Reference case
Share of the year the unit produces at capacity. World Bank 2019 assumes 95 %. Sets the design output over which the cost is spread.
Flows
- In: Electricity—
Asset
Electrolyser feed-water demineralisation (RO + EDI)
- Out: Demineralised water—
Annual quantities at the current usage. Outline: full capacity, 8,760 h. Fill: 95.0 % capacity factor. Band width: share of energy in; non-energy flows are not to scale.
Capacity of the unit in m3/d of electrolysis-grade water (ASTM type II, under about 1 µS/cm). MAK Water DMRO-100 = 100 m3/d, DMRO-1000 = 1,000 m3/d. A 3,000 t/d ammonia plant needs about 5,300 m3/d.
- Unit capacity
- — m3/h
- Capacity utilisation
- — %
- Raw water intake
- — m3/h
- Electrical power
- — kW
CAPEX
Specific cost at this size, what backs it, and how it behaves with scale.
Specific CAPEX at this size
—
Reference size 7,576 m3/d
NETL QGESS 2019
Model value: sourced scale law. Customized: your quote per m3/d, used as entered at every size; the result is then no longer sourced.
Log in to view this sensitivity chart.
- Ex-factory
- Installed
- Fully financed· this figure
Included
- Equipment and installation
- Indirect and owner's costs
- Contingency
Not included
- Nothing
Added at project level
- Nothing: project mode uses the figure as is
Project figures
Values passed to project mode when this asset is added to a project.
Electrolyser feed-water demineralisation (RO + EDI)Concept sketch, not to scale · drag to rotate
- Electricity in
- —
- Demineralised water outMain product
- —
- CAPEX to the battery limit
- —
- Fixed O&M
- —
- Variable O&M, excluding feedstocks
- —
- Asset lifetime
- 25 years
Log in to add this asset to a project.
Cost of demineralised water
A standalone indicator for a quick read. Project mode recomputes it for the whole system.
—
- Capital share—
- O&M share—
- Electricity share—
- Raw water share—
Linked to the balance above
Share of the year the unit produces at capacity. World Bank 2019 assumes 95 %. Sets the design output over which the cost is spread.
Hydrogen rate of the electrolysers this unit feeds, in kg/h. Same key and unit as the electrolyser output of #222/#282, so it chains. 4,000 kg/h is about a 200 MW electrolyser.
9 L/kg is stoichiometry (IEA 2019); 10 L/kg includes electrolyser-side losses (IRENA 2023). Cooling-water make-up is not included.
Plant grid price. Default 42.3 EUR/MWh = the 5-6 US cents/kWh of IRENA/IEA-ETSAP 2012 at 1.3 USD/EUR. Chain it to the plant's own price.
Site-specific tariff or abstraction fee per m3 withdrawn. Unsourced; 0 by default (seawater is usually free).
Real rate: costs are in constant money. World Bank 2019 uses 5 %.
World Bank 2019 uses 25 years. Membranes and resins are replaced inside O&M.
Log in to view this sensitivity chart.
Benchmarks
This model's figures against published references and reference cases.
Raw water withdrawn per kg of H2, L/kg
15.2 IRENA 2023 Fig 2.1
28.6 IRENA 2023 Fig 2.1
Specific electricity, kWh/m3
1.61 MAK DMRO datasheet (derived)
4 IEA 2019 p.43
4.32 MAK DMRO datasheet (derived)
5.86 Derived
Reference cases at this size and usage
Log in to compare the reference cases.
All results
Every model output at the current settings, grouped, with the sensitivity charts.
