Energy mass balanceCostingCarbon footprintHydrogen
Autothermal reforming (ATR) hydrogen plant with CO2 capture
Oxygen-blown ATR with ASU, shift, MDEA capture and PSA (NETL Case 3) on the IEAGHG euro basis: gas, oxygen, power, CO2 captured and emitted, CAPEX by island, O&M and LCOH in EUR/kg.
Open Jack
Founder · OpenJack
- CurrencyEUR 2020
- Battery limitfully financed
- 86 documented assumptions
- Updated27 Oct 2026
Mass and energy balance
What the asset draws and delivers for the case and load you choose.
Share of 8760 h at nameplate output. 90 % is the NETL and IEAGHG assumption for reforming.
Flows
- In: Natural gas—
- In: Electricity—
Asset
Autothermal reforming hydrogen plant with CO2 capture
- Out: Hydrogen—
- Out: Captured CO2—
Annual quantities at the current usage. Outline: full capacity, 8,760 h. Fill: 90.0 % capacity factor. Band width: share of energy in; non-energy flows are not to scale.
Nameplate H2 output. Default 660 t/d = NETL Case 3 (27,500 kg/h), the only size NETL prices. The 500-820 t/d range (anchor +/-25 %) is an OpenJack screening choice to keep the single-anchor extrapolation short, not a domain printed by a source.
- H2 output at nameplate
- — kg/h
- Gas thermal input (HHV)
- — MW
- Electrical load at full output
- — MW
- CO2 captured at nameplate
- — t/h
CAPEX
Specific cost at this size, what backs it, and how it behaves with scale.
Specific CAPEX at this size
—
Reference size 660 t/d
Published practice (IEAGHG) + account exponents (QGESS); whole-plant use is a modelling assumption.
Model value: NETL Case 3 total overnight cost scaled with capacity. Customized: your own total overnight cost per kg/d (TOC perimeter, EUR 2020) replaces it at every size, with no scaling law applied. The CAPEX is then no longer sourced; fixed O&M follows it at NETL's 2.73 %/yr of TOC.
Log in to view this sensitivity chart.
- Ex-factory
- Installed
- Fully financed· this figure
Included
- Equipment and installation
- Indirect and owner's costs
- Contingency
Not included
- Nothing
Added at project level
- Nothing: project mode uses the figure as is
Project figures
Values passed to project mode when this asset is added to a project.
Autothermal reforming hydrogen plant with CO2 captureConcept sketch, not to scale · drag to rotate
- Natural gas in
- —
- Electricity in
- —
- Hydrogen outMain product
- —
- Captured CO2 out
- —
- CAPEX to the battery limit
- —
- Fixed O&M
- —
- Variable O&M, excluding feedstocks
- —
- Asset lifetime
- 25 years
Log in to add this asset to a project.
Levelised cost of hydrogen
A standalone indicator for a quick read. Project mode recomputes it for the whole system.
—
- Capital cost—
- Fixed O&M cost—
- Natural gas cost—
- Electricity cost—
- CO2 transport and storage cost—
- Carbon cost on residual emissions—
- Other variable O&M—
Linked to the balance above
Share of 8760 h at nameplate output. 90 % is the NETL and IEAGHG assumption for reforming.
Share of the carbon in the gas captured as CO2. NETL Case 3: 94.5 %. Announced ATR projects: 94.2-98.7 %. Capture-island CAPEX and power scale with captured CO2.
Default 21.10 EUR/MWh = IEAGHG Netherlands 2020. Applied to the HHV gas intensity.
Default 94.05 EUR/MWh = IEAGHG Netherlands 2020. Priced on the 4.0 kWh/kg import.
Per tonne of captured CO2. IEAGHG NL: 54.6 central 2020 (43.4-76), 15.8 central 2050. Set to 0 if the CO2 outlet is chained to a T&S asset.
Applied to the uncaptured CO2 only. IEAGHG NL 2020: 13.5 EUR/t.
Real rate as a fraction (0.08 = 8 %). IEAGHG standard 8 %, sensitivities 5 % and 10 %.
IEAGHG 25 years; NETL 30 years.
