Energy mass balanceCostingBiomass
Biogas CHP gas engine: efficiency by size, biogas flow, maintenance and LCOE with heat credit
Biogas CHP gas engine from 100 to 4,500 kW: electrical and thermal efficiency by size (ASUE 2011, DEA) or from Jenbacher J416/J620 datasheets, biogas flow in Nm3/h at the stated methane content, full-service maintenance per running hour (ASUE 2014), installed CAPEX with a sourced piecewise scaling law, and the LCOE with heat credit.
- CurrencyEUR 2014
- Battery limitinstalled
- 89 documented assumptions
- Updated2 Nov 2026
Mass and energy balance
What the asset draws and delivers for the case and load you choose.
Reference case
Hours a year the engine runs at rated output. Default 8,000 h (ENavi biogas reference plant). Flexible plants under the German EEG run about 3,942 h (BMWK 2024). Project mode sets it from the digester it is chained to.
Flows
- In: Biogas (LHV)—
Asset
Biogas CHP gas engine
- Out: Electricity—
- Out: Heat sold (hot water)—
Annual quantities at the current usage. Band width: share of energy in; non-energy flows are not to scale.
Rated electrical output of the gas engine generator set. 100 to 4,500 kW. Default 1,248 kW, the INNIO Jenbacher J416 on biogas; the Jenbacher J620 is 3,349 kW. The cost laws (ASUE 2014) are fitted on offers up to about 2,500 kW and extrapolated above.
- Biogas flow
- — Nm3/h
- Thermal output
- — kW
- Biogas energy input
- — kW
- Installed CAPEX
- — EUR
CAPEX
Specific cost at this size, what backs it, and how it behaves with scale.
Specific CAPEX at this size
—
Reference size 1,000 kW
ENavi 2021 / ASUE 2014
Model value: the ASUE 2014 module cost law for the size. Customized: your own module quote (ex-works, EUR per kW), used as is at every size; installation is still added from the ASUE bands, and the figure is then no longer sourced.
Log in to view this sensitivity chart.
- Ex-factory
- Installed· this figure
- Fully financed
Included
- Equipment
- Installation, civil works and engineering
Not included
- Working capital
- Contingency
Added at project level
- Working capital layer, from the project settings
- Contingency, from the project settings
Project figures
Values passed to project mode when this asset is added to a project.
Biogas CHP gas engineConcept sketch, not to scale · drag to rotate
- Biogas (LHV) in
- —
- Electricity outMain product
- —
- Heat sold (hot water) out
- —
- CAPEX to the battery limit
- —
- Fixed O&M
- —
- Variable O&M, excluding feedstocks
- —
- Asset lifetime
- 25 years
Log in to add this asset to a project.
Levelised cost of electricity
A standalone indicator for a quick read. Project mode recomputes it for the whole system.
—
- Capital component—
- Insurance and administration component—
- Maintenance component—
- Biogas component—
- Heat credit—
Linked to the balance above
Hours a year the engine runs at rated output. Default 8,000 h (ENavi biogas reference plant). Flexible plants under the German EEG run about 3,942 h (BMWK 2024). Project mode sets it from the digester it is chained to.
Volume share of methane in the raw biogas. FNR gives 50 to 75 %, and uses 55 % in its worked example. Sets the biogas flow in Nm3/h, the figure to compare with a digester's output.
Share of the co-produced heat sold to an outside user. Default 41.2 %, the mean external heat use of German biogas plants 2012-2017 (DBFZ Report 32); a further 26 % heats the digester itself.
Price of the heat sold, at the CHP flange. Default 30 EUR/MWh (3.0 ct/kWh_th, BMWK / Fraunhofer IEE / DBFZ 2024, 2023 data). Credited against the cost of electricity.
Cost of the biogas per MWh of lower heating value. Default 48.8 EUR/MWh: the IEA 2020 European average production cost of USD 16/MMBtu at the 2019 ECB rate. Use your own digestion cost (calculators #308 / #309) instead.
Feed-in tariff or sale price of the electricity, if you have one. 0 means none: the margin output then stays at 0. Only used for the margin against the LCOE.
Nominal weighted average cost of capital, as a fraction. Default 0.0734 (ENavi 2021). Costs are in constant euros, so the model converts it to a real rate with 2 % inflation (ECB target) before annualising the CAPEX.