51 outputs · 5 groups · 16 also shown above, dimmed
Cost of water
13- Cost of demineralised water per kg of H2
- ComputingEUR/kg
- Capital share of the cost
- Computing%
- Electricity share of the cost
- Computing%
- Annual cost at design output
- ComputingEUR/year
- Annualised CAPEX
- ComputingEUR/year
- Annual electricity cost
- ComputingEUR/year
- Capital recovery factor
- Computing1/year
Sizing and utilisation
10- Demineralised water demand
- Computingm3/h
- Required capacity
- Computingm3/d
- Demand above capacity
- Computingbool
- Capacity shortfall
- Computingm3/d
- Treated flow
- Computingm3/h
- Design output per year
- Computingm3/year
- Operating hours per year
- Computingh/year
Intake and brine
9- Brine and reject
- Computingm3/h
- Permeate rate of the train
- Computing%
- Permeate rate outside the World Bank RO range
- Computingbool
- Brine per kg of H2
- ComputingL/kg
- Raw water withdrawn per year
- Computingm3/year
- Brine discharged per year
- Computingm3/year
- Seawater case
- Computingbool
Electricity
12- Electricity per kg of H2
- ComputingkWh/kg
- Polishing train electricity
- ComputingkWh/m3
- SWRO stage electricity
- ComputingkWh/m3
- Small-unit energy penalty
- Computingratio
- Energy size exponent
- Computingratio
- Annual electricity
- ComputingMWh/year
- MAK DMRO-100 electricity (datasheet)
- ComputingkWh/m3
- Model electricity at 100 m3/d
- ComputingkWh/m3
- Model over DMRO-100 datasheet
- Computingratio
CAPEX
7- Specific CAPEX, model value
- ComputingEUR/(m3/d)
- Reference specific CAPEX
- ComputingEUR/(m3/d)
- Reference single-pass RO CAPEX
- ComputingUSD/(m3/d)
- Reference plant size
- Computingm3/d
- Polishing cost uplift
- Computingratio
Sensitivities
4 chartsLog in to view this sensitivity chart.
Log in to view this sensitivity chart.
Log in to view this sensitivity chart.
Log in to view this sensitivity chart.
Sources
90 documented assumptions · 8 sources
- irena.orgIRENA & Bluerisk (2023), Water for hydrogen production10 L/kg deionised water, withdrawal 15.2 / 28.6 L/kg, permeate rates 66/58/35 %, USD 0.02-0.05/kg (Fig 2.1, Ch. 2)
- iea.blob.core.windows.netIEA (2019), The Future of Hydrogen9 L/kg, RO 3-4 kWh/m3, USD 0.7-2.5/m3, +USD 0.01-0.02/kg, about 1 % of H2 cost (p. 43, note 60)
- irena.orgIRENA (2020), Green hydrogen cost reductionwater treatment about USD 1/m3, under USD 0.01/kg H2 (p. 40)
- irena.orgIRENA / IEA-ETSAP (2012), Tech Brief I12 Water DesalinationSWRO 800-1,500 USD2010/(m3/d), 3.5-5.0 kWh/m3, O&M 1.5-2.5 %, 1.3 USD/EUR (Tables 4-5)
- makwater.com.auMAK Water (2018), DMRO product data sheet SAL-PDS-004power and permeate of DMRO-25, -100, -1000
- netl.doe.govNETL (2019), QGESS Capital Cost Scaling Methodology Rev. 4water makeup & pretreating exponent 0.73 (Exhibit 3-4)
- openknowledge.worldbank.orgWorld Bank (2019), The Role of Desalination in an Increasingly Water-Scarce Worldpolishing cost ratio 1.40-1.55, recovery ranges, 25 y / 5 % / 95 %, SWRO water cost 0.49-2.86 USD/m3
- pmc.ncbi.nlm.nih.govPearson et al. (2021), Economics and Energy Consumption of BWRO Desalination, Membranes 11(8):616BWRO 536-1,032 USD/(m3/d), small-plant costs (Tables 3-4)
About
Calculator context
About
Calculator context
A screening model of the water treatment that feeds an electrolyser: raw water (tap, river or groundwater, or seawater) is turned into electrolysis-grade demineralised water (ASTM type II, under about 1 µS/cm) by reverse osmosis, then polished by electrodeionisation or a mixed bed. The unit runs on the plant grid. It answers the questions a permit officer and a lender ask: how much water the electrolysers draw, how much is withdrawn at the intake, how much brine goes back, whether the unit is big enough, and what each m3 and each kg of hydrogen costs.
