Energy mass balanceCostingEquipment sizingStorage
Gravity energy storage (lifted solid masses in a tower or mine shaft): round-trip efficiency, cycling and LCOS
Solid masses lifted by motor-generators in a tower (Energy Vault EVx) or a mine shaft (Gravitricity), from 1 to 1,000 MWh: lifted mass from E = m g h, LCOS in EUR/MWh returned on PNNL 2022 developer costs or on the Rudong as-built investment, with a sourced-domain indicator.
Open Jack
Founder · OpenJack
- CurrencyEUR 2021
- Battery limitfully financed
- 74 documented assumptions
- Updated2 Nov 2026
Mass and energy balance
What the asset draws and delivers for the case and load you choose.
Reference case
Equivalent full discharges a year you expect to sell. 365 is PNNL's basis (one full cycle a day). The slider stops at 330: below that, at 2 h on the Rudong basis, the LCOS leaves the sourced range. Long durations are also capped by the time a charge plus a discharge takes (PNNL Eq. 2): the cap binds above about 10.7 h at 82 %.
Flows
- In: Electricity for charging—
Asset
Gravity energy storage (lifted solid masses)
- Out: Electricity discharged—
Annual quantities at the current usage. Band width: share of energy in; non-energy flows are not to scale.
Energy returned to the grid per full discharge (MWh). The catalogue binds products here: Energy Vault EVx Rudong is 100 MWh. Rated power = energy / duration. PNNL's cost data start at 40 MWh (its smallest developer point): below that the cost per kWh is held flat, not extrapolated, and the out-of-domain indicator lights up.
- Rated power
- — MW
- Total lifted mass
- — t
- Energy discharged per year
- — MWh/year
- Mass flow at rated power
- — t/s
CAPEX
Specific cost at this size, what backs it, and how it behaves with scale.
Specific CAPEX at this size
—
Reference size 400 MWh
PNNL-33283 Tables 4.31-4.32, power-law form by OpenJack
Model value: the reference case above. Customized: your own all-in quote per kWh of energy capacity, used as is at every size; the value is then no longer sourced.
Log in to view this sensitivity chart.
- Ex-factory
- Installed
- Fully financed· this figure
Included
- Equipment and installation
- Indirect and owner's costs
- Contingency
Not included
- Nothing
Added at project level
- Nothing: project mode uses the figure as is
Lifetime and replacements
Costs this asset carries that project mode does not apply.
Not passed to project mode
Power-equipment replacement part of LCOS is left out of project results: project mode only replaces the whole asset at the end of its lifetime. Add it by hand until it does.
Project figures
Values passed to project mode when this asset is added to a project.
- Electricity for charging in
- —
- Electricity discharged outMain product
- —
- CAPEX to the battery limit
- —
- Fixed O&M
- —
- Variable O&M, excluding feedstocks
- 0 EUR/year
- Asset lifetime
- 35 years
- Power-equipment replacement part of LCOSNot applied by project
- —
Log in to add this asset to a project.
Levelised cost of storage
A standalone indicator for a quick read. Project mode recomputes it for the whole system.
—
- Capital part of LCOS—
- Power-equipment replacement part of LCOS—
- Fixed O&M part of LCOS—
- Charging part of LCOS—
Linked to the balance above
Equivalent full discharges a year you expect to sell. 365 is PNNL's basis (one full cycle a day). The slider stops at 330: below that, at 2 h on the Rudong basis, the LCOS leaves the sourced range. Long durations are also capped by the time a charge plus a discharge takes (PNNL Eq. 2): the cap binds above about 10.7 h at 82 %.
Hours of discharge at rated power. Gravitricity quotes 15 min to 8 h; Rudong is 4 h. PNNL costed 2 h and longer, with a 10 MW / 2-10 h building block: below 2 h the power equipment dominates the cost per kWh and the result is out of the sourced domain.
Average height the masses fall through during a discharge. About 130 m reproduces Rudong (12,600 blocks of 25 t in a tower of about 150 m, derived, not published). Mine shafts: 150 to 1,500 m (PNNL, Gravitricity). Sets the lifted mass only: PNNL's costs are per kWh and per kW, not per tonne or per metre.