Years over which the CAPEX is annualised. Default 20 years (BMWK / IEE / DBFZ 2024). DEA gives a technical lifetime of 25 years.
Log in to view this sensitivity chart.
Benchmarks
This model's figures against published references and reference cases.
Electrical efficiency, %
43 DEA Technology Data 06
43.7 Jenbacher J416 page
43.7 Jenbacher J620 page
Thermal efficiency, %
41.4 Jenbacher J620 page
48 ASUE 2011, Annex B
Maintenance per MWh, EUR/MWh
9.94 DEA Technology Data 06, derived
Reference cases at this size and usage
Log in to compare the reference cases.
All results
Every model output at the current settings, grouped, with the sensitivity charts.
59 outputs · 6 groups · 18 also shown above, dimmed
Cost of electricity
10- Cost of electricity before heat credit
- ComputingEUR/MWh
- Biogas share of the cost
- Computing%
- Margin against your tariff
- ComputingEUR/MWh
- IEA European biogas cost
- ComputingEUR/MWh
Flows
11- Electricity generated
- ComputingMWh/yr
- Heat co-produced
- ComputingMWh/yr
- Heat sold
- ComputingMWh/yr
- Heat not sold
- ComputingMWh/yr
- Heat left after digester heating
- ComputingMWh/yr
- Heat sold above what is left
- Computingbool
- Methane flow
- ComputingNm3/h
- Biogas used a year
- ComputingNm3/yr
- Biogas heating value
- ComputingkWh/Nm3
Performance
13- Total efficiency
- Computing%
- Size-law electrical efficiency
- Computing%
- Slope of the efficiency law
- Computing%/ln
- Specific biogas consumption
- ComputingkWh/kWh
- Power-to-heat ratio
- Computingratio
- Electrical output
- ComputingMW
- Conversion losses
- ComputingMWh/yr
- Size far from the datasheet product
- Computingbool
Operation
10- Running hours used
- Computingh/yr
- Capacity factor
- Computing%
- Fixed-cost factor against 8,000 h
- Computingratio
- Maintenance rate
- Computingct/kWh
- Maintenance per running hour
- ComputingEUR/h
- Major overhaul cost (information)
- ComputingEUR
- Years to major overhaul (earliest)
- Computingyears
- Years to major overhaul (latest)
- Computingyears
CAPEX
8- Installed CAPEX per kW
- ComputingEUR/kW
- Module cost (ex-works)
- ComputingEUR
- Installation cost
- ComputingEUR
- Installation add-on
- Computing%
- Specific module cost at 1,000 kW
- ComputingEUR/kW
- Scale exponent applied
- Computingratio
Annual costs
7- Capital recovery factor
- Computing1/yr
- Real discount rate
- Computingratio
- Annualised CAPEX
- ComputingEUR/yr
- Biogas cost a year
- ComputingEUR/yr
- Heat revenue a year
- ComputingEUR/yr
- Net yearly cost
- ComputingEUR/yr
Sensitivities
6 chartsLog in to view this sensitivity chart.
Log in to view this sensitivity chart.
Log in to view this sensitivity chart.
Log in to view this sensitivity chart.
Log in to view this sensitivity chart.
Log in to view this sensitivity chart.