Demand is the hydrogen rate times 9 to 10 L of demineralised water per kg (IEA 2019; IRENA 2023). The permeate rate of the whole train sets the intake and the brine: 66 % for tap water, 58 % for river or groundwater, 35 % for seawater (IRENA 2023). Each case is named after the water type, and each uses the costs and energy of one source: the fresh-water cases take Texas BWRO plant costs (Pearson et al. 2021, 536-1,032 USD per m3/d) with the MAK Water DMRO datasheet electricity (1.61 kWh/m3 at 1,000 m3/d, 4.32 at 25 m3/d); the seawater case takes IRENA/IEA-ETSAP 2012 for the SWRO stage (800-1,500 USD2010 per m3/d, 3.5-5.0 kWh/m3, O&M 1.5-2.5 % of CAPEX, 5-6 US cents/kWh, 1.3 USD/EUR) and adds the same polishing train. Polishing to electrolysis grade adds 40-55 % to the construction cost of single-pass RO (World Bank 2019, Table ES.5). CAPEX scales with capacity at the NETL exponent 0.73 for water treatment. Levelisation follows the World Bank 2019 cost basis: 25 years, 5 % real, 95 % availability.
The cost of water is levelised over the unit's design output, so it does not depend on the hydrogen rate and chains directly into the water price input of the electrolyser calculators #222/#282. The hydrogen rate sets the utilisation, and an alert fires when the electrolysers need more water than the unit makes.
This item weighs well under 1 % of the LCOH: the IEA estimates desalination adds about 1 % to hydrogen costs, and IRENA 2020 puts water treatment under USD 0.01/kg. Its value lies in permitting, water footprint (withdrawal and brine) and siting. At plant scale the model sits at or below the IEA's 0.01-0.02 USD/kg H2 and below IRENA 2023's 0.02-0.05 USD/kg, which counts all seawater withdrawal including cooling make-up, excluded here.
Limits. The 0.73 exponent was fitted on about 16,000-58,000 m3/d raw-water ranges and is extrapolated below. Both CAPEX anchors are municipal plants and are not escalated from about 2010 money; the polishing factor is a SWRO ratio transposed to BWRO. Fresh-water electricity is derived from datasheet kW over capacity; the curve fitted on DMRO-25 and DMRO-1000 overstates the DMRO-100 by about 22 %, shown as a check. Double counting: calculator #482 includes water in its rest-of-plant lump sum; if both are chained, remove the water share from #482.
Model
119 variables — inputs, calculations and outputs, with their dependencies.
Model
119 variables — inputs, calculations and outputs, with their dependencies.
| Variable | Value | Unit | Depends on |
|---|---|---|---|
| 1000 | m3/d | — | |
| 4000 | kg/h | — | |
| 1 | — | — | |
| 95 | % | — | |
| 10 | L/kg | — | |
| 42.3 | EUR/MWh | — | |
| 0 | EUR/m3 | — | |
| 5 | % | — | |
| 25 | years | — | |
| 0 | — | — | |
| 1500 | EUR/(m3/d) | — |
| Variable | Formula | Unit | Depends on |
|---|---|---|---|
if((<)+(>)+(<)+(>)+(<)+(>)+(!=)*(!=)*(!=)+(<)+(>)+(<)+(>)+(<)+(>)+(<)+(>)+(<)+(>)+(<)+(>)+(>=)*(<=)>,,) | bool | ||
*/ | kWh/m3 | ||
*/ | kWh/m3 |
| Variable | Formula | Unit | Depends on |
|---|---|---|---|
if(==,,) | bool | ||
if(==,,if(==,,)) | % | ||
*/ | m3/h | ||
* | m3/d | ||
/ | m3/h | ||
/max(,)/ | % | ||
if(>,,) | bool | ||
max(-,) | m3/d | ||
min(,) | m3/h | ||
/(*) | m3/h | ||
- | m3/h | ||