Log in to view this sensitivity chart.
All results
Every model output at the current settings, grouped, with the sensitivity charts.
60 outputs · 5 groups · 20 also shown above, dimmed
Cost
10- CO2 capture and storage chain cost
- ComputingEUR/kg
- CCS share of LCOH
- Computing%
Annual flows
8- Annual natural gas use (mass)
- Computingt/year
- Annual electricity import
- ComputingMWh/year
- Annual oxidant production
- Computingt/year
- Annual CO2 emitted
- Computingt/year
Intensities and efficiency
17- Natural gas consumption
- ComputingkWh/kg
- Natural gas consumption (GJ)
- ComputingGJ/kg
- Natural gas mass per kg H2
- Computingkg/kg
- Cold gas efficiency (HHV)
- Computing%
- Oxidant demand
- Computingkg/kg
- ASU power
- ComputingkWh/kg
- ASU specific power
- ComputingkWh/t
- ASU power vs NETL quoted figure
- Computingratio
- Capture and CO2 compression power
- ComputingkWh/kg
- H2 compression power
- ComputingkWh/kg
- Other balance-of-plant power
- ComputingkWh/kg
- Electricity import
- ComputingkWh/kg
- ASU share of power
- Computing%
- CO2 generated
- Computingkg CO2/kg H2
- CO2 captured
- Computingkg CO2/kg H2
- CO2 emitted
- Computingkg CO2/kg H2
- CO2 emission factor of the gas
- Computingkg/GJ
CAPEX by island
12- Model specific CAPEX
- ComputingEUR/(kg/d)
- Scale factor on specific cost
- Computingratio
- ASU plant cost
- ComputingEUR
- Capture island plant cost
- ComputingEUR
- Reforming island and BOP plant cost
- ComputingEUR
- Total plant cost (TPC)
- ComputingEUR
- Owner's costs
- ComputingEUR
- Total overnight cost (MEUR)
- ComputingMEUR
- Capital recovery factor
- Computing1/year
- Annualised CAPEX
- ComputingEUR/year
Other
13- Natural gas price per GJ
- ComputingEUR/GJ
- Annual operating hours
- Computingh/year
- CO2 transport and storage cost
- ComputingEUR/year
- Carbon cost
- ComputingEUR/year
- Natural gas cost
- ComputingEUR/year
- Electricity cost
- ComputingEUR/year
- Total annual cost
- ComputingEUR/year
Sensitivities
7 chartsLog in to view this sensitivity chart.
Log in to view this sensitivity chart.
Log in to view this sensitivity chart.
Log in to view this sensitivity chart.
Log in to view this sensitivity chart.
Log in to view this sensitivity chart.
Log in to view this sensitivity chart.
Sources
86 documented assumptions · 6 sources
- netl.doe.govNETL DOE/NETL-2022/3241 (Apr 2022) - Comparison of commercial fossil-based hydrogen production technologies, Case 3 ATR with CCSmass, energy, carbon balance, plant cost, O&M, LCOH
- ieaghg.orgIEAGHG Technical Report 2022-07 - Low-carbon hydrogen from natural gasglobal roadmap - LCOH method, NL 2020 prices, CO2 T&S fees, discount rate, lifetime, exchange rate
- observatory.clean-hydrogen.europa.euEuropean Hydrogen Observatory (Nov 2024) - European hydrogen market landscapeSMR+CC average LCOH in Europe 2023
- h2tools.orgPNNL Hydrogen Tools (HyARC) - lower and higher heating values of fuels (hydrogen HHV 141.88 MJ/kg)
- NETL QGESS - Capital Cost Scaling Methodology, Rev. 4 (DOE/NETL, 2022) - account exponentsASU 0.70 (Exhibit 3-19, account 4.3), MDEA AGR 0.70 (Exhibit 3-20 note A); scaling domain = median of printed ranges +/-25 % (p.13, p.19)
- chemengonline.comChemical Engineering - 2019 CEPCI annual average (607.5, 4.4 points above 2018)
About
Calculator context
About
Calculator context
Screening techno-economics for a low-carbon hydrogen plant built on oxygen-blown autothermal reforming (ATR) of natural gas, with an air separation unit (95 vol% O2), prereformer, water-gas shift, MDEA pre-combustion CO2 capture, pressure swing adsorption, CO2 compression and drying, H2 compression, and a fired heater burning the PSA off-gas. The plant is NETL's Case 3 (DOE/NETL-2022/3241): 660 t/d of hydrogen, 94.5 % capture. The euro economic basis comes from IEAGHG 2022-07 (Netherlands 2020: gas 21.10 EUR/MWh, electricity 94.05 EUR/MWh, CO2 transport and storage 54.6 EUR/t, carbon 13.5 EUR/t, 8 % real over 25 years, 1.142 $/EUR). The SMR calculator of the same batch uses the same basis, so the two can be compared line by line.
