Energy mass balanceCostingEquipment sizingHydro
Run-of-river low-head hydropower plant (Kaplan / bulb)
Low-head run-of-river plant (6-30 m) with Kaplan or bulb turbines: site flow-duration curve, residual flow and part-load efficiency give energy and capacity factor; ORNL capital, licensing and O&M costs in EUR2014 give the LCOE.
- CurrencyEUR 2014
- Battery limitinstalled
- 105 documented assumptions
- Updated27 Oct 2026
Mass and energy balance
What the asset draws and delivers for the case and load you choose.
Reference case
Percent of the year during which the available flow (river flow minus residual flow) reaches the design flow: the sizing decision against the river, and the lever that sets the capacity factor (Q20 about 37 %, Q50 about 61 % on the default curve). 30 % (Q30) is the ORNL/Reclamation rule of thumb for the best installed capacity per dollar. At a fixed installed capacity, moving it changes the river the plant needs: the implied median flow Q50 goes from about 45 m3/s at Q20 to about 157 m3/s at Q50 (10 MW, 10 m).
Flows
Asset
Run-of-river low-head hydropower plant
- Out: Electricity (busbar)—
Annual quantities at the current usage. Band width: share of energy in; non-energy flows are not to scale.
Electrical capacity at the plant busbar after generator and transformer losses. It sets the design flow through the head and the water-to-wire efficiency. The ORNL cost equations are refused below 3 MW (NSD and O&M validity floor); for an existing-weir (NPD) site the ORNL equation stops at 105 MW.
- Design flow
- — m3/s
- Implied median river flow (Q50)
- — m3/s
- Annual energy
- — MWh/year
- Average electrical output
- — MW
CAPEX
Specific cost at this size, what backs it, and how it behaves with scale.
Specific CAPEX at this size
—
Reference size 10 MW
ORNL Eq. 2
Model value = the ORNL equation of the selected case, scaled with capacity and head. Customized = your own quote per kW, used as entered at every capacity and head (no capacity law, no head term, no clamp). The figure is then no longer sourced.
Log in to view this sensitivity chart.
- Ex-factory
- Installed· this figure
- Fully financed
Included
- Equipment
- Installation, civil works and engineering
Not included
- Working capital
- Contingency
Added at project level
- Working capital layer, from the project settings
- Contingency, from the project settings
Project figures
Values passed to project mode when this asset is added to a project.
Run-of-river low-head hydropower plantConcept sketch, not to scale · drag to rotate
- Electricity (busbar) outMain product
- —
- CAPEX to the battery limit
- —
- Fixed O&M
- —
- Variable O&M, excluding feedstocks
- 0 EUR/year
- Asset lifetime
- 40 years
Log in to add this asset to a project.
Levelised cost of electricity
A standalone indicator for a quick read. Project mode recomputes it for the whole system.
—
- LCOE: ICC component—
- LCOE: licensing component—
- LCOE: O&M component—
Linked to the balance above
Percent of the year during which the available flow (river flow minus residual flow) reaches the design flow: the sizing decision against the river, and the lever that sets the capacity factor (Q20 about 37 %, Q50 about 61 % on the default curve). 30 % (Q30) is the ORNL/Reclamation rule of thumb for the best installed capacity per dollar. At a fixed installed capacity, moving it changes the river the plant needs: the implied median flow Q50 goes from about 45 m3/s at Q20 to about 157 m3/s at Q50 (10 MW, 10 m).
Headwater minus tailwater level at design conditions. The slider starts at 6 m because the ORNL new-development cost equation is fitted on 19.3 ft (5.9 m) and above; the tailwater rise during floods is not modelled.
Flow left in the river and never turbined, as a multiple of the flow exceeded 95 % of the time. 1 x Q95 is the UK starting point quoted by ESHA. The French/Portuguese rule (10 % of the mean flow) cannot be computed from a flow-duration curve whose top is open.
Sets the peak turbine efficiency (ESHA Table 6.7). The part-load curve shape is RETScreen's Kaplan curve in both cases; a single-regulated machine in practice also has a narrower operating range, which is not modelled.
ORNL licensing equations (INL 2003 escalated to 2014$), which ORNL calls order-of-magnitude estimates. They are a development cost outside the ICC. When included, they are part of the total capital cost exported to the project CAPEX field.
Real weighted average cost of capital applied to constant 2014 EUR. 0.062 is the ORNL LCOE basis. Costs are not escalated, so a nominal rate would be inconsistent.
Annuity period for the capital cost in this calculator. 20 years is the ORNL LCOE basis; civil works physically last much longer, so a longer period lowers the LCOE. The project mode receives a 40-year service life instead (IRENA: 40 years or more for electro-mechanical equipment, 50-100 years for civil works).
Flow exceeded 20 % of the time, divided by the median flow Q50. The turbine is assumed to run at design flow for at least the wettest 20 % of the year. Enter the site flow-duration curve (5 % steps, as in RETScreen). The default is the ESHA example curve, a flashy small stream: illustrative only. The curve must not increase with duration; the slider band is the ESHA shape raised to the power 0.75 (flatter) to 1.2 (flashier).
Flow exceeded 25 % of the time, divided by the median flow Q50. Enter the site flow-duration curve (5 % steps, as in RETScreen). The default is the ESHA example curve, a flashy small stream: illustrative only. The curve must not increase with duration; the slider band is the ESHA shape raised to the power 0.75 (flatter) to 1.2 (flashier).