Sources
89 documented assumptions · 11 sources
- ikem.deBBHC / IKEM / SW Heidelberg / TU Berlin, Kopernikus ENavi, Flexibilisierung der Biomasse-KWK (2021)ASUE 2014 cost, installation and maintenance laws, WACC, reference plant
- bhkw-infozentrum.deASUE / BHKW-Infozentrum, BHKW-Kenndaten 2011100 kW biogas module efficiencies, overhaul and maintenance regressions
- ens.dkDanish Energy Agency, Technology Data for electricity and district heating, 06 Spark ignition engine, biogas43 % efficiency, investment, O&M, lifetime
- jenbacher.comINNIO Jenbacher J416 product page1,248 kW on biogas, 43.3 % el / 43.4 % th
- jenbacher.comINNIO Jenbacher J620 product page3,349 kW on biogas, 44.8 % el / 41.4 % th
- bosy-online.deFNR, Biogas Basisdaten Deutschland (2008)methane 9.97 kWh/Nm3, CH4 50-75 %
- iea.orgIEA (2020), Outlook for biogas and biomethanebiogas production cost, Europe about USD 16/MMBtu
- bundeswirtschaftsministerium.deFraunhofer IEE / DBFZ / ESE for BMWK, Kurzfristanalyse Biomasse-Kosten (2024)heat price, 20-year life, module cost rise 2020-2023
- dbfz.deDBFZ Report 32, Waermenutzung von Biogasanlagen (2019)41.2 % external heat use, 26 % own demand
- ecb.europa.euECB euro reference rate, USD 2019 average 1.1195
- ecb.europa.euECB monetary policy strategy2 % inflation target
About
Calculator context
About
Calculator context
Unit calculator for a biogas combined heat and power (CHP) gas engine: a spark-ignition, lean-burn engine fed with raw digester biogas. Biogas comes in, electricity goes out, and the heat recovered from jacket water and exhaust is a co-product. The size input is the rated electrical output, 100 to 4,500 kW; the default 1,248 kW is the INNIO Jenbacher J416 on biogas.
Efficiencies. Three reference cases. (1) A size-based law: electrical efficiency rises log-linearly from 38 % at 100 kW (four ASUE 2011 biogas modules of 100-104 kW all print 38 %) to 43 % at 3 MW (Danish Energy Agency, biogas engine, 3-10 MWe), capped at 45 %; thermal efficiency is 86 % minus electrical (ASUE 100 kW modules and the J620 both print about 86 % total). This law is conservative against manufacturer top ratings: it gives 41.7 % at 1,248 kW where the J416 prints 43.3 % (up to 43.7 %), and 43.2 % at 3,349 kW where the J620 prints 43.7-44.8 %. (2) and (3): the printed biogas ratings of the Jenbacher J416 and J620, applied as is at the size set.
Biogas demand. Fuel input = electrical output / electrical efficiency; the biogas flow in Nm3/h divides it by 9.97 kWh/Nm3 of methane times the methane content (FNR, 50-75 %, default 55 %). This flow is the figure to compare with the digestion calculators #308 / #309.
Costs. The module cost follows the ASUE 2014 power law by size band (ENavi 2021, Table 1: exponent 0.675 from 100 to 1,000 kW, 0.883 above), plus an installation add-on of 51 % to 95 % of the module cost by band (ASUE 2014 via ENavi, Table 8). The sum is declared installed; planning, building, grid connection and gas treatment are excluded. Maintenance is a full-service contract including the major overhaul (ASUE 2014 via ENavi, Table 9), in ct/kWh: 18.3 EUR/MWh at 100 kW, 10.4 at 1,248 kW, 6.1 at 4,500 kW; it steps up at 1,000 kW where two regressions meet. Insurance and administration add 2.5 % of CAPEX a year. The LCOE annualises the CAPEX at a real rate (the ENavi 7.34 % nominal WACC deflated by the ECB 2 % target) over 20 years (BMWK 2024), adds maintenance, insurance and biogas (default 48.8 EUR/MWh, the IEA 2020 European average converted at the 2019 ECB rate), and credits the heat sold (41.2 % of the heat, DBFZ; 30 EUR/MWh, BMWK 2023).
Nominal case (1,248 kW, 8,000 h, 55 % CH4): 41.7 % electrical and 44.3 % thermal efficiency, 546 Nm3/h of biogas, 9,984 MWh of electricity and 10,601 MWh of heat a year, installed CAPEX 1.06 MEUR (847 EUR/kW), LCOE 125.5 EUR/MWh, of which biogas 117.0, maintenance 10.4, capital 8.7, insurance 2.6 and heat credit -13.1. Biogas makes 84 % of the cost before heat credit: the biogas cost input dominates the result.
Limits. Costs are in 2014 euros (ASUE) and are not escalated; BMWK 2024 reports biogas module costs up 26-44 % between 2020 and 2023, so use the Customized module cost for a current quote. Price years are mixed (2014 CAPEX and maintenance, 2019-2020 biogas, 2023 heat). The ASUE cost laws above 1,000 kW are fitted on offers plotted up to about 2,500 kW and are extrapolated to 4,500 kW. As a qualitative check only (different scope and year), the DEA gives 0.95 MEUR/MW for a 1-10 MWe biogas engine plant in 2020 euros. Part-load operation is not modelled.