Every per-kg intensity is a ratio of flows NETL prints. These ratios are derived, not printed. Natural gas is 51.20 kWh_HHV/kg (0.1843 GJ/kg; NETL's fuel-cost line gives the same to 0.1 %). Oxidant is 4.65 kg/kg. Electricity import is 4.00 kWh/kg: the ASU takes 2.03, capture and CO2 compression 1.00, H2 compression 0.51, and other balance of plant 0.46. CO2 is generated from the carbon content of the gas burnt (50.6 kg/GJ_HHV), which gives 9.33 kg/kg, and is split by the capture rate. At 94.5 % capture, 8.815 kg/kg is captured. That matches the 242,411 kg/h CO2 product stream of a different NETL exhibit (8.815 kg/kg). The remaining 0.513 kg/kg is emitted, against 0.517 from NETL's stack carbon and the printed 0.5 lb/lb. The model's HHV cold-gas efficiency is 77.0 %, 1.3 points above the 75.7 % NETL prints. That gap is published here, not reconciled.
Plant cost follows NETL's Exhibit 3-46 in three blocks (Dec-2018 $ per kg/day): ASU 408, capture island 178 (MDEA 54 + CO2 compression 124), and reforming island plus balance of plant 506. The capture block scales with captured CO2. All three scale with capacity around the 660 t/d anchor with a whole-plant exponent of 0.70 (IEAGHG's own exponent for rescaling an ATR plant; QGESS's ASU and MDEA account exponents). The 500-820 t/d capacity range is a screening choice, not a source domain. A Customized option replaces the model's specific cost by a user quote (EUR 2020, TOC perimeter). Owner's costs bring the total plant cost (TPC) to the total overnight cost (TOC), at TOC/TPC = 1.256. Fixed O&M is NETL's 37.469 $/(kg/d)/yr, held at 2.73 %/yr of TOC (3.43 %/yr of TPC). Other variable O&M is NETL's variable O&M without its electricity line: 0.0616 EUR/kg. The Dec-2018 dollars are taken flat to 2020 before conversion: that factor of 1 is a modelling assumption, not a cited index ratio. TOC excludes escalation and interest during construction (NETL's TASC is 7 % higher).
At the nominal case (660 t/d, 90 % capacity factor, 94.5 % capture), the LCOH is 2.45 EUR/kg:
- gas 1.08
- CO2 transport and storage 0.48
- electricity 0.38
- capital 0.34 (TOC 793 MEUR, CRF 0.0937)
- fixed O&M 0.10
- other variable O&M 0.06
- carbon 0.01 The capture chain (storage fee, capture power and capture-island capital) is 0.63 EUR/kg, 26 % of the total. Two independent figures sit near this result without being its source. IEAGHG's ATR with gas-heated reformer in the Netherlands 2020 is 2.62 EUR/kg (a different plant, carbon price included). NETL Case 3 at US prices is 1.59 $/kg (about 1.39 EUR/kg).
The bounds were checked at all 2048 corners of the input box. LCOH stays within 1.37-4.35 EUR/kg, CO2 captured within 8.40-9.05 kg/kg, and CO2 emitted within 0.28-0.93 kg/kg. With every other input at its worst corner, gas above about 58 EUR/MWh would take the LCOH past 5 EUR/kg (about 71 EUR/MWh with the other inputs at nominal), so the gas slider stops at 45 and 2022-type prices are outside the declared domain. Emissions are direct (scope 1) only. Upstream methane leakage and the carbon footprint of imported electricity are outside the boundary.