Flow exceeded 30 % of the time, divided by the median flow Q50. Enter the site flow-duration curve (5 % steps, as in RETScreen). The default is the ESHA example curve, a flashy small stream: illustrative only. The curve must not increase with duration; the slider band is the ESHA shape raised to the power 0.75 (flatter) to 1.2 (flashier).
Flow exceeded 35 % of the time, divided by the median flow Q50. Enter the site flow-duration curve (5 % steps, as in RETScreen). The default is the ESHA example curve, a flashy small stream: illustrative only. The curve must not increase with duration; the slider band is the ESHA shape raised to the power 0.75 (flatter) to 1.2 (flashier).
Flow exceeded 40 % of the time, divided by the median flow Q50. Enter the site flow-duration curve (5 % steps, as in RETScreen). The default is the ESHA example curve, a flashy small stream: illustrative only. The curve must not increase with duration; the slider band is the ESHA shape raised to the power 0.75 (flatter) to 1.2 (flashier).
Flow exceeded 45 % of the time, divided by the median flow Q50. Enter the site flow-duration curve (5 % steps, as in RETScreen). The default is the ESHA example curve, a flashy small stream: illustrative only. The curve must not increase with duration; the slider band is the ESHA shape raised to the power 0.75 (flatter) to 1.2 (flashier).
Flow exceeded 55 % of the time, divided by the median flow Q50. Enter the site flow-duration curve (5 % steps, as in RETScreen). The default is the ESHA example curve, a flashy small stream: illustrative only. The curve must not increase with duration; the slider band is the ESHA shape raised to the power 0.75 (flatter) to 1.2 (flashier).
Flow exceeded 60 % of the time, divided by the median flow Q50. Enter the site flow-duration curve (5 % steps, as in RETScreen). The default is the ESHA example curve, a flashy small stream: illustrative only. The curve must not increase with duration; the slider band is the ESHA shape raised to the power 0.75 (flatter) to 1.2 (flashier).
Flow exceeded 65 % of the time, divided by the median flow Q50. Enter the site flow-duration curve (5 % steps, as in RETScreen). The default is the ESHA example curve, a flashy small stream: illustrative only. The curve must not increase with duration; the slider band is the ESHA shape raised to the power 0.75 (flatter) to 1.2 (flashier).
Flow exceeded 70 % of the time, divided by the median flow Q50. Enter the site flow-duration curve (5 % steps, as in RETScreen). The default is the ESHA example curve, a flashy small stream: illustrative only. The curve must not increase with duration; the slider band is the ESHA shape raised to the power 0.75 (flatter) to 1.2 (flashier).
Flow exceeded 75 % of the time, divided by the median flow Q50. Enter the site flow-duration curve (5 % steps, as in RETScreen). The default is the ESHA example curve, a flashy small stream: illustrative only. The curve must not increase with duration; the slider band is the ESHA shape raised to the power 0.75 (flatter) to 1.2 (flashier).
Flow exceeded 80 % of the time, divided by the median flow Q50. Enter the site flow-duration curve (5 % steps, as in RETScreen). The default is the ESHA example curve, a flashy small stream: illustrative only. The curve must not increase with duration; the slider band is the ESHA shape raised to the power 0.75 (flatter) to 1.2 (flashier).
Flow exceeded 85 % of the time, divided by the median flow Q50. Enter the site flow-duration curve (5 % steps, as in RETScreen). The default is the ESHA example curve, a flashy small stream: illustrative only. The curve must not increase with duration; the slider band is the ESHA shape raised to the power 0.75 (flatter) to 1.2 (flashier).
Flow exceeded 90 % of the time, divided by the median flow Q50. Enter the site flow-duration curve (5 % steps, as in RETScreen). The default is the ESHA example curve, a flashy small stream: illustrative only. The curve must not increase with duration; the slider band is the ESHA shape raised to the power 0.75 (flatter) to 1.2 (flashier).
Flow exceeded 95 % of the time (Q95) divided by Q50. It also sets the residual flow. Enter the site flow-duration curve (5 % steps, as in RETScreen). The default is the ESHA example curve, a flashy small stream: illustrative only. The curve must not increase with duration; the slider band is the ESHA shape raised to the power 0.75 (flatter) to 1.2 (flashier).
Lowest flow of the curve (exceeded 100 % of the time) divided by Q50. Enter the site flow-duration curve (5 % steps, as in RETScreen). The default is the ESHA example curve, a flashy small stream: illustrative only. The curve must not increase with duration; the slider band is the ESHA shape raised to the power 0.75 (flatter) to 1.2 (flashier).
Log in to view this sensitivity chart.
Benchmarks
This model's figures against published references and reference cases.
Retained ICC per kW, EUR/kW
1,882 ORNL section 3.1
3,011 ORNL section 3.1
4,140 ORNL section 3.1
4,893 ORNL section 3.1
LCOE in USD2014, USD/MWh
80 ORNL §6.2
100 ORNL §6.2
200 ORNL §6.2
210 ORNL §6.2
Reference cases at this size and usage
Log in to compare the reference cases.
All results
Every model output at the current settings, grouped, with the sensitivity charts.