Model
143 variables — inputs, calculations and outputs, with their dependencies.
Model
143 variables — inputs, calculations and outputs, with their dependencies.
| Variable | Value | Unit | Depends on |
|---|---|---|---|
| 1248 | kW | — | |
| 1 | — | — | |
| 8000 | h/yr | — | |
| 55 | % | — | |
| 41.2 | % | — | |
| 30 | EUR/MWh | — | |
| 48.8 | EUR/MWh | — | |
| 0 | EUR/MWh | — | |
| 0.0734 | ratio | — | |
| 20 | years | — | |
| 0 | — | — | |
| 434 | EUR/kW | — |
| Variable | Formula | Unit | Depends on |
|---|---|---|---|
if((<=)+(>)+(<=)+(>)+(<)+(>)+(<)+(>)+(<)+(<)+(<)+(<)+(<=)+(<)+(>)+(<)+(>)+(<=)>0,1,0) | bool | ||
if(<,,if(<=,,)) | EUR/kW | ||
if(<,,if(<=,,)) | ct/kWh | ||
if(<,,if(<=,,)) | — |
| Variable | Formula | Unit | Depends on |
|---|---|---|---|
* | MW | ||
min(,) | h/yr | ||
/* | % | ||
/max(,) | ratio | ||
(-)/ln(/) | %/ln | ||
min(+*ln(/),) | % | ||
if(==,,if(==,,)) | % | ||
if(==,-,if(==,,)) | % | ||
+ | % | ||
/max(,) | kWh/kWh | ||
* | kW | ||
** | kW | ||
/max(,) | ratio | ||
** | kWh/Nm3 | ||
/max(,) | Nm3/h | ||
** | Nm3/h | ||
* | Nm3/yr | ||
** | MWh/yr | ||
** | MWh/yr | ||
** | MWh/yr | ||
** | MWh/yr | ||
- | MWh/yr | ||
*(-)* | MWh/yr | ||
if(>-,,) | bool | ||
-- | MWh/yr | ||
-- | MWh/yr | ||
if(==,if(abs(/-)>*,,),if(==,if(abs(/-)>*,,),)) | bool | ||
if(<,,if(<=,,)) | ratio | ||
*^(-) | EUR/kW | ||
if(>=,,clamp(*(/)^(-),,)) | EUR/kW | ||
* | EUR | ||
if(<,,if(<,,if(<,,if(<=,,)))) | % | ||
** | EUR | ||
+ | EUR | ||
/max(,) | EUR/kW | ||
(+)/(+*)- | ratio | ||
if(<,/max(,),(*(+)^)/max((+)^-,)) | 1/yr | ||
* | EUR/yr | ||
** | EUR/yr | ||
*^ | ct/kWh | ||
* | EUR/MWh | ||
** | EUR/h | ||
* | EUR/yr | ||
*^* | EUR | ||
/max(,) | years | ||
/max(,) | years | ||
* | EUR/yr | ||
* | EUR/yr | ||
// | EUR/MWh | ||
+++- | EUR/yr | ||
/max(,) | EUR/MWh | ||
/max(,) | EUR/MWh | ||
/max(,) | EUR/MWh | ||
/max(,) | EUR/MWh | ||
-/max(,) | EUR/MWh | ||
+++ | EUR/MWh | ||
+ | EUR/MWh | ||
/max(,)* | % | ||
if(>,-,) | EUR/MWh |
Assumptions
89 assumptions used in the calculations
Assumptions
89 assumptions used in the calculations
Protects divisions against a zero denominator.
Market range Not applicable (numerical parameter).
0Numerical guard.Value of the flags when false, and lower limit of the validity checks.
Market range Exact.
0Unit conversion.Unit value used in the CRF, the flags and the CAPEX basis switch.
Market range Exact.
1Unit conversion.Percent scale.
Market range Exact.
100Unit conversion.Turns a percent into a fraction.
Market range Exact.
0.01Unit conversion.Hours in a year; upper limit of the running hours.
Market range Exact.
8760h/yrUnit conversion.kW x h to MWh.
Market range Exact.
0.001MWh/kWhUnit conversion.kW to MW.
Market range Exact.
0.001MW/kWUnit conversion.Euro cents to euros.