Model
156 variables — inputs, calculations and outputs, with their dependencies.
Model
156 variables — inputs, calculations and outputs, with their dependencies.
| Variable | Value | Unit | Depends on |
|---|---|---|---|
| 660 | t/d | — | |
| 90 | % | — | |
| 94.5 | % | — | |
| 0 | — | — | |
| 1200 | EUR/(kg/d) | — | |
| 21.1 | EUR/MWh | — | |
| 94.05 | EUR/MWh | — | |
| 54.6 | EUR/t | — | |
| 13.5 | EUR/t | — | |
| 0.08 | ratio | — | |
| 25 | year | — |
| Variable | Formula | Unit | Depends on |
|---|---|---|---|
if(( <= ) + ( <= ) + ( > ) + ( < ) + ( >= ) + ( <= ) + ( < ) + ( < ) + ( < ) + ( < ) + ( < ) + ( < ) > , , ) | — | ||
* | kg/d | ||
/ | kg/h | ||
* | kg/year | ||
/ | kWh/kg | ||
| ratio | ||
( + ) / | kWh/kg | ||
/ ( / ) | — | ||
* / | kg/d | ||
* | EUR | ||
( + ) * * | EUR | ||
( - - - ) * | EUR | ||
+ + | EUR | ||
* / | EUR | ||
/ max(, ) | ratio |
| Variable | Formula | Unit | Depends on |
|---|---|---|---|
* * | h/year | ||
/ | t/year | ||
* | kWh/kg | ||
* | GJ/kg | ||
/ | kg/kg | ||
* * | MWh/year | ||
* / | t/year | ||
/ max(, ) * | % | ||
* / / ( * ) | kg/GJ | ||
* | kg CO2/kg H2 | ||
* * | kg CO2/kg H2 | ||
- | kg CO2/kg H2 | ||
* / | t/year | ||
* / | t/year | ||
/ | kg/kg | ||
* / | t/year | ||
( + + ) / | kWh/kg | ||
/ max(, ) * | kWh/t | ||
/ | ratio | ||
* | kWh/kg | ||
/ | kWh/kg | ||
( * - - - - - - ) / | kWh/kg | ||
+ + + | kWh/kg | ||
/ max(, ) * | % | ||
* * | MWh/year | ||
* / | MW | ||
clamp( / , , ) ^ ( - ) | ratio | ||
/ max(, ) | EUR/(kg/d) | ||
if( >= , , ) | EUR/(kg/d) | ||
* | EUR | ||
* | EUR | ||
* | EUR | ||
* | EUR | ||
* | EUR | ||
- | EUR | ||
/ | MEUR | ||
if( < , / , ( * ( + ) ^ ) / max(( + ) ^ - , )) | 1/year | ||
* | EUR/year | ||
/ * | EUR/year | ||
( - ) / | EUR/kg | ||
* | EUR/year | ||
* | EUR/year | ||
* + + | EUR/year | ||
* | EUR/year | ||
* | EUR/year | ||
+ + + + | EUR/year | ||
/ max(, ) | EUR/kg | ||
/ max(, ) | EUR/kg | ||
* * | EUR/kg | ||
* * | EUR/kg | ||
* / | EUR/kg | ||
* / | EUR/kg | ||
/ max(, ) | EUR/kg | ||
+ * * + * * / / max(, ) | EUR/kg | ||
/ max(, ) * | % | ||
/ | EUR/GJ | ||
+ - * * | MWh/year | ||
| kg/h | ||
* / | MW | ||
* / | t/h |
Assumptions
86 assumptions used in the calculations
Assumptions
86 assumptions used in the calculations
Prevents division by zero in every guarded denominator.
Market range Not applicable (numerical parameter).
0.000001Numerical stability constant.Used for complements, the r = 0 branch of the CRF and the scaling exponent offset.
Market range Exact.
1Arithmetic identity.Used by the input guard.
Market range Exact.
0Arithmetic identity.Percent inputs are carried 0-100 (OJ convention) and converted here, never relabelled.