57 outputs · 5 groups · 13 also shown above, dimmed
Hydrology and design flow
9- Implied Q95 flow
- Computingm3/s
- Residual (ecological) flow
- Computingm3/s
- Minimum technical flow
- Computingm3/s
- Best-efficiency flow
- Computingm3/s
- Design flow / median flow
- Computingratio
- Net head at design flow
- Computingm
- Gross head in feet
- Computingft
Turbine and efficiency
5- Peak turbine efficiency
- Computing%
- Turbine efficiency at design flow
- Computing%
- Water-to-wire efficiency at design
- Computing%
- Part-load and head-loss penalty
- Computingratio
- Energy lost to part load and head loss
- Computing%
Energy
9- Capacity factor
- Computing%
- Equivalent full-load hours
- Computingh/year
- Power-duration integral (before availability)
- Computing%
- Turbined flow integral
- Computing%
- Annual turbined volume
- Computinghm3/year
- Specific water use
- Computingm3/kWh
Costs
26- Model ICC per kW
- ComputingEUR/kW
- Case ICC per kW at the reference size
- ComputingEUR/kW
- Capacity scale factor
- Computingratio
- Initial capital cost per kW
- ComputingEUR/kW
- Retained ICC per kW (USD2014)
- ComputingUSD/kW
- Initial capital cost (ICC)
- ComputingEUR
- Civil works
- ComputingEUR
- Electro-mechanical equipment
- ComputingEUR
- Electrical infrastructure
- ComputingEUR
- Engineering and construction management
- ComputingEUR
- Civil works per kW
- ComputingEUR/kW
- Electro-mechanical per kW
- ComputingEUR/kW
- Licensing and permitting
- ComputingEUR
- Total capital cost per kW
- ComputingEUR/kW
- Capital recovery factor
- Computing1/year
- Annualised capital cost
- ComputingEUR/year
- O&M as share of ICC
- Computing%
- O&M per kW-year
- ComputingEUR/kW/year
- Total annual cost
- ComputingEUR/year
ORNL references
8- ORNL low-head LCOE band, low end
- ComputingUSD/MWh
- ORNL low-head LCOE band, high end
- ComputingUSD/MWh
- Position of the LCOE in the ORNL band
- Computing%
- Historical ICC reference, low
- ComputingEUR/kW
- Historical ICC reference, high
- ComputingEUR/kW
- Model ICC per kW, ORNL low uncertainty
- ComputingEUR/kW
- Model ICC per kW, ORNL high uncertainty
- ComputingEUR/kW
Sensitivities
5 chartsLog in to view this sensitivity chart.
Log in to view this sensitivity chart.
Log in to view this sensitivity chart.
Log in to view this sensitivity chart.
Log in to view this sensitivity chart.
Sources
105 documented assumptions · 8 sources
- unfccc.intRETScreen Engineering & Cases Textbook, Small Hydro Project Analysis (NRCan)FDC energy method, Kaplan efficiency curve, hydraulic losses
- canyonhydro.comESHA (2004) Guide on how to develop a small hydropower plant, Part 1example FDC, strip method, minimum technical flow
- canyonhydro.comESHA (2004) Guide, Part 2turbine and generator efficiencies, reserved (residual) flow rules
- info.ornl.govO'Connor et al. (2015) Hydropower Baseline Cost Modeling v2, ORNL/TM-2015/471ICC, licensing, O&M, LCOE bands (2014$)
- osti.govKao et al. (2014) New Stream-reach Development assessment, ORNL/TM-2013/514Q30 design flow, NSD capacity factors
- atb.nlr.govNREL Annual Technology Baseline 2024, Hydropowerrepresentative plant capacity factors
- bundesbank.deDeutsche Bundesbank / ECB reference ratesUSD per EUR annual average 2014 = 1.3285
- grass.osgeo.orgGRASS GIS r.green.hydro.technicaltransformer efficiency default 0.99
About
Calculator context
About
Calculator context
Screening techno-economics of a run-of-river hydropower plant at low head (6-30 m) with Kaplan or bulb turbines, no storage. The installed capacity is the input; the calculator returns the design flow, the river flow the plant needs, annual energy, capacity factor, capital cost with its civil / electro-mechanical split, O&M and the LCOE.
Energy follows the RETScreen Small Hydro method (eq. 3, 7, 8, 10-12, 19) and the ESHA strip method. The site flow-duration curve (FDC) is entered at 5 % steps as multiples of the median flow. The design flow is the flow available at the design exceedance (default Q30, the ORNL/Reclamation rule of thumb) after the residual flow (default 1 x Q95, the UK starting point quoted by ESHA). At each point the turbine takes the available flow up to the design flow and stops below 15 % of it. The RETScreen Kaplan curve (best efficiency at 75 % of design flow) is scaled to a 93 % peak (ESHA, double regulated). Hydraulic losses grow with the square of the flow (5 % at design), and the generator (97 %) and transformer (99 %) losses are applied. The power-duration curve is integrated with the trapezoidal rule and multiplied by 93 % availability (ORNL from NERC GADS).
At 10 MW and 10 m the design flow is 120.7 m3/s and the implied median river flow 65.0 m3/s. On the default curve the capacity factor is 44.9 %. The default curve is the ESHA example, a one-year record from a small, flashy stream. Large lowland rivers have flatter curves and reach 0.62-0.67 (NREL ATB bulb-Kaplan plants). Enter the site curve. The tailwater rise during floods and parasitic loads are not modelled, and the plant is treated as one equivalent unit.