/(*) | L/kg | ||
- | L/kg | ||
if(>=,if((<)+(>)>,,),if((<)+(>)>,,)) | bool | ||
ln(/)/ln(/) | ratio | ||
clamp((/)^,,/) | ratio | ||
* | kWh/m3 | ||
*(+)* | kWh/m3 | ||
+ | kWh/m3 | ||
*/ | kWh/kg | ||
*/ | kWh/m3 | ||
*clamp((/)^,,/) | kWh/m3 | ||
/max(,) | ratio | ||
** | h/year | ||
*** | m3/year | ||
* | m3/year | ||
* | m3/year | ||
* | m3/year | ||
* | kW | ||
*/ | MWh/year | ||
| MWh/year | ||
if(>=,(+)*,(+)*) | USD/(m3/d) | ||
if(>=,,) | m3/d | ||
(+)* | ratio | ||
*/ | EUR/(m3/d) | ||
clamp(*(/)^(-),,) | EUR/(m3/d) | ||
if(>=,,) | EUR/(m3/d) | ||
* | EUR | ||
if(*<,/,(**(+*)^)/max((+*)^-,)) | 1/year | ||
* | EUR/year | ||
** | EUR/year | ||
/max(,) | EUR/m3 | ||
/max(,) | EUR/m3 | ||
*/ | EUR/m3 | ||
/(*) | EUR/m3 | ||
+++ | EUR/m3 | ||
*/ | EUR/kg | ||
/max(,)/ | % | ||
/max(,)/ | % | ||
* | EUR/year | ||
* | EUR/year |
Assumptions
90 assumptions used in the calculations
Assumptions
90 assumptions used in the calculations
Zero, for guards and flags.
Market range Exact.
0ConventionOne, for flags, selector tests and CRF.
Market range Exact.
1ConventionTakes the midpoint of a published low-high range.
Market range Exact.
0.5ConventionGuards divisions against zero.
Market range Exact.
0.000001ConventionConverts a percentage to a fraction.
Market range Exact.
0.011/%Convention100 %, the full-capacity and full-availability limit.
Market range Exact.
100%ConventionHours in a day; converts m3/d to m3/h.
Market range Exact.
24h/dConventionDays in a year.
Market range Exact.
365d/yearConventionHours in a year.
Market range Exact.
8760h/yearConventionLitres in a cubic metre.
Market range Exact.
1000L/m3ConventionkWh in a MWh.
Market range Exact.
1000kWh/MWhConventionSelector id of the tap-water case (66 % permeate rate, BWRO-type CAPEX and the fresh-water polishing train).
Market range Not applicable (selector).
1SelectorSelector id of the river or groundwater case (58 % permeate rate, BWRO-type CAPEX and the fresh-water polishing train).
Market range Not applicable (selector).
2SelectorSelector id of the seawater case (35 % permeate rate, SWRO stage ahead of the polishing train, SWRO CAPEX).
Market range Not applicable (selector).
3SelectorBelow 5 m3/d the unit is a laboratory or container skid with no published cost data; the model is invalid there.
Market range MAK DMRO range 25-1,000 m3/d.
5m3/dDomain limitUpper limit of the capacity slider; Pearson et al. 2021 Table 3 plants reach 56,818 m3/d, so the cost anchors cover it.
Market range Texas BWRO 1,364-56,818 m3/d (Pearson et al. 2021, Table 3).
10000m3/dDomain limitSame key and unit as the h2_production_kg_per_h output of the electrolyser calculators #222/#282.
Market range Not applicable (domain).
70kg/hDomain limitUpper limit of the hydrogen-rate slider.
Market range Not applicable (domain).
22000kg/hDomain limitBelow 70 % availability a membrane plant is down for repair, not in operation; the levelised cost would mean little.
Market range World Bank 2019 assumes 95 %.
70%Domain limitUpper limit of the real discount rate slider.
Market range World Bank 2019 uses 5 %.
12%Domain limitLower limit of the lifetime slider.
Market range World Bank 2019 uses 25 years.
15yearsDomain limitUpper limit of the lifetime slider.