Market range Exact.
0.01frac/%Unit conversion.Upper limit of the capacity factor and capture-rate guards, and fraction-to-percent conversion of reported shares.
Market range Exact.
100%Unit conversion.Annualises the hourly production through the capacity factor.
Market range Exact.
8760h/yearCalendar convention.Converts the nameplate t/day into kg/h; annual output is then built from 8760 h, so no days-per-year constant exists in the model.
Market range Exact.
24h/dCalendar convention.Tonne to kilogram.
Market range Exact.
1000kg/tUnit conversion.kWh to MWh.
Market range Exact.
0.001MWh/kWhUnit conversion.Converts the gas intensity to GJ/kg, the unit NETL and IEAGHG use for fuel.
Market range Exact.
0.0036GJ/kWhUnit conversion.Restates the gas price in EUR/GJ, as the brief's method writes it.
Market range Exact.
3.6GJ/MWhUnit conversion.MW to kW.
Market range Exact.
1000kW/MWUnit conversion.Reports the overnight cost in MEUR.
Market range Exact.
1000000EUR/MEURUnit conversion.Converts the carbon balance into CO2 mass.
Market range Exact to 0.01 %.
44.009g/molIUPAC atomic weights.Converts the carbon balance into CO2 mass.
Market range Exact to 0.01 %.
12.011g/molIUPAC atomic weights.Used only for the cold-gas-efficiency output, which compares the model with the 75.7 % NETL prints.
Market range39.41kWh/kgPhysical property.Keeps the power law away from extrapolation should the slider range ever be widened.
Market range Not applicable.
0.2Implementation guard.Upper twin of capex_scale_ratio_min.
Market range Not applicable.
2Implementation guard.Denominator of every per-kg intensity derived from the NETL flows.
Market range Design point of the anchor plant.
27500kg/hPrinted design flow.Reference capacity of the scaling law: at 660 t/d the scale factor is exactly 1 and every cost equals NETL's.
Market range World-scale ATR: 200-1500 t/d across announced projects.
660000kg/dPrinted design capacity.Gives the gas mass flow, reported for logistics alongside the energy flow.
Market range96930kg/hPrinted design flow.Numerator of the gas intensity: 1,408,040 / 27,500 = 51.20 kWh_HHV/kg = 0.1843 GJ_HHV/kg (derived ratio).
Market range1408040kWtPrinted design flow.Kept as an independent second print of the gas intensity; not used in a node because the two prints agree.
Market range Not applicable.
115306MMBtu/dPrinted design flow.Reference for the hhv_cold_gas_efficiency_model_pct output; the model does not force itself onto it.
Market range75.7%Printed efficiency.Oxidant demand of the ATR; drives the reported oxygen flow.
Market range127850kg/hPrinted stream flow.Defines the oxidant basis of oxygen_kg_per_kg_h2 (stream mass, not pure O2).
Market range95vol%Printed specification.Denominator of asu_power_reference_ratio, a consistency indicator between NETL's ASU section and its power table, not a validation.
Market range ~200-450 kWh/t O2 depending on purity, pressure and basis.
420kWh/tonPrinted specific power.One line of the electricity build-up; ASU lines scale with oxidant, capture lines with captured CO2, the H2 compressor with H2.
Market range Design point of the anchor plant.
51070kWePrinted auxiliary load.One line of the electricity build-up; ASU lines scale with oxidant, capture lines with captured CO2, the H2 compressor with H2.
Market range Design point of the anchor plant.
4020kWePrinted auxiliary load.One line of the electricity build-up; ASU lines scale with oxidant, capture lines with captured CO2, the H2 compressor with H2.
Market range Design point of the anchor plant.
780kWePrinted auxiliary load.One line of the electricity build-up; ASU lines scale with oxidant, capture lines with captured CO2, the H2 compressor with H2.
Market range Design point of the anchor plant.
6680kWePrinted auxiliary load.One line of the electricity build-up; ASU lines scale with oxidant, capture lines with captured CO2, the H2 compressor with H2.
Market range Design point of the anchor plant.