Costs are the ORNL Baseline Cost Model v2 (ORNL/TM-2015/471) in 2014$: initial capital cost (construction, equipment, engineering and construction management) for two reference cases, a new weir (NSD) or an existing weir whose dam cost is not included (NPD), scaled with capacity as (P / 10 MW)^(e - 1) around the case value; a Customized quote per kW can replace the model value, licensing (optional, order-of-magnitude), and O&M as the lesser of 225,417 P^0.547 and 2.5 % of ICC. All figures are converted to EUR2014 at the ECB 2014 average of 1.3285 USD/EUR. This is a currency conversion only, with no US-to-Europe location factor. At the default the ICC is 4,417 EUR2014/kW. ORNL states that site costs can fall between -50 % and +100 % of the parametric prediction, and the calculator shows that band. The LCOE uses a real annuity (default 6.2 % real, 20 years, the ORNL basis) on constant 2014 EUR. It comes to 123.0 EUR2014/MWh, or 163.4 USD2014/MWh, which sits inside ORNL's low-head NSD band of 100-210 USD2014/MWh at the default; a Customized CAPEX or other corners can leave the band. The project receives the total capital cost (ICC plus licensing per the selected option) as an installed CAPEX, the fixed O&M, an hourly electricity outlet in MW and a 40-year service life (IRENA: 40 years or more for electro-mechanical equipment).
Model
209 variables — inputs, calculations and outputs, with their dependencies.
Model
209 variables — inputs, calculations and outputs, with their dependencies.
| Variable | Value | Unit | Depends on |
|---|---|---|---|
| 10 | MW | — | |
| 10 | m | — | |
| 30 | % | — | |
| 1 | x Q95 | — | |
| 1 | — | — | |
| 1 | — | — | |
| 0 | — | — | |
| 4417 | EUR/kW | — | |
| 2 | — | — | |
| 0.062 | ratio | — | |
| 20 | years | — | |
| 2.93 | ratio | — | |
| 2.47 | ratio | — | |
| 2.087 | ratio | — | |
| 1.761 | ratio | — | |
| 1.455 | ratio | — | |
| 1.227 | ratio | — | |
| 0.86 | ratio | — | |
| 0.725 | ratio | — | |
| 0.613 | ratio | — | |
| 0.5 | ratio | — | |
| 0.446 | ratio | — | |
| 0.392 | ratio | — | |
| 0.338 | ratio | — | |
| 0.283 | ratio | — | |
| 0.229 | ratio | — | |
| 0.175 | ratio | — |
| Variable | Formula | Unit | Depends on |
|---|---|---|---|
if((<)+(>)*(==)+(<=0)+(/<)*(==)+(/<)*(==)+(<)+(>)+(<0)+(<)+(<)+(<)+(<)+(<)+(<)+(<)+(<)+(<)+(<)+(<)+(<)+(<)+(<)+(<)+(<)+(<0)+(if(<=,+(-)*(-)/,if(<=,+(-)*(-)/,if(<=,+(-)*(-)/,if(<=,+(-)*(-)/,if(<=,+(-)*(-)/,+(-)*(-)/)))))-*<=)+(<)+(>)+(<)+(>)+(<)+(>)+(<0)+(>=)+(<)+(<0)+(>)+(>=)*((<)+(>))>0,1,0) | bool | ||
-*((-)/)^ | ratio | ||
* | ratio | ||
if(<=,+(-)*(-)/,if(<=,+(-)*(-)/,if(<=,+(-)*(-)/,if(<=,+(-)*(-)/,if(<=,+(-)*(-)/,+(-)*(-)/))))) | ratio | ||
* | ratio | ||
* | ratio | ||
(-)* | ratio | ||
if(-<*,0,min((-)/max(,),)) | ratio | ||
*(-*^2)*(-*((-)/)^)/max(,) | ratio | ||
if(-<*,0,min((-)/max(,),)) | ratio | ||
*(-*^2)*(-*((-)/)^)/max(,) | ratio | ||
if(-<*,0,min((-)/max(,),)) | ratio | ||
*(-*^2)*(-*((-)/)^)/max(,) | ratio | ||
if(-<*,0,min((-)/max(,),)) | ratio | ||
*(-*^2)*(-*((-)/)^)/max(,) | ratio | ||
if(-<*,0,min((-)/max(,),)) | ratio | ||
*(-*^2)*(-*((-)/)^)/max(,) | ratio | ||
if(-<*,0,min((-)/max(,),)) | ratio | ||
*(-*^2)*(-*((-)/)^)/max(,) | ratio | ||
if(-<*,0,min((-)/max(,),)) | ratio | ||
*(-*^2)*(-*((-)/)^)/max(,) | ratio | ||
if(-<*,0,min((-)/max(,),)) | ratio | ||
*(-*^2)*(-*((-)/)^)/max(,) | ratio | ||
if(-<*,0,min((-)/max(,),)) | ratio | ||
*(-*^2)*(-*((-)/)^)/max(,) | ratio | ||
if(-<*,0,min((-)/max(,),)) | ratio | ||
*(-*^2)*(-*((-)/)^)/max(,) | ratio | ||
if(-<*,0,min((-)/max(,),)) | ratio | ||
*(-*^2)*(-*((-)/)^)/max(,) | ratio | ||
if(-<*,0,min((-)/max(,),)) | ratio | ||