Market range World Bank 2019 uses 25 years.
40yearsDomain limitUpper limit of the raw-water price slider.
Market range No independent range cited.
1EUR/m3Domain limitUpper limit of the electricity price slider.
Market range IRENA/IEA-ETSAP 2012 use 5-6 US cents/kWh.
200EUR/MWhDomain limitStoichiometric floor of the demineralised water demand: 18 g of water per 2 g of H2. Lower limit of the water-demand slider.
Market range 9 L/kg (stoichiometry).
9L/kgIEA 2019 p.43Demineralised water fed to the electrolyser per kg of H2, stoichiometry plus electrolyser-side losses. Upper limit and default of the water-demand slider.
Market range10L/kgIRENA 2023 Fig 2.1Share of the raw water that leaves the treatment train as demineralised water in the tap-water case; the rest is reject.
Market range BWRO 50-90 % (World Bank 2019); MAK DMRO <55 to <80 %.
66%IRENA 2023 Ch.2Permeate rate of the river or groundwater case.
Market range BWRO 50-90 % (World Bank 2019).
58%IRENA 2023 Ch.2Permeate rate of the seawater case, for the whole train (SWRO then the polishing stage), which is why it sits below the World Bank's SWRO-only 40-60 %.
Market range SWRO alone 40-60 % (World Bank 2019).
35%IRENA 2023 Ch.2Lower end of the BWRO recovery range, used to flag a case permeate rate outside it.
Market range50%World Bank 2019 p.16 printedUpper end of the BWRO recovery range.
Market range90%World Bank 2019 p.16 printedLower end of the SWRO recovery range; the seawater case (35 %) sits below it because it counts the polishing stage too, and the flag says so.
Market range40%World Bank 2019 p.16 printedUpper end of the SWRO recovery range.
Market range60%World Bank 2019 p.16 printedElectrical power of the smallest catalogue skid; with its 25 m3/d it gives 4.32 kWh/m3, the small-unit end of the energy curve.
Market range Derived 4.32 kWh/m3 at 25 m3/d.
4.5kWMAK DMRO datasheetPermeate capacity of the DMRO-25 skid.
Market range Exact (catalogue model).
25m3/dMAK DMRO datasheetOut-of-sample check of the energy curve: the curve is fitted on DMRO-25 and DMRO-1000 only.
Market range Derived 2.45 kWh/m3 at 100 m3/d.
10.2kWMAK DMRO datasheetPermeate capacity of the DMRO-100 skid.
Market range Exact (catalogue model).
100m3/dMAK DMRO datasheetElectrical power of the largest catalogue skid; with its 1,000 m3/d it gives 1.61 kWh/m3, the large-unit energy of the fresh-water train.
Market range Derived 1.61 kWh/m3 at 1,000 m3/d.
67kWMAK DMRO datasheetPermeate capacity of the DMRO-1000 skid; also the size above which the energy curve is flat.
Market range Exact (catalogue model).
1000m3/dMAK DMRO datasheetLow end of the SWRO stage electricity; the seawater case uses the midpoint.
Market range3.5kWh/m3IRENA/IEA-ETSAP 2012 Table 5High end of the SWRO stage electricity.
Market range5kWh/m3IRENA/IEA-ETSAP 2012 Table 5Low end of the SWRO plant capital cost; the seawater case uses the midpoint, 1,150 USD2010/(m3/d), with the same table's energy and O&M (theme-33 lesson: one source, one case).
Market range800USD/(m3/d)IRENA/IEA-ETSAP 2012 Table 5High end of the SWRO plant capital cost.
Market range1500USD/(m3/d)IRENA/IEA-ETSAP 2012 Table 5Size at which the SWRO capital-cost range applies; the scaling law is anchored there.
Market range4500m3/dIRENA/IEA-ETSAP 2012 Table 5Low end of the Texas BWRO plant capital cost (1,364-56,818 m3/d plants, 2002-2013 USD, not escalated); the two fresh-water cases use the midpoint, 784 USD/(m3/d).