20810kWePrinted auxiliary load.One line of the electricity build-up; ASU lines scale with oxidant, capture lines with captured CO2, the H2 compressor with H2.
Market range Design point of the anchor plant.
14070kWePrinted auxiliary load.Closes the electricity balance at 4.0 kWh/kg H2.
Market range110MWePrinted auxiliary load.Default of the capture-rate input.
Market range ATR projects 94.2-98.7 % (NETL Exhibit 2-14).
94.5%Printed capture rate.Reference flow of the capture island: its CAPEX and its compression power are scaled on captured CO2 relative to this stream.
Market range Design point of the anchor plant.
242411kg/hPrinted stream flow.Carbon content of the gas per unit of HHV energy: CO2 generated follows the gas actually burnt.
Market range70011kg/hPrinted carbon flow.Cross-check of the emitted-CO2 output; not used in a node.
Market range Not applicable.
3874kg/hPrinted carbon flow.Total plant cost; the reforming-island share is derived as 1,092 - 408 - 54 - 124 = 506 $/(kg/d) (ATR, prereformer, syngas coolers, WGS 22, recycle compressor, PSA 47, H2 compressor, fired heater, cooling water, BOP).
Market range Real-2024 costs are materially higher; use the Customized CAPEX option.
1092USD2018/(kg/d)Printed cost line.Total overnight cost. TOC/TPC = 1.256 is applied as the owner's-cost rung (owner's costs, start-up, first catalyst fill, financing costs).
Market range Real-2024 costs are materially higher; use the Customized CAPEX option.
1372USD2018/(kg/d)Printed cost line.ASU section of the plant cost - 37 % of TPC, the largest single item.
Market range Real-2024 costs are materially higher; use the Customized CAPEX option.
408USD2018/(kg/d)Printed cost line.Capture island, solvent part; scaled with captured CO2.
Market range Real-2024 costs are materially higher; use the Customized CAPEX option.
54USD2018/(kg/d)Printed cost line.Capture island, compression part; scaled with captured CO2.
Market range Real-2024 costs are materially higher; use the Customized CAPEX option.
124USD2018/(kg/d)Printed cost line.Part of the 506 $/(kg/d) reforming-island remainder; carried for traceability of that remainder, not used separately.
Market range Real-2024 costs are materially higher; use the Customized CAPEX option.
22USD2018/(kg/d)Printed cost line.Part of the 506 $/(kg/d) reforming-island remainder; carried for traceability, not used separately.
Market range Real-2024 costs are materially higher; use the Customized CAPEX option.
47USD2018/(kg/d)Printed cost line.Labour, maintenance, administration, property taxes and insurance.
Market range37.469USD2018/(kg/d)/yearPrinted cost line.NETL variable O&M INCLUDING electricity; the electricity line is subtracted so that power is priced at the user's tariff.
Market range Not applicable.
0.3576USD/kgPrinted cost line.Removed from NETL variable O&M: the other variable O&M (catalysts, MDEA, TEG, water, maintenance material) is (0.35760 - 0.28727)/1.142 = 0.0616 EUR/kg.
Market range Not applicable.
0.28727USD/kgPrinted cost line.NETL's own US price; reference only - the calculator uses the IEAGHG NL basis.
Market range Reference value.
71.7USD/MWhPrinted NETL basis.About 13.2 EUR/MWh_HHV at 1.142 $/EUR: the lower end of the gas-price slider.
Market range Reference value.
4.42USD/MMBtuPrinted NETL basis.US Gulf Coast saline storage; far below European T&S, which is why the IEAGHG NL fee is used.
Market range Reference value.
10USD/tPrinted NETL basis.Same 90 % default as here.
Market range Reference value.
90%Printed NETL basis.NETL levelises over 30 years; this calculator uses IEAGHG's 25, and the slider spans 20-30.
Market range Reference value.
30yearPrinted NETL basis.Low-price reference (~1.39 EUR/kg). Not reproduced and not re-attributed: NETL uses its own capital charge factor and US prices.
Market range Reference value.
1.59USD/kgPrinted NETL basis.Reference only.
Market range Reference value.
1.51USD/kgPrinted NETL basis.Default of the discount_rate input (0.08 as a ratio).