*(-*^2)*(-*((-)/)^)/max(,) | ratio | ||
if(-<*,0,min((-)/max(,),)) | ratio | ||
*(-*^2)*(-*((-)/)^)/max(,) | ratio | ||
if(-<*,0,min((-)/max(,),)) | ratio | ||
*(-*^2)*(-*((-)/)^)/max(,) | ratio | ||
if(-<*,0,min((-)/max(,),)) | ratio | ||
*(-*^2)*(-*((-)/)^)/max(,) | ratio | ||
if(-<*,0,min((-)/max(,),)) | ratio | ||
*(-*^2)*(-*((-)/)^)/max(,) | ratio | ||
if(-<*,0,min((-)/max(,),)) | ratio | ||
*(-*^2)*(-*((-)/)^)/max(,) | ratio | ||
if(==,,) | USD2014 | ||
if(==,,) | — | ||
if(==,,) | — |
| Variable | Formula | Unit | Depends on |
|---|---|---|---|
if(==,,) | % | ||
* | % | ||
*(-) | m | ||
*****(-) | % | ||
*/max(****,) | m3/s | ||
* | m3/s | ||
** | m3/s | ||
- | ratio | ||
/max(,) | m3/s | ||
* | m3/s | ||
* | m3/s | ||
+*(*++++++++++++++++*) | % | ||
+*(*++++++++++++++++*) | % | ||
** | % | ||
** | h/year | ||
* | MWh/year | ||
/ | MW | ||
******/ | hm3/year | ||
****/- | MWh/year | ||
*/max(*,) | m3/kWh | ||
/max(*,) | ratio | ||
(-/max(,))* | % | ||
/ | ft | ||
*^(-)*^// | EUR/kW | ||
(/)^(-) | ratio | ||
clamp(*,/,/) | EUR/kW | ||
if(>=,,) | EUR/kW | ||
* | USD/kW | ||
| EUR/kW | ||
** | EUR | ||
*if(==,,)* | EUR | ||
*if(==,,)* | EUR | ||
*if(==,,)* | EUR | ||
*if(==,,)* | EUR | ||
/(*) | EUR/kW | ||
/(*) | EUR/kW | ||
(>)*if(==,,)*^*if(==,+*,)/ | EUR | ||
+ | EUR | ||
/(*) | EUR/kW | ||
*(+*) | EUR/kW | ||
*(+*) | EUR/kW | ||
if(==,,)/ | EUR/kW | ||
if(==,,)/ | EUR/kW | ||
if(<,/,(*(+)^)/max((+)^-,)) | 1/year | ||
* | EUR/year | ||
min(*^,****)/ | EUR/year | ||
/max(,)* | % | ||
/(*) | EUR/kW/year | ||
+ | EUR/year | ||
/max(,) | EUR/MWh | ||
*/max(,) | EUR/MWh | ||
*/max(,) | EUR/MWh | ||
/max(,) | EUR/MWh | ||
* | USD/MWh | ||
if(==,,) | USD/MWh | ||
if(==,,) | USD/MWh | ||
(-)/max(-,)* | % |
Assumptions
105 assumptions used in the calculations
Assumptions
105 assumptions used in the calculations
Protects divisions.
Market range Not applicable.
0OpenJack DSL conventionAnnualisation of power into energy.
Market range8760h/yearCalendarConverts m3/s into m3 per hour.
Market range Exact.
3600s/hSISpecific water use per kWh.
Market range Exact.
1000kWh/MWhSIUnit term in the efficiency curve, the CRF and the uplift factors.
Market range Exact.
1Numerical constantEnd-point weight of the trapezoidal integration.
Market range Exact.
0.5Numerical constantConverts percent inputs and constants to fractions.
Market range Exact.
0.01Numerical constantConverts fractions to percent outputs.
Market range Exact.
100Numerical constantMW to kW for the per-kW costs.
Market range Exact.
1000kW/MWSIMW to W in the power equation rho g Q H eta.
Market range Exact.
1000000W/MWSITurbined volume reported in hm3.
Market range Exact.
1000000m3/hm3SIPower equation P = rho g Q H eta.
Market range1000kg/m3RETScreen eq. 7Power equation.
Market range9.81m/s2RETScreen eq. 7The ORNL cost equations take the head in feet.
Market range Exact.
0.3048m/ftInternational footFlow of best efficiency as a fraction of design flow.
Market range No independent range cited.
0.75ratioRETScreen App. AShape of the part-load efficiency curve.
Market range No independent range cited.
3.5RETScreen App. AFlatness of the Kaplan curve around its peak.
Market range No independent range cited.
6RETScreen App. APeak efficiency of a double-regulated Kaplan or bulb.
Market range ESHA Table 6.7 gives 0.91 (single regulated) to 0.93 (double regulated).
93%ESHA Table 6.7Peak efficiency when the single-regulated option is selected.
Market range See the double-regulated entry.
91%ESHA Table 6.7Turbine flow below which the unit is stopped and the water spilled.
Market range No independent range cited.
15%ESHA Table 3-2Generator loss, held constant over load.