Grid-to-grid efficiency of the motor-generators, drives, power electronics and hoist friction over a full cycle. 82 % is PNNL's brick-based estimate; 80-90 % its range for shaft weights; Energy Vault states above 80 % for Rudong. No source splits it by component, so it is an input, not derived.
Average price paid for the charging electricity. Default 25.37 = PNNL's 0.03 USD/kWh at the ECB 2021 rate. Divided by the round-trip efficiency in the LCOS. In project mode the charging electricity is the inlet and is priced by the project.
REAL rate, because every cost is in constant money without escalation. Default 6.52 % = PNNL real WACC. Never enter a nominal rate here. The slider is kept narrow (6-7 %) so that every corner of the inputs stays inside the sourced LCOS range of 50-320 EUR/MWh.
Period over which the CAPEX is annualised. 35 years is Energy Vault's stated operating life for Rudong and the low end of PNNL's 35-50 year calendar life; 20 years is PNNL's economic-life convention. Above 30 years one power-equipment replacement is costed (PNNL Table 6.5).
Log in to view this sensitivity chart.
Benchmarks
This model's figures against published references and reference cases.
Levelised cost of storage, EUR/MWh
109.9 PNNL-33283
Specific CAPEX, EUR/kWh
304.4 PNNL-33283
426.1 PNNL-33283
827.1 Nantong government
Round-trip efficiency, %
80 Energy Vault
82 PNNL-33283
86 PNNL-33283
Reference cases at this size and usage
Log in to compare the reference cases.
All results
Every model output at the current settings, grouped, with the sensitivity charts.
66 outputs · 7 groups · 14 also shown above, dimmed
Levelised cost
8- Capital share of LCOS
- Computing%
- LCOS at PNNL's 20-year economic life
- ComputingEUR/MWh
- Total annual cost
- ComputingEUR/year
Size and CAPEX
14- CAPEX per kW
- ComputingEUR/kW
- Scaled PNNL CAPEX
- ComputingEUR/kWh
- PNNL CAPEX at the reference size
- ComputingEUR/kWh
- Rudong as-built CAPEX
- ComputingEUR/kWh
- Size factor
- Computingratio
- Masses, structure and balance of system
- ComputingEUR
- Motor-generators and power conversion
- ComputingEUR
- EPC, development and grid integration
- ComputingEUR
- Energy share of direct cost
- Computing%
- Out of sourced domain
- Computingflag
- Rudong basis extrapolated
- Computingflag
Masses and height
10- Lifted mass per MWh
- Computingt/MWh
- Gravitational energy stored
- ComputingMWh
- Energy per tonne-metre
- ComputingWh/(t·m)
- Equivalent 25 t blocks
- Computingblocks
- Blocks lowered per hour
- Computingblocks/h
- Rudong block mass
- Computingt
- Rudong implied drop height (derived)
- Computingm
- Rudong drop over tower height (derived)
- Computing%
Energy balance
7- One-way efficiency (assumed split)
- Computing%
- Charging energy per MWh returned
- ComputingMWh/MWh
- Energy charged per year
- ComputingMWh/year
- Energy discharged over the economic life
- ComputingMWh
Duty cycle
8- Effective full cycles a year
- Computingcycles/year
- Maximum full cycles a year
- Computingcycles/year
- Cycle-time load penalty
- Computing%
- Charge plus discharge time
- Computingh
- Cycles counted the PNNL way
- Computingcycles/year
- Discharge load hours
- Computingh/year
- Charging load hours
- Computingh/year
- Discharge capacity factor
- Computing%
Finance and yearly costs
12- Capital recovery factor
- Computing1/year
- Capital recovery factor at 20 years
- Computing1/year
- Annualised CAPEX
- ComputingEUR/year
- Power-equipment replacement cost
- ComputingEUR
- Power-equipment replacements
- Computingcount
- Replacement present value
- ComputingEUR
- Annualised replacement
- ComputingEUR/year
- Fixed O&M (PNNL table)
- ComputingUSD/kW/year
- Fixed O&M per kW
- ComputingEUR/kW/year
- Charging cost per year
- ComputingEUR/year
- Interest during construction (not in LCOS)
- Computing%
Reference checks
7- Check: PNNL 100 MW / 4 h
- Computingratio
- Check: PNNL 100 MW / 2 h
- Computingratio
- Check: scale law vs PNNL power cost at 10x
- Computingratio
- Check: scale law vs PNNL energy cost at 10x
- Computingratio
- Rudong over PNNL CAPEX (nominal)
- Computingratio
- PNNL charging price
- ComputingEUR/MWh
- Rate gap to PNNL
- Computing%
Sensitivities
6 chartsLog in to view this sensitivity chart.