Market range8%Printed modelling parameter.Converts every NETL dollar figure to euro. No 2018-to-2020 escalation is applied on top (see cost_year_and_escalation).
Market range1.142USD/EURPrinted exchange rate.Default of the gas price input.
Market range21.1EUR/MWhPrinted price.Default of the electricity price input.
Market range94.05EUR/MWhPrinted price.Bounds and default of the CO2 T&S fee.
Market range54.6EUR/tPrinted fee.Bounds and default of the CO2 T&S fee.
Market range43.4EUR/tPrinted fee.Bounds and default of the CO2 T&S fee.
Market range76EUR/tPrinted fee.Bounds and default of the CO2 T&S fee.
Market range15.8EUR/tPrinted fee.Default of the carbon price input; applies to the residual (uncaptured) CO2 only.
Market range13.5EUR/tPrinted price.Plausibility anchor for the nominal LCOH.
Market range2.62EUR/kgPrinted LCOH.Upper-regime reference for the LCOH bound.
Market range 4.41 EUR/kg (2023), 6.38 (2022).
4.41EUR/kgPrinted LCOH.Low end of announced ATR capture rates.
Market range94.2%Printed project list.High end of announced ATR capture rates.
Market range98.7%Printed project list.Default economic lifetime of the CRF.
Market range25yearPrinted modelling parameter.Whole-plant capacity-scaling exponent on total overnight cost, held as a constant (no longer an input). One exponent for all islands, so specific CAPEX scales as (capacity/660 t/d)^-0.30.
Market range QGESS account exponents for this plant's equipment span 0.41-0.88 depending on account and configuration; no whole-plant ATR range is cited.
0.7Published practice (IEAGHG) + account exponents (QGESS); whole-plant use is a modelling assumption.SCOPE. Oxygen-blown ATR with prereformer, elevated-pressure ASU (95 vol% O2), water-gas shift, MDEA pre-combustion capture, PSA, CO2 compression and drying, H2 compression, and a fired heater burning the PSA off-gas. The ASU is INSIDE the battery limit, so oxygen is not an inlet flow: its cost is in the CAPEX and its power in the electricity import.
Market range Not applicable (statement).
—NETL Case 3 flowsheet.Per-kg intensities are ratios of printed NETL flows (derived, not printed): they hold at the design point and are held constant with scale, which is the usual screening assumption for a plant built from parallel trains.
Market range Not applicable (statement).
—Derived from printed flows.CO2 generated is computed from the carbon content of the gas burnt (Exhibit 3-41) and split by the capture rate. The captured stream is then compared with the CO2 product stream of a different exhibit (3-36): the two agree, which is an independent closure of the balance, not an identity.
Market range Not applicable (statement).
—Carbon balance.Capture-island CAPEX (MDEA AGR + CO2 compression, 178 $/(kg/d)) and capture power (113.4 kWh per t CO2 captured) are scaled LINEARLY with captured CO2 relative to NETL's 242,411 kg/h. Raising capture from 94.5 % to 97 % therefore raises them by 2.6 %; the real cost of the last percent of capture is steeper, which is why the slider stops at 97 %.
Market range Not applicable (statement).
—Scaling assumption.Every plant-cost block is scaled by (capacity/660 t/d)^(0.70 - 1) per kg/d. The capacity slider is limited to 500-820 t/d (anchor +/-25 %). That range is an OpenJack screening choice that keeps the extrapolation from NETL's single priced size short; it is NOT a domain printed by a source. QGESS's own +/-25 % applies to the median of the ranges printed in its exhibits, not to a user's reference plant, and under that definition the ATR ASU (about 3,068 t/d O2 = 127,850 kg/h x 24) is already below the 4,000-4,800 TPD range QGESS prints for account 4.3. The off-anchor CAPEX is therefore a screening estimate. The clamp on the capacity ratio (0.2-2) never binds inside the slider (ratio 0.76-1.24).
Market range Not applicable (statement).