Market range ESHA Table 6.8 lists 0.95-0.98 across sizes.
97%ESHA Table 6.8Step-up transformer loss.
Market range No independent range cited.
99%GRASS r.greenHead loss at design flow; scales with (Q/Qd)^2 at part flow (RETScreen eq. 8).
Market range No independent range cited.
5%RETScreen Fig. 15Applied to the FDC energy to give annual energy.
Market range No independent range cited.
93%ORNL from NERC GADSIntegration step of the trapezoidal rule and spacing of the FDC inputs.
Market range Not applicable.
5%ESHA §3.6Below 20 % duration the turbine is assumed at design flow; this holds because t_d >= 20 % and the curve does not increase with duration.
Market range Not applicable.
20%Model gridInterpolation of the FDC at the design exceedance.
Market range Not applicable.
25%Model gridInterpolation of the FDC at the design exceedance.
Market range Not applicable.
30%Model gridInterpolation of the FDC at the design exceedance.
Market range Not applicable.
35%Model gridInterpolation of the FDC at the design exceedance.
Market range Not applicable.
40%Model gridInterpolation of the FDC at the design exceedance.
Market range Not applicable.
45%Model gridUpper limit of the design exceedance.
Market range Not applicable.
50%Model gridDouble-regulated Kaplan / bulb.
Market range Not applicable.
1SelectorSingle-regulated Kaplan.
Market range Not applicable.
2SelectorReference case 1 (default): ORNL new stream-reach development, new weir and powerhouse. ICC Eq. 2, licensing, Figure 3 split and O&M all from ORNL/TM-2015/471 (2014$). Efficiency from ESHA / RETScreen (ORNL prints none).
Market range Not applicable.
1OpenJack case selectorReference case 2: ORNL non-powered dam, existing weir whose cost is not paid and not included. ICC Eq. 1, licensing, Figure 3 split and O&M all from ORNL/TM-2015/471 (2014$). Efficiency from ESHA / RETScreen (ORNL prints none). 3,540.7 EUR2014/kW and 99.22 EUR2014/MWh at the default.
Market range Not applicable.
2OpenJack case selectorLicensing not counted.
Market range Not applicable.
1SelectorLicensing at the ORNL point estimate.
Market range Not applicable.
2SelectorLicensing with the ORNL +20 % present-value uplift.
Market range Not applicable.
3SelectorNew-weir ICC coefficient.
Market range ORNL: -50 % to +100 % around any parametric prediction.
9605710USD2014ORNL Eq. 2Capacity exponent of the specific-ICC law: specific_capex_scaled = case ICC at 10 MW x (P / 10 MW)^(0.977 - 1), x1.028 at 3 MW and x0.964 at 50 MW. The 3-50 MW slider is inside both ORNL application ranges (NSD 3-824 MW, NPD 66 kW-105 MW), so the domain is not reduced. Low-head class: 6-30 m is 19.7-98 ft, at the bottom of the NSD sample. ORNL itself applies these equations to low-head resources (section 6.2, p. 30: 100 to 210 $/MWh for low-head NSD, 80 to 200 $/MWh for low-head NPD at 33 ft or less), and the NPD sample (31 projects, 14-356 ft) covers low head (Low Head NPDs below 32.8 ft, p. 6). The head term stays in the model. Limit: the capacity-class sub-regressions of Table A.8 (1 to <10 MW: P^1.06, R2 0.67; 10 to <30 MW: P^1.49, R2 0.46) are not the model ORNL recommends and are not used.
Market range ORNL Table A.8 alternative NSD models: P^0.24 to P^1.49 by capacity class; no independent range cited.
0.977ORNL Eq. 2Head elasticity of the cost per kW. Empirical: it comes from the regression on built projects, not from physics.
Market range No independent range cited.
-0.126ORNL Eq. 2Below 3 MW the input is refused rather than extrapolated.
Market range Not applicable.
3MWORNL §4.2.3Below 5.9 m a new-weir case is refused.
Market range Not applicable.
19.3ftORNL §4.2.3Existing-weir ICC coefficient.
Market range ORNL: -50 % to +100 %.
11489245USD2014ORNL Eq. 1Power economy of scale, NPD.
Market range No independent range cited.
0.976ORNL Eq. 1Head elasticity of NPD cost per kW (empirical).
Market range No independent range cited.
-0.24ORNL Eq. 1Existing-weir cases above 105 MW are refused.
Market range Not applicable.
105MWORNL Eq. 1Existing-weir cases below 4.3 m are refused.
Market range Not applicable.
14ftORNL Eq. 1Lower guard of the model ICC per kW; never binds inside the slider box (model 2,617-4,843 EUR2014/kW). Also sets the Customized floor, 753 EUR2014/kW.
Market range1000USD/kWORNL §3.1Upper guard of the model ICC per kW; never binds inside the slider box. Also sets the Customized ceiling, 6,775 EUR2014/kW.
Market range9000USD/kWORNL §3.1New-weir licensing and permitting.
Market range No independent range cited.
969613USD2014ORNL Table 5Existing-weir licensing and permitting.
Market range No independent range cited.
492754USD2014ORNL Table 5Licensing scale effect.
Market range No independent range cited.
0.7ORNL Table 5Optional uplift (third licensing option).
Market range No independent range cited.