Market range Exact.
0.01EUR/ctUnit conversion.1 ct/kWh = 10 EUR/MWh.
Market range Exact.
10(EUR/MWh)/(ct/kWh)Unit conversion.1 MMBtu (million British thermal units) = 0.29307107 MWh; used to convert the IEA biogas cost.
Market range Exact.
0.293071MWh/MMBtuUnit conversion.Small-size anchor of the electrical efficiency law (model case).
Market range 38 % on all four 100-104 kW modules listed.
38%ASUE 2011, Annex BElectrical power of the small anchor.
Market range100kWASUE 2011, Annex BLarge-size anchor of the electrical efficiency law (model case).
Market range DEA 43 % (net, 3-10 MWe) to 44.8 % (Jenbacher J620 datasheet).
43%DEA Technology Data 06Electrical power of the large anchor.
Market range3000kWDEA Technology Data 06, note ACeiling on the size-based electrical efficiency.
Market range Not reached in 100-4,500 kW.
45%Jenbacher J620 pageTotal (electrical + thermal) efficiency of the model case; thermal = total - electrical.
Market range 86 % (ASUE, J620) to 88.4 % (J620 second rating).
86%ASUE 2011 + Jenbacher J620Reference case 1: size-based efficiency law (ASUE 2011 / DEA).
Market range Not applicable.
1Selector.Reference case 2: INNIO Jenbacher J416 biogas datasheet.
Market range Not applicable.
2Selector.Reference case 3: INNIO Jenbacher J620 biogas datasheet.
Market range Not applicable.
3Selector.Lowest valid reference case.
Market range Not applicable.
1Selector.Highest valid reference case.
Market range Not applicable.
3Selector.Electrical efficiency of case 2.
Market range 43.3 % (biogas rating) to 43.7 % (type maximum).
43.3%Jenbacher J416 pageThermal efficiency of case 2.
Market range No independent range cited.
43.4%Jenbacher J416 pageRated electrical output of the J416.
Market range Not applicable.
1248kWJenbacher J416 pageElectrical efficiency of case 3.
Market range44.8%Jenbacher J620 pageThermal efficiency of case 3.
Market range41.4%Jenbacher J620 pageRated electrical output of the J620.
Market range Not applicable.
3349kWJenbacher J620 pageTolerance of the size-mismatch flag of cases 2 and 3.
Market range Not applicable.
50%Model convention.Energy of one Nm3 of methane (LHV).
Market range 9.97 kWh/Nm3 (LHV).
9.97kWh/Nm3FNR 2008Lowest valid methane content.
Market range50%FNR 2008Highest valid methane content.
Market range75%FNR 2008Upper limit of the validity domain of the size input.
Market range Not applicable.
8924kWASUE 2011Lower band edge of the cost laws.
Market range Not applicable.
100kWENavi 2021, Table 1Upper band edge of the cost laws.
Market range Not applicable.
1000kWENavi 2021, Table 1Reference size at which the specific module cost is anchored.
Market range Not applicable.
1000kWENavi 2021, Table 1Coefficient of the module cost law below 100 kW.
Market range No independent range cited.
10267EUR/kWENavi 2021 / ASUE 2014Scale exponent of the module cost below 100 kW.
Market range No independent range cited.
0.503ENavi 2021 / ASUE 2014Coefficient of the module cost law from 100 to 1,000 kW.
Market range ASUE 2011: 15648 x P^-0.536 EUR/kW (2011 basis).
4276EUR/kWENavi 2021 / ASUE 2014Scale exponent of the module cost from 100 to 1,000 kW, the declared law of the page; above 1,000 kW the flatter ASUE band takes over.
Market range 0.464 (ASUE 2011) to 0.883 (ASUE 2014 above 1 MW).
0.675ENavi 2021 / ASUE 2014Coefficient of the module cost law above 1,000 kW.
Market range No independent range cited.
1,000.1EUR/kWENavi 2021 / ASUE 2014Scale exponent of the module cost above 1,000 kW.
Market range No independent range cited.
0.883ENavi 2021 / ASUE 2014Lower guard of the specific module cost.
Market range Not applicable (numerical parameter).
100EUR/kWNumerical guard.Upper guard of the specific module cost.
Market range Not applicable (numerical parameter).