Market range536USD/(m3/d)Pearson et al. 2021 Table 3High end of the Texas BWRO plant capital cost.
Market range1032USD/(m3/d)Pearson et al. 2021 Table 3Plant size at which the BWRO capital cost is anchored (a Table 3 plant inside the 1,364-56,818 m3/d range).
Market range7576m3/dPearson et al. 2021 Table 3Low end of the cost uplift that takes a single-pass RO plant to electrolysis-grade water (second pass and ion exchange or EDI). A SWRO ratio, transposed to BWRO.
Market range1.4World Bank 2019 Table ES.5High end of the polishing cost uplift; the model uses the midpoint, 1.475.
Market range1.55World Bank 2019 Table ES.5CAPEX = reference x (size / reference size)^0.73, so the specific CAPEX per m3/d falls with size to the power -0.27. Fitted by NETL on about 16,000-58,000 m3/d raw-water ranges: below that it is extrapolated.
Market range0.73NETL QGESS 2019Membranes, resins or EDI stacks, chemicals, labour and maintenance, excluding electricity, as a share of CAPEX per year. Applied to the polishing-inclusive CAPEX, so the World Bank O&M ratio for polishing (1.32-1.45) is roughly carried with it.
Market range2%/yearIRENA/IEA-ETSAP 2012 Table 5Converts the USD capital costs to EUR at the rate the SWRO cost source itself uses. No price-year escalation is applied.
Market range 1.3 USD/EUR (2010-2012).
1.3USD/EURIRENA/IEA-ETSAP 2012 Table 4Floor of the clamp on the scaled specific CAPEX; never reached inside the declared domain.
Market range Model range about 820-8,200 EUR/(m3/d).
100EUR/(m3/d)GuardCeiling of the clamp on the scaled specific CAPEX; never reached inside the declared domain.
Market range Model range about 820-8,200 EUR/(m3/d).
20000EUR/(m3/d)GuardReference withdrawal per kg of H2 for tap water. The model reproduces it by construction (10 L / 66 % comes from the same figure): it is a consistency marker, not an independent validation.
Market range 15.2 L/kg (tap water).
15.2L/kgIRENA 2023 Fig 2.1Reference withdrawal per kg of H2 for seawater; reproduced by construction (10 L / 35 %), not an independent check.
Market range 28.6 L/kg (seawater).
28.6L/kgIRENA 2023 Fig 2.1Independent SWRO-only energy marker. The seawater case adds the polishing train, so it should sit above this range.
Market range3kWh/m3IEA 2019 p.43High end of the IEA SWRO energy marker.
Market range4kWh/m3IEA 2019 p.43Large-unit electricity of the fresh-water train, recomputed in the model from the datasheet power and capacity.
Market range1.61kWh/m3MAK DMRO datasheet (derived)Small-skid electricity of the fresh-water train; caps the small-unit penalty.
Market range4.32kWh/m3MAK DMRO datasheet (derived)Electricity of the seawater case at 1,000 m3/d and above. Below that the polishing train carries the small-unit penalty.
Market range5.86kWh/m3DerivedLow end of the NETL water-treatment exponents.
Market range0.71NETL QGESS 2019High end of the NETL water-treatment exponents.
Market range0.75NETL QGESS 2019Low end of the O&M range.
Market range1.5%/yearIRENA/IEA-ETSAP 2012 Table 5High end of the O&M range.
Market range2.5%/yearIRENA/IEA-ETSAP 2012 Table 5Not applied separately: O&M is a share of the polishing-inclusive CAPEX, whose 1.475 uplift is close to this ratio.
Market range1.32World Bank 2019 Table ES.5High end of the polishing O&M ratio (not applied separately).
Market range1.45World Bank 2019 Table ES.5Basis of the default electricity price: midpoint 5.5 US cents/kWh / 1.3 = 42.3 EUR/MWh, so the seawater case uses this source's price with its costs and energy. Chain to the plant's own price.
Market range0.05USD/kWhIRENA/IEA-ETSAP 2012High end of the source electricity price.