20%ORNL §6.1Power-law O&M.
Market range No independent range cited.
225417USD2014/yearORNL Eq. 6Strong economy of scale of O&M.
Market range No independent range cited.
0.547ORNL Eq. 6Cap on O&M for cheap plants.
Market range No independent range cited.
2.5%ORNL Table 9Civil share of a new weir. Fixed share: civil and E-M scale identically with power and head, a stated limitation.
Market range No independent range cited.
50%ORNL Fig. 3Electro-mechanical share, NSD.
Market range No independent range cited.
26%ORNL Fig. 3Electrical infrastructure share, NSD.
Market range No independent range cited.
8%ORNL Fig. 3Engineering and CM share, NSD.
Market range No independent range cited.
16%ORNL Fig. 3Civil share, existing weir.
Market range No independent range cited.
49%ORNL Fig. 3Electro-mechanical share, existing weir.
Market range No independent range cited.
37%ORNL Fig. 3Electrical share, existing weir.
Market range No independent range cited.
5%ORNL Fig. 3Engineering and CM share, existing weir.
Market range No independent range cited.
9%ORNL Fig. 3Converts the ORNL 2014$ figures to EUR2014. Currency conversion only: no US-to-Europe location factor is applied.
Market range No independent range cited.
1.3285USD/EURECB 2014 averageReference band for the new-weir option, compared in USD2014.
Market range100USD/MWhORNL §6.2Upper end of the new-weir band.
Market range210USD/MWhORNL §6.2Reference band for the existing-weir option.
Market range80USD/MWhORNL §6.2Upper end of the existing-weir band.
Market range200USD/MWhORNL §6.2Low end of the ICC uncertainty band.
Market range -50 % to +100 %.
-50%ORNL §6.2High end of the ICC uncertainty band.
Market range -50 % to +100 %.
100%ORNL §6.2Low end of the new-weir reference.
Market range4000USD/kWORNL §3.1High end of the new-weir reference.
Market range6500USD/kWORNL §3.1Low end of the existing-weir reference.
Market range2500USD/kWORNL §3.1High end of the existing-weir reference.
Market range5500USD/kWORNL §3.1Default design exceedance (input).
Market range Slider 20-50 %.
30%Kao et al. 2014Default residual flow (input).
Market range Slider 0.5-2 x Q95.
1x Q95ESHA Part 2 §9Not usable here: the mean flow cannot be computed from an FDC whose top 20 % is open. Convert it to a Q95 multiple by hand.
Market range No independent range cited.
10%ESHA Part 2 §9Default discount rate (input 0.062).
Market range Slider 5-10 % real.
6.2%ORNL §6.1Default annuity period of the calculator LCOE (input). It is not the service life exported to the project mode, which is 40 years (asset_service_life_years).
Market range Slider 20-40 years.
20yearsORNL §6.1Lower reference for the capacity factor.
Market range ATB representative plants 0.333-0.665.
0.333ratioNREL ATB 2024Shows that flat lowland FDCs give higher CF than the ESHA default.
Market range NSD 1-4: 0.624-0.665.
0.665ratioNREL ATB 2024Reference range for run-of-river capacity factor.
Market range53%Kao et al. 2014Upper reference for the capacity factor.
Market range71%Kao et al. 2014ENERGY MODEL. Design flow from the installed capacity (eq. 10). At each 5 % point of the FDC: available flow = river flow - residual flow (eq. 3), turbine flow = min(available, design flow) (eq. 11), zero below 15 % of design flow; net head = Hg (1 - 5 % (Q/Qd)^2) (eq. 8); power = rho g Q h_net eta_t eta_gen eta_tr (eq. 7). Annual energy = 8760 x availability x trapezoidal integral (eq. 12); CF = E / (8760 P) (eq. 19).
Market range Not applicable.
—RETScreen + ESHAFDC INPUT. The site flow-duration curve is entered at 5 % steps from Q20 to Q100 as multiples of the median flow Q50. The default is the ESHA example curve, linearly interpolated and divided by its median (2.0 m3/s). The curve is scaled to the plant: the available flow at the design exceedance equals the design flow, which gives the implied median flow (65.0 m3/s at the default). The ESHA curve is a one-year example from a small, flashy stream: large lowland low-head rivers have flatter curves and higher CF (NREL ATB bulb-Kaplan NSD plants 0.62-0.67). Enter the site curve.
Market range Slider band: ESHA shape to the power 0.75 (flatter) to 1.2 (flashier).
—ESHA example FDCOMISSIONS. (1) The tailwater rise at high flows (RETScreen eq. 9) is not modelled: at low head this overstates energy during floods. (2) One equivalent unit: RETScreen's multi-unit rule (flow split between identical units) would raise part-load efficiency. (3) No parasitic consumption. (4) Single-regulated turbines keep the Kaplan curve shape. (5) No seasonal or interannual variability beyond the entered FDC.
Market range Not applicable.
—Model limitsCOST MODEL. ICC from the ORNL regressions on built US projects (construction and equipment including engineering and construction management; excludes licensing, development and financing). The head elasticity of the cost per kW (-0.126 NSD, -0.240 NPD) is empirical: it comes from the regression on built projects. It is far weaker than the growth of the design flow as head falls (Qd ~ 1/H), so the model does not claim that civil quantities were derived from the flow. The civil / E-M / electrical / engineering split uses fixed historical shares, so every line scales like the ICC.