20000EUR/kWNumerical guard.Band edge of the installation add-on.
Market range Not applicable.
350kWENavi 2021, Table 8Band edge of the installation add-on.
Market range Not applicable.
500kWENavi 2021, Table 8Band edge of the installation add-on.
Market range Not applicable.
750kWENavi 2021, Table 8Installation add-on on the module cost: transport, assembly, connection and integration (planning, building, grid connection and gas treatment excluded).
Market range 51 % (<350 kW) to 95 % (>1,000 kW) across the ASUE bands.
51%ENavi 2021, Table 8Installation add-on on the module cost: transport, assembly, connection and integration (planning, building, grid connection and gas treatment excluded).
Market range 51 % (<350 kW) to 95 % (>1,000 kW) across the ASUE bands.
60%ENavi 2021, Table 8Installation add-on on the module cost: transport, assembly, connection and integration (planning, building, grid connection and gas treatment excluded).
Market range 51 % (<350 kW) to 95 % (>1,000 kW) across the ASUE bands.
66%ENavi 2021, Table 8Installation add-on on the module cost: transport, assembly, connection and integration (planning, building, grid connection and gas treatment excluded).
Market range 51 % (<350 kW) to 95 % (>1,000 kW) across the ASUE bands.
74%ENavi 2021, Table 8Installation add-on on the module cost: transport, assembly, connection and integration (planning, building, grid connection and gas treatment excluded).
Market range 51 % (<350 kW) to 95 % (>1,000 kW) across the ASUE bands.
95%ENavi 2021, Table 8Coefficient of the full-service maintenance law.
Market range ASUE 2011: 17.053 x P^-0.478 ct/kWh_el.
16.1ct/kWhENavi 2021 / ASUE 2014Coefficient of the full-service maintenance law.
Market range ASUE 2011: 17.053 x P^-0.478 ct/kWh_el.
6.869ct/kWhENavi 2021 / ASUE 2014Coefficient of the full-service maintenance law.
Market range ASUE 2011: 17.053 x P^-0.478 ct/kWh_el.
19.396ct/kWhENavi 2021 / ASUE 2014Exponent of the full-service maintenance law.
Market range No independent range cited.
-0.431ENavi 2021 / ASUE 2014Exponent of the full-service maintenance law.
Market range No independent range cited.
-0.287ENavi 2021 / ASUE 2014Exponent of the full-service maintenance law.
Market range No independent range cited.
-0.411ENavi 2021 / ASUE 2014Coefficient of the major overhaul cost.
Market range No independent range cited.
830.23EUR/kWASUE 2011Exponent of the major overhaul cost.
Market range No independent range cited.
-0.268ASUE 2011Shortest interval to the major overhaul.
Market range30000hENavi 2021Longest interval to the major overhaul.
Market range60000hENavi 2021Yearly insurance and administration as a share of CAPEX.
Market range No independent range cited.
2.5%ENavi 2021, Annex AInflation used in the Fisher conversion of the nominal discount rate.
Market range 2 % (target).
2%ECB strategyReference running hours; default of the usage lever and basis of the fixed-cost factor.
Market range 3,942 h (BMWK flexible) to 8,000 h (ENavi baseload).
8000h/yrENavi 2021, Table 5European average biogas production cost, the basis of the default biogas price.
Market range USD 2-20/MMBtu globally.
16USD/MMBtuIEA 2020Exchange rate for the IEA biogas cost conversion.
Market range Not applicable.
1.1195USD/EURECB 2019Share of the CHP heat used by the digester itself; caps the heat that can be sold.
Market range No independent range cited.
26%DBFZ Report 32Printed thermal efficiency of 100 kW biogas modules, a reference for the thermal efficiency output.
Market range48%ASUE 2011, Annex BTop printed electrical efficiency of the J416, a reference for the electrical efficiency output.
Market range43.7%Jenbacher J416 pageReference for the electrical efficiency output.
Market range43.7%Jenbacher J620 pageDEA O&M per MWh for a 1-10 MWe biogas engine, a reference for the maintenance output.
Market range No independent range cited.
9.94EUR/MWhDEA Technology Data 06, derivedCross-check of the installed CAPEX per kW.
Market range No independent range cited.
950EUR/kWDEA Technology Data 06DEA variable O&M.
Market range No independent range cited.