Log in to view this sensitivity chart.
Log in to view this sensitivity chart.
Log in to view this sensitivity chart.
Log in to view this sensitivity chart.
Log in to view this sensitivity chart.
Sources
74 documented assumptions · 6 sources
- sandia.govPNNL-33283, 2022 Grid Energy Storage Technology Cost and Performance Assessment (Viswanathan et al.)gravitational storage §4.7 (costs Tables 4.31-4.33, O&M Table 4.35, performance Table 4.36), LCOS method §6 Eq. 1-2, WACC and charging price Table 6.1, replacement Table 6.5
- energyvault.comEnergy Vault, Rudong project page25 MW / 100 MWh EVx, 4 h, round-trip efficiency above 80 %, 35-year operating life, no self-discharge
- energyvault.comEnergy Vault / China Tianying press release (CCTV)Rudong Power Bank about 150 m tall, 12,600 blocks of 25 t
- en.nantong.gov.cnNantong municipal government, 2024-06-21Rudong total investment 650 M CNY (89.52 M USD), 26 MW / 100 MWh
- physics.nist.govNIST CODATAstandard acceleration of gravity 9.80665 m/s2
- data-api.ecb.europa.euECB reference exchange rate USD/EUR, annual averages 2021 (1.18274) and 2024 (1.08238)
About
Calculator context
About
Calculator context
Gravity energy storage: solid masses, composite blocks stacked in a tower (Energy Vault EVx) or weights hung in a mine shaft (Gravitricity), are lifted by motor-generators when power is cheap and lowered to generate when it is needed. The calculator sizes the plant by its energy capacity (MWh, the key the catalogue binds to, shared with the LFP battery calculator) and its duration, and answers what a MWh returned to the grid costs and how much mass and height it takes.
Physics. One tonne raised one metre stores 2.724 Wh (E = m g h, g = 9.80665 m/s2). The lifted mass is the energy returned divided by the discharge-side efficiency, divided by 2.724 Wh per t·m times the useful drop. The discharge-side efficiency is taken as the square root of the round-trip efficiency, an assumption: no source splits it. At 100 MWh and 130 m the model needs about 312,000 t; Rudong reports 12,600 blocks of 25 t (315,000 t) in a tower about 150 m tall, which implies an average useful drop of about 129 m at 82 % (derived, not published). In a 1,500 m shaft the mass per MWh falls to about 260 t. There is no self-discharge and no fade with cycling (PNNL Table 4.36; Energy Vault), so the full capacity is returned every cycle for the whole life.
Efficiency. The round-trip efficiency is an input, 80-90 %, default 82 % (PNNL's brick estimate; 80-90 % for shafts; Energy Vault states above 80 % for Rudong). No source publishes the motor-generator, drive and friction losses separately, so the model does not derive it.
CAPEX. Two sourced reference cases. PNNL-33283 (2022), whose heavy-brick figures are Energy Vault's own developer cost data: 180 USD/kWh for the masses, structure and balance of system plus 480 USD/kW for the power equipment, plus 20 % for EPC, project development and grid integration, in 2021 dollars converted at the ECB 2021 rate. This reproduces PNNL's printed totals exactly (360 USD/kWh at 100 MW / 4 h, 504 at 2 h). PNNL reduces costs by about 3 % per decade of size; the model writes that as a power law of exponent 0.9868 applied above 400 MWh, which also reproduces PNNL's 1,000 MW power cost to 0.1 %. Below 400 MWh the cost is flat, as in PNNL. The second case is Rudong as built: 650 M CNY (89.52 M USD) for 100 MWh, about 827 EUR/kWh in 2024 euros, held flat at every size and duration. It is about 2.7 times the PNNL developer figure: the first plant of its kind cost far more than the developer data suggest, and the page says so rather than averaging the two. The Rudong figure is not deflated to 2021 money (no cited index), so it reads as an upper reference. A Customized option takes your own quote.