Market range0.06USD/kWhIRENA/IEA-ETSAP 2012Default economic life and the service life exported to project mode. The source gives a payment term, not a measured service life; membranes and resins are replaced inside the O&M share, so 25 years is the life of the civil works, pumps and vessels. No independent physical-life source is cited.
Market range No independent range cited.
25yearsWorld Bank 2019Default real discount rate. All costs are constant money (2010 USD converted at 1.3, no escalation), so the rate is real.
Market range 5 % (World Bank 2019).
5%World Bank 2019Default availability: the share of the year the unit produces at its capacity.
Market range 95 %.
95%World Bank 2019 Table 4.1Cross-check of water_cost_eur_per_m3, qualitative only: USD 2019 against the model's EUR at 2010 USD costs. The model's seawater case (about 0.6 EUR/m3 at 4,500 m3/d) sits at the low end.
Market range USD 0.7-2.5/m3.
0.7USD/m3IEA 2019 p.43High end of the IEA desalination cost.
Market range USD 0.7-2.5/m3.
2.5USD/m3IEA 2019 p.43Cross-check of water_cost_eur_per_kg_h2 (qualitative, different currency and year). The model at plant scale gives 0.003-0.008 EUR/kg, at or below this range.
Market range USD 0.01-0.02/kg.
0.01USD/kgIEA 2019 p.43High end of the IEA cost per kg.
Market range USD 0.01-0.02/kg.
0.02USD/kgIEA 2019 p.43The model sits below this range. IRENA 2023 counts all seawater withdrawal, including cooling make-up, which this calculator excludes; the gap is published, not hidden.
Market range USD 0.02-0.05/kg.
0.02USD/kgIRENA 2023High end of the IRENA 2023 range.
Market range USD 0.02-0.05/kg.
0.05USD/kgIRENA 2023Order-of-magnitude marker for the fresh-water cases (qualitative, USD 2020).
Market range About USD 1/m3.
1USD/m3IRENA 2020 p.40Withdrawal marker: the model's fresh-water cases give 15-17 L/kg, a little below IRENA 2020's range, which assumes a lower permeate rate.
Market range18kg/kgIRENA 2020 p.40High end of the IRENA 2020 withdrawal range.
Market range24kg/kgIRENA 2020 p.40Lower bound of the plausible cost of water (municipal SWRO, potable grade).
Market range USD 0.49-2.86/m3.
0.49USD/m3World Bank 2019High end of the municipal SWRO cost of water.
Market range USD 0.49-2.86/m3.
2.86USD/m3World Bank 2019Small-unit cost marker; the model gives about 1.9 EUR/m3 at 5 m3/d with defaults, and up to about 10 EUR/m3 at the most adverse corner of the sliders.
Market range5.08USD/m3Pearson et al. 2021 Table 4High end of the small BWRO cost.
Market range11.55USD/m3Pearson et al. 2021 Table 4Why this item weighs little in the LCOH: its value is permitting, water footprint and siting.
Market range About 1 % of H2 cost.
1%IEA 2019 note 60Demand = H2 rate x water per kg; treated flow = the smaller of the demand and the unit capacity; raw water = treated / permeate rate; brine = raw water - treated. Cooling-water make-up is excluded.
Market range Not applicable (method).
—IRENA 2023The cost of water is levelised at the unit's design output (capacity x availability), not at the electrolyser's demand, so it does not change with the hydrogen rate and chains cleanly into the water price input of the electrolyser calculators #222/#282. An oversized unit therefore shows a lower cost per m3 than it will deliver on a project; project mode recomputes it from the actual flows.
Market range Not applicable (method).
—World Bank 2019If this calculator is chained in the same project as #482, the water share must be removed from #482, otherwise the demineralisation plant is paid twice.
Market range Not applicable (chaining).
—Chaining ruleCosts are in about 2010 money converted at 1.3 USD/EUR and are not escalated to today; a quote today would be higher. Use the Customized CAPEX option with a supplier quote for a current figure.
Market range Not applicable (basis).
—Currency basis