7.5EUR/MWhDEA Technology Data 06DEA fixed O&M.
Market range No independent range cited.
9750EUR/MW/yrDEA Technology Data 06Physical service life of the engine plant, with major overhauls inside the maintenance contract.
Market range No independent range cited.
25yearsDEA Technology Data 06Default of the economic lifetime input.
Market range 20 (BMWK) to 25 years (DEA technical).
20yearsBMWK 2024Default of the discount rate input.
Market range No independent range cited.
0.0734ratioENavi 2021, Table 2Default heat price.
Market range No independent range cited.
30EUR/MWhBMWK 2024Default share of heat sold.
Market range No independent range cited.
41.2%DBFZ Report 32Default biogas cost; replace with your own digestion cost.
Market range USD 2-20/MMBtu globally (IEA).
48.8EUR/MWhIEA 2020 + ECB 2019, derivedDefault methane content.
Market range55%FNR 2008Recent module cost escalation, stated so that the 2014 basis is not mistaken for a current price.
Market range +26 % to +44 % (2020 to 2023).
37%BMWK 2024Scope: one spark-ignition lean-burn gas engine CHP module running on raw digester biogas. Biogas in (LHV basis), electricity out at the generator terminals, heat co-produced from jacket water and exhaust. Gas treatment (desulphurisation, drying), the digester, buildings, planning and grid connection are outside the CAPEX. The engine runs at rated output during its running hours: part-load operation is not modelled.
Market range Not applicable.
—Model scope.Electrical efficiency of the size-based case: a log-linear interpolation, 38 % at 100 kW (ASUE) to 43 % at 3 MW (DEA), slope (43 - 38)/ln(30) = 1.47 points per ln unit, capped at 45 %. It is a two-anchor model, not a regression. Against independent datasheets it is conservative: 41.7 % at 1,248 kW where the J416 prints 43.3 % (up to 43.7 %), and 43.2 % at 3,349 kW where the J620 prints 43.7-44.8 %; DEA note A puts a 1 MWe engine at about 38-39 %. Thermal efficiency is 86 % minus electrical (ASUE 100 kW modules and J620 both print about 86 % total).
Market range Not applicable.
—Efficiency model.CAPEX = module cost (ASUE 2014 power law, piecewise by size band: module, controls, remote monitoring, lube oil system, catalyst, silencer, ventilation) plus the ASUE installation add-on (transport to acceptance plus connection and integration, 51 % to 95 % of the module cost by band). The module price alone is an ex-works figure and is shown separately; only the sum is declared installed (battery_limit installed). Planning, building, grid connection and gas treatment are excluded, so project mode, which adds its working layer and contingency on an installed figure, still lacks them. Costs are ASUE 2014 euros, not escalated: BMWK 2024 reports module costs up 26-44 % between 2020 and 2023.
Market range Not applicable.
—CAPEX boundary.Maintenance is a full-service contract price per kWh of electricity, including the major overhaul (due after 30,000-60,000 running hours). The overhaul cost (ASUE 2011, 830.23 x P^-0.268 EUR/kW) is shown for information only and never added. The ASUE law steps up at 1,000 kW (0.95 to 1.13 ct/kWh) because two separate regressions meet there. Insurance and administration add 2.5 % of CAPEX a year (ENavi Annex A).
Market range Not applicable.
—Maintenance model.All costs are constant euros (ASUE 2014, IEA 2020, BMWK 2023 bases, none escalated), so the CAPEX is annualised at a real rate: (1 + nominal WACC)/(1 + 2 %) - 1, i.e. 5.24 % real for the 7.34 % ENavi default. Below 2 % nominal the real rate would turn negative; the CRF then falls back to 1/lifetime. The price years are mixed (2014 CAPEX and maintenance, 2019-2020 biogas, 2023 heat): the LCOE is an order of magnitude to defend, not a dated price.
Market range Not applicable.
—Finance convention.Upstream chaining: the biogas flow in Nm3/h at the stated methane content is the figure to compare with a digester's output (#308 / #309). Project mode prices the biogas inlet on its LHV energy (MWh a year); the biogas cost input is only used by this calculator's own LCOE. The heat credit is internal to the LCOE: project mode sells the heat outlet itself, so do not add both.
Market range Not applicable.
—Chaining rule.