Domain. PNNL costed 2 h and longer, from a 40 MWh developer point up to 1,000 MW. Below 2 h or 40 MWh, or above 1,000 MW, the model still computes but an out-of-domain indicator is on: below 2 h the power cost per kWh grows steeply (about 2,130 EUR/kWh at 15 minutes). On the Rudong basis a second indicator says when the single point is used away from 100 MWh / 4 h.
LCOS. PNNL Eq. 1 with a capital recovery factor at the real rate and no taxes: annualised CAPEX, the power-equipment replacement PNNL schedules every 30 years (costed when the economic life exceeds 30 years), and PNNL's heavy-brick fixed O&M (8-22 USD/kW-yr over 2-10 h, interpolated), per MWh returned, plus the charging price divided by the round-trip efficiency. Annual energy follows PNNL Eq. 2: up to 365 full cycles, capped when a charge plus a discharge no longer fit in a day (above about 10.7 h at 82 %). With PNNL's 6.52 % real WACC, 30 USD/MWh charging and 35 years, 100 MWh / 4 h costs about 304 EUR/kWh and about 102.6 EUR/MWh (113.7 at PNNL's 20-year economic life); on the Rudong basis about 207.5 EUR/MWh. PNNL itself prints 0.13 USD/kWh (about 110 EUR/MWh, after tax, at 1,000 MW / 10 h, a size beyond this slider). Comparable with the LFP battery calculator: same energy key, same charging convention, same PNNL WACC. Interest during construction is not added (an indicative uplift is shown).
Model
153 variables — inputs, calculations and outputs, with their dependencies.
Model
153 variables — inputs, calculations and outputs, with their dependencies.
| Variable | Value | Unit | Depends on |
|---|---|---|---|
| 100 | MWh | — | |
| 4 | h | — | |
| 130 | m | — | |
| 82 | % | — | |
| 365 | cycles/year | — | |
| 1 | — | — | |
| 0 | — | — | |
| 305 | EUR/kWh | — | |
| 25.37 | EUR/MWh | — | |
| 6.52 | % | — | |
| 35 | years | — |
| Variable | Formula | Unit | Depends on |
|---|---|---|---|
if((<=)+(<=)+(<=)+(>)+(<=)+(>)+(<=)+(>)+(<)+(>)+(<)+(>)+(<=)+(<)+(<)+(<)+(>)>0,1,0) | bool | ||
* | kW | ||
* | ratio | ||
* | ratio | ||
* | ratio | ||
*min(/,/max(,)) | cycles/year | ||
max(,) | MWh | ||
+* | ratio | ||
if(==,,) | EUR/kWh | ||
* | ratio |
| Variable | Formula | Unit | Depends on |
|---|---|---|---|
/max(,) | MW | ||
| % | ||
sqrt()* | % | ||
/max(,) | MWh/MWh | ||
*/ | Wh/(t·m) | ||
/max(,) | MWh | ||
*/max(*,) | t | ||
/max(,) | t/MWh | ||
/max(*,) | t/s | ||
/ | blocks | ||
/max(,) | blocks/h | ||
* | t | ||
*/max(**,) | m | ||
/* | % | ||
**(+) | h | ||
* | cycles/year | ||
min(,) | cycles/year | ||
(-/max(,))* | % | ||
/ | cycles/year | ||
* | h/year | ||
* | h/year | ||
/* | % | ||
* | MWh/year | ||
* | MWh/year | ||
- | MWh/year | ||
* | MWh | ||
(/)^(-) | ratio | ||
*(+/max(,))/ | EUR/kWh | ||
clamp(*(/)^(-),,) | EUR/kWh | ||
*/(*)/ | EUR/kWh | ||
if(>=,,) | EUR/kWh | ||
** | EUR | ||
/max(,) | EUR/kW | ||
/max(+/max(,),)* | % | ||
*(-)/ | EUR | ||
(-)** | EUR | ||
-- | EUR | ||
if(<,/,(*(+)^)/max((+)^-,)) | 1/year | ||
* | EUR/year | ||
***/ | EUR | ||
if(>,,) | count | ||
**(+)^(-) | EUR | ||
* | EUR/year | ||
if(<=,,if(<=,+(-)*(-)/(-),if(<=,+(-)*(-)/(-),if(<=,+(-)*(-)/(-),if(<=,+(-)*(-)/(-),+(min(,)-)*(-)/(-)))))) | USD/kW/year | ||
/ | EUR/kW/year | ||
* | EUR/year | ||
* | EUR/year | ||
+++ | EUR/year | ||
/max(,) | EUR/MWh | ||
/max(,) | EUR/MWh | ||
/max(,) | EUR/MWh | ||
* | EUR/MWh | ||
+++ | EUR/MWh | ||
/max(,)* | % | ||
if(<,/,(*(+)^)/max((+)^-,)) | 1/year | ||
(*+)/max(,)+ | EUR/MWh | ||
((+)^(*)-)* | % | ||
if((<)+(<)+(>)+(<)+(>)>0,1,0) | flag | ||
if((==)*(<)*((abs(-)>)+(abs(-)>))>0,1,0) | flag | ||
*(+/)/ | ratio | ||
*(+/)/ | ratio | ||
*(/)^(-)/ | ratio | ||
*(/)^(-)/ | ratio | ||
*/(*)/ | ratio | ||
/ | EUR/MWh | ||
- | % |
Assumptions
74 assumptions used in the calculations
Assumptions
74 assumptions used in the calculations
Zero term in guards and in the negative exponent of the replacement discount.