—Modelling assumption (screening range, not a source domain).Plant costs and NETL O&M are December-2018 US dollars converted to euros at IEAGHG's 2020 average rate, with an escalation factor of 1 from Dec-2018 to 2020. That factor of 1 is a modelling assumption, not a measured index ratio. There is no escalation input any more: the exported CAPEX is declared EUR 2020, and the project re-escalates from there. A user with a current quote enters it through the Customized CAPEX option, in EUR 2020. Equipment prices rose markedly after 2020, so a build priced today costs more than shown.
Market range Not applicable (statement).
—Cost-basis statement (escalation factor 1 = modelling assumption).All costs are in constant euros with no escalation of O&M, fuel or power over the life, so the discount rate is applied as a REAL rate. The annuity form CRF x CAPEX / annual H2 + annual costs / annual H2 equals NPV(expenditure)/NPV(H2) when annual flows are constant and construction time is ignored (overnight cost; interest during construction is excluded, see capex_battery_limit_declaration).
Market range Not applicable (statement).
—Levelised-cost convention.The gas price is applied to the HHV gas intensity (51.20 kWh_HHV/kg). European hub prices are quoted on a gross calorific (HHV) basis, which is the convention retained; IEAGHG does not state the basis of its table, which is flagged here.
Market range Not applicable (statement).
—Price-basis statement.In project mode: natural gas (MWh_HHV/year) and electricity (MW average) are inlets; hydrogen is the main outlet; captured CO2 is an outlet (manual alignment). costs.opex.variable_excluding_feedstocks carries only the other variable O&M, the CO2 T&S fee and the carbon cost. If you chain the CO2 outlet to an explicit transport & storage asset, set the T&S fee here to 0 to avoid paying for storage twice.
Market range Not applicable (statement).
—Chaining statement.The CAPEX exported to project mode is NETL's total overnight cost: TPC plus owner's costs (pre-production, inventory, land, financing fees, other owner's costs). It EXCLUDES escalation during construction and interest during construction: NETL's total as-spent cost is TOC x 1.070, so the capital component here is about 7 % (about 0.024 EUR/kg at nominal) below a TASC basis. battery_limit is declared fully_financed and project mode adds no further uplift. Installation is already inside NETL's TPC: no installation factor is applied on top. In Customized mode the value entered must be on the same TOC perimeter.
Market range Not applicable (statement).
—Boundary declaration.Bounds were checked at every corner of the input box, not only along axes. At every corner the seven components sum to the LCOH and the CAPEX split sums to the TOC. With every other input at its worst corner, a gas price above about 58 EUR/MWh would take the LCOH past the 5 EUR/kg bound (about 71 EUR/MWh with the other inputs at nominal); the gas slider stops at 45 EUR/MWh, and 2022-type prices are outside the declared domain.
Market range Not applicable (statement).
—Domain statement.The economic basis is the one shared with the SMR calculator of the same batch, so the two LCOH figures are comparable line by line; only the plant (NETL Case 3 ATR) differs.
Market range Not applicable (statement).
—Comparability statement.CUSTOMIZED CAPEX. capex_customized = 1 replaces the model's specific TOC by the value entered (EUR 2020 per kg/d, TOC perimeter) at every size, with no scaling law. The exported split (ASU, capture, reforming island, TPC, owner's costs) is the model's split prorated to the retained TOC, so it always sums to the TOC; the capture-chain view follows the same prorating. Fixed O&M follows the retained TOC at NETL's ratio 37.469/1,372 = 2.73 %/yr of TOC (identical to 3.43 %/yr of TPC in model mode).
Market range No independent range cited.
—AIHeat and losses = gas HHV in + electricity in - H2 out x 39.41 kWh_HHV/kg, all on an HHV basis. It is an output, not an outlet: NETL does not export the heat.
Market range Not applicable (statement).
—Energy balance.Reference size of the capacity-scaling law: the only plant size NETL prices.
Market range Not applicable (single design).
660t/dPrinted design capacity.No part-load penalty is modelled: the unsourced part-load slider was removed. The capacity factor is read as full-load hours (on/off operation at the NETL design point), so gas, oxidant and power intensities are those of the design. load_penalty_factor is held at 1 and documented as such; it is not a lever.
Market range No independent range cited.
—Modelling assumption.