Market range ORNL: -50 % to +100 % around the parametric prediction.
—ORNL 2015CURRENCY. Every money figure is EUR2014 obtained from ORNL 2014$ at 1.3285 USD/EUR (currency conversion only, no location factor, no escalation to a later year). LCOE uses constant EUR2014 and a real discount rate, so no cost line is escalated. The meta declares EUR, currency year 2014.
Market range Not applicable.
—EUR2014PROJECT EXPORT. The meta exports the total capital cost, ICC plus licensing per the selected option, as an installed CAPEX (battery_limit 'installed'). The ICC already includes engineering and construction management, so 'installed' is the right level, not 'fully_financed' (financing is excluded). In 'installed' the project cashflow adds only working capital and contingency; it adds no licensing, so licensing travels inside the exported CAPEX. O&M is exported as fixed O&M; there is no variable O&M and no fuel inlet. The asset lifetime exported is the 40-year service life, not the 20-year ORNL annuity.
Market range Not applicable.
—Meta boundaryBATCH ALIGNMENT. Same economic basis as the other hydro calculators of the batch: EUR2014 from ORNL 2014$ at 1.3285 USD/EUR, real discount rate (default 6.2 %) and economic lifetime (default 20 years) as user inputs.
Market range Not applicable.
—Batch conventionCROSS-CHECK, at the default only. At 10 MW, 10 m, Q30, 1 x Q95, new weir, licensing included, 6.2 % and 20 years, the model gives 163.4 USD2014/MWh (123.0 EUR2014/MWh), inside ORNL's low-head NSD band of 100-210 USD2014/MWh. This is a plausibility check, not a validation: ORNL's band comes from the same cost equations applied to US resource data. The existing-weir case gives 131.8 USD2014/MWh against ORNL's 80-200 band. The model ICC per kW (5,868 USD2014/kW at the default) sits inside the 4,000-6,500 $/kW of NSD C-stage projects (same currency and year). Away from the default the LCOE leaves the band: a Customized 753 EUR2014/kW quote at 50 MW and Q50 (other inputs at default) gives 26.1 USD2014/MWh, far below it.
Market range 100-210 USD2014/MWh (NSD), 80-200 (NPD).
—ORNL §6.2CORNERS. Model value, default FDC: LCOE 31.7-247.0 EUR2014/MWh, CF 34.5-65.2 %, ICC 2,617-4,843 EUR2014/kW. Model value, flattest and flashiest smooth FDC of the slider band: LCOE 30.0-254.8, CF 33.4-69.0 %. With the Customized option the ICC spans 753-6,775 EUR2014/kW and the LCOE 10.4-332.3 EUR2014/MWh (753 EUR2014/kW, 50 MW, 6 m, Q50, 5 %, 40 years, licensing excluded; and 6,775 EUR2014/kW, 3 MW, Q20, 2 x Q95, 10 %, 20 years, licensing + 20 %). Irregular site curves (steep above the design point, flat at low flow) combined with a high residual flow can push CF below 30 %: that is the site signalling an oversized plant, not a model fault.
Market range Not applicable.
—Corner scanReference size Pref of specific_capex_scaled = case ICC at Pref x (P/Pref)^(e-1). 10 MW is an OpenJack convention (the default capacity), not the size of a cited cost anchor.
Market range No independent range cited.
10MWOpenJack conventionLowest Customized ICC accepted (slider min and guard), EUR2014.
Market range 1,000 to nearly 9,000 $/kW, historical extremes of built US projects.
753EUR/kWORNL section 3.1 / ECB 2014Highest Customized ICC accepted (slider max and guard), EUR2014.
Market range 1,000 to nearly 9,000 $/kW, historical extremes of built US projects.
6775EUR/kWORNL section 3.1 / ECB 2014Converts the gross hydraulic energy rho g H V to MWh for the loss balance.
Market range Not applicable.
3600000000J/MWhSIBenchmark for the retained ICC per kW, new weir, low end. Same ICC scope as the model (licensing and financing excluded).
Market range3011EUR/kWORNL section 3.1Benchmark for the retained ICC per kW, new weir, high end.
Market range4893EUR/kWORNL section 3.1Benchmark for the retained ICC per kW, existing weir, 25th percentile.
Market range1882EUR/kWORNL section 3.1Benchmark for the retained ICC per kW, existing weir, 75th percentile.
Market range4140EUR/kWORNL section 3.1Service life exported as meta.asset.lifetime_years: the shortest design life of a major component (electro-mechanical, 40 years or more), so the project does not buy the plant again after the 20-year ORNL annuity. Civil works last longer; the project treats the whole plant as one asset.
Market range 40 years or more (E-M), 50-100 years (civil).
40yearsIRENA RPGC 2023LIMITS OF THE SCALE LAW. O&M at scale: the power law gives 103.2 EUR2014/kW-year at 3 MW and 28.8 at 50 MW, i.e. 0.68 % of the model ICC at 50 MW, below the 1-4 % range the same source quotes. The 'lesser of' rule is ORNL's and is kept, so large plants carry an O&M at the low end of the published range. The ICC law itself is a US regression on 18 (NSD) and 31 (NPD) built projects; no European data enter it.
Market range Not applicable.
—Model limits