Market range Exact, no range.
0Unit conversionUnit term in the CRF, guards and multipliers.
Market range Exact, no range.
1Unit conversionPercent (0-100) to fraction.
Market range Exact, no range.
0.011/%Unit conversionFraction to percent; also the upper guard of 100 % on the efficiency.
Market range Exact, no range.
100%Unit conversionMW to kW.
Market range Exact, no range.
1000kW/MWUnit conversionTonnes to kilograms in the energy per tonne-metre.
Market range Exact, no range.
1000kg/tUnit conversionHours in a day, PNNL Eq. 2 cycle limit.
Market range Exact, no range.
24h/dayUnit conversionMWh to Wh for the lifted mass.
Market range Exact, no range.
1000000Wh/MWhUnit conversionMillion USD to USD for the Rudong investment.
Market range Exact, no range.
1000000USD/MUSDUnit conversionMid-construction convention for the indicative IDC uplift.
Market range No independent range cited.
0.5OpenJack conventionReference case 1: PNNL-33283 heavy-brick costs.
Market range Not applicable.
1OpenJack DSL conventionReference case 2: Energy Vault EVx Rudong as built.
Market range Not applicable.
2OpenJack DSL conventionE = m g h.
Market range Exact, no range.
9.80665m/s2NIST CODATAStorage block (masses, structure) and balance of system per kWh.
Market range 180 (<= 400 MWh) to 175 USD/kWh (> 400 MWh), PNNL Table 4.32.
180USD/kWhPNNL-33283Check of the scale law at PNNL's large size.
Market range Single PNNL value.
175USD/kWhPNNL-33283Power equipment per kW at 100 MW.
Market range 480 (100 MW) to 466 USD/kW (1,000 MW).
480USD/kWPNNL-33283Check of the scale law on power.
Market range Single PNNL value.
466USD/kWPNNL-33283Exponent of the CAPEX scale law on energy capacity, the size the catalogue binds to.
Market range -3 % per decade of size (PNNL).
0.986772PNNL-33283 Tables 4.31-4.32, power-law form by OpenJackReference size of the scale law.
Market range Not applicable.
400MWhPNNL-33283One decade above the reference size.
Market range Not applicable.
4000MWhPNNL-33283Indirect costs on top of the direct costs.
Market range Single PNNL value.
20%PNNL-33283Cross-check of the CAPEX reconstruction.
Market range 504 (2 h) and 360 (4 h) USD/kWh at 100 MW.
360USD/kWhPNNL-33283Cross-check of the CAPEX reconstruction.
Market range 504 (2 h) and 360 (4 h) USD/kWh at 100 MW.
504USD/kWhPNNL-33283Duration of the 360 USD/kWh check.
Market range Not applicable.
4hPNNL-33283Duration of the 504 USD/kWh check.
Market range Not applicable.
2hPNNL-33283Numerical guard of the scale law.
Market range Not applicable.
100EUR/kWhOpenJackNumerical guard of the scale law.
Market range Not applicable.
3000EUR/kWhOpenJackInterpolation knot of the O&M table.
Market range Not applicable.
2hPNNL-33283Interpolation knot of the O&M table.
Market range Not applicable.
4hPNNL-33283Interpolation knot of the O&M table.
Market range Not applicable.
6hPNNL-33283Interpolation knot of the O&M table.
Market range Not applicable.
8hPNNL-33283Interpolation knot of the O&M table.
Market range Not applicable.
10hPNNL-33283Interpolation knot of the O&M table.
Market range Not applicable.
24hPNNL-33283Fixed O&M of a heavy-brick plant.
Market range8USD/kW/yearPNNL-33283Fixed O&M of a heavy-brick plant.
Market range12USD/kW/yearPNNL-33283Fixed O&M of a heavy-brick plant.
Market range15USD/kW/yearPNNL-33283Fixed O&M of a heavy-brick plant.
Market range19USD/kW/yearPNNL-33283Fixed O&M of a heavy-brick plant.
Market range22USD/kW/yearPNNL-33283Fixed O&M of a heavy-brick plant.
Market range47USD/kW/yearPNNL-33283Lower end of the sourced efficiency range.
Market range80%PNNL-33283Upper end of the sourced efficiency range.
Market range90%PNNL-33283Longest sourced calendar life.
Market range50yearsPNNL-33283Year of the single power-equipment replacement.
Market range Single PNNL value.
30yearsPNNL-33283PNNL's economic-life convention.
Market range Single PNNL value.
20yearsPNNL-33283Cap on full cycles a year.
Market range Single PNNL value.
365cycles/yearPNNL-33283PNNL counting convention.
Market range Single PNNL value.
80%PNNL-33283Construction time for the indicative IDC output.
Market range Single PNNL value.
3yearsPNNL-33283Lower duration of the sourced domain.
Market range2hPNNL-33283Smallest sourced size.
Market range40MWhPNNL-33283Largest sourced power.
Market range1000MWPNNL-33283Deepest sourced drop.
Market range1500mPNNL-33283Energy of the Rudong reference plant.
Market range Single plant.
100MWhEnergy VaultDuration of the Rudong plant.
Market range Single plant.
4hEnergy VaultAll-in investment of the Rudong plant.
Market range Single plant: 650 M CNY = 89.52 M USD.
89.52MUSDNantong government via China Daily regionalBlock count of Rudong.
Market range Single plant.
12600blocksEnergy Vault / CNTY press releaseMass of one Rudong block, also used to count equivalent blocks.
Market range Single plant.
25tEnergy Vault / CNTY press releaseHeight of the Rudong structure.
Market range About 150 m.
150mEnergy Vault / CNTY press releaseConverts PNNL costs to EUR 2021.
Market range Single value.
1.18274USD/EURECBConverts the Rudong investment to EUR 2024.
Market range Single value.
1.08238USD/EURECBPNNL's charging price.
Market range Single PNNL value.
30USD/MWhPNNL-33283PNNL's real cost of capital.
Market range Single PNNL value.
6.52%PNNL-33283Reference efficiency for bricks.
Market range82%PNNL-33283Reference efficiency for shafts.
Market range86%PNNL-33283Reference efficiency for Rudong.
Market range Above 80 %.
80%Energy VaultExternal reference on the LCOS ruler.
Market range109.92EUR/MWhPNNL-33283External reference on the CAPEX ruler.
Market range 426 (2 h) to 304 (4 h) EUR/kWh at 100 MW.
304.38EUR/kWhPNNL-33283External reference on the CAPEX ruler.
Market range 426 (2 h) to 304 (4 h) EUR/kWh at 100 MW.
426.13EUR/kWhPNNL-33283External reference on the CAPEX ruler.
Market range Single plant.
827.07EUR/kWhNantong governmentLevelised cost per MWh returned to the grid; the charging electricity is an input cost divided by the round-trip efficiency.
Market range Not applicable.
—PNNL-33283 Eq. 1Real or nominal: real.
Market range Not applicable.
—Scope noteSizes the mass for the energy actually returned.
Market range No independent range cited.
—OpenJack assumptionFull capacity returned every cycle for the whole life.
Market range Not applicable.
—PNNL-33283 / Energy VaultOne cost basis for towers and shafts.
Market range No independent range cited.
—Scope noteO&M independent of the CAPEX basis.
Market range No independent range cited.
—Scope note