Energy mass balanceCostingCarbon capture
CO2 conditioning and liquefaction for ship transport (low or medium pressure) levelized cost
Captured CO2 compressed, dried and liquefied at 7 or 15 barg for ship transport: levelised liquefaction cost in EUR/t, specific electricity in kWh/t, yearly electricity, CAPEX scaled on the daily flow (Roussanaly et al. 2021), and buffer storage as a separate line.
- CurrencyEUR 2017
- Battery limitfully financed
- 65 documented assumptions
- Updated27 Oct 2026
Mass and energy balance
What the asset draws and delivers for the case and load you choose.
Reference case
Share of the year the unit runs at its daily flow. 85 % is the source value. Sets the yearly tonnes; the investment depends on the daily flow only.
Flows
- In: Captured CO2 (gas, 1 bara)—
- In: Electricity—
Asset
CO2 conditioning and liquefaction unit for ship transport (7 or 15 barg)
- Out: Liquid CO2 for ship transport—
Annual quantities at the current usage. Outline: full capacity, 8,760 h. Fill: 85.0 % capacity factor. Band width: share of energy in; non-energy flows are not to scale.
Tonnes of liquid CO2 produced per operating day, the capacity makers print (Nord Gas PuregasBC 25-110 t/d, Linde modular plants 100-360 t/d, Air Liquide Cryocap LQ from 700 t/d per train). The source cost law covers 0.5-20 Mt/y, about 1,600 t/d and up at 85 %: below that the cost is extrapolated and likely optimistic.
- Hourly CO2 flow
- — t/h
- Liquid CO2 volume per day
- — m3/d
- Electrical demand in operation
- — MW
CAPEX
Specific cost at this size, what backs it, and how it behaves with scale.
Specific CAPEX at this size
—
Reference size 3,223 t/d
Roussanaly 2021, Eq. 1
Model value: the source investment scaled to your flow. Customized: your own quote per t/d, used as is at every size; the value is then no longer sourced.
Log in to view this sensitivity chart.
- Ex-factory
- Installed
- Fully financed· this figure
Included
- Equipment and installation
- Indirect and owner's costs
- Contingency
Not included
- Nothing
Added at project level
- Nothing: project mode uses the figure as is
Project figures
Values passed to project mode when this asset is added to a project.
CO2 conditioning and liquefaction unit for ship transport (7 or 15 barg)Concept sketch, not to scale · drag to rotate
- Captured CO2 (gas, 1 bara) in
- —
- Electricity in
- —
- Liquid CO2 for ship transport outMain product
- —
- CAPEX to the battery limit
- —
- Fixed O&M
- —
- Variable O&M, excluding feedstocks
- —
- Asset lifetime
- 25 years
Log in to add this asset to a project.
Liquefaction cost
A standalone indicator for a quick read. Project mode recomputes it for the whole system.
—
- Cost: capital—
- Cost: fixed O&M—
- Cost: electricity—
- Cost: other variable OPEX—
Linked to the balance above
Share of the year the unit runs at its daily flow. 85 % is the source value. Sets the yearly tonnes; the investment depends on the daily flow only.
Price of the electricity used by the compressors and the refrigeration cycle. 80 EUR/MWh is the source value.
Cargo of the ships loading at this terminal. Used only to size the buffer storage (1.2 x ship size, Roussanaly 2021), shown as a separate line outside the liquefaction cost.
Real rate for the capital recovery factor and the construction interest. 8 % is the source value.
Years over which the investment is annualised. 25 years is the source value.
Log in to view this sensitivity chart.
Benchmarks
This model's figures against published references and reference cases.
Liquefaction cost, EUR/t
14 Roussanaly 2021, Table 3
14.9 Roussanaly 2021, Table 3
Specific energy, kWh/t
17.4 Roussanaly 2021, Table 3
25 Element Energy 2018, p.45
112.4 Roussanaly 2021, Table 3
121.8 Roussanaly 2021, Table 3
Reference cases at this size and usage
Log in to compare the reference cases.
All results
Every model output at the current settings, grouped, with the sensitivity charts.
51 outputs · 7 groups · 15 also shown above, dimmed
Liquefaction cost
7- Capital share of the cost
- Computing%
- Electricity share of the cost
- Computing%
Size and CAPEX
7- Specific CAPEX at the 1 Mt/y reference
- ComputingEUR/(t/d)
- Reference CAPEX at 1 Mt/y
- ComputingEUR
- Scale exponent applied
- Computingratio
- CAPEX per yearly tonne
- ComputingEUR/t
- Outside the source size domain
- Computingbool
Energy and process
12- Energy penalty vs 15 barg
- Computing%
- Annual electricity
- ComputingMWh/yr
- Transport pressure
- Computingbarg
- Transport temperature
- Computing°C
- Liquid CO2 density
- Computingkg/m3
- Specific energy if CO2 arrives at 90 bara
- ComputingkWh/t
- Compression share of the energy
- ComputingkWh/t
- Specific energy with an impure feed (max)
- ComputingkWh/t
- Energy uplift with an impure feed (max)
- ComputingkWh/t
Production
6- CO2 liquefied per year (Mt)
- ComputingMt/year
- Operating hours
- Computingh/year
- Utilisation gap to the source
- Computingpp
Buffer storage
6- Buffer storage volume
- Computingm3
- Buffer storage CAPEX
- ComputingEUR
- Buffer storage fixed O&M
- ComputingEUR/year
- Buffer storage cost per tonne
- ComputingEUR/t
- Buffer storage in days of production
- Computingd
- CAPEX incl. buffer storage
- ComputingEUR
Source check
4- Liquefaction cost printed by the source
- ComputingEUR/t
- Capital cost at the source configuration
- ComputingEUR/t
- Capital cost printed by the source
- ComputingEUR/t
- Capital cost check, model vs source
- Computing%
Finance and yearly costs
9- Capital recovery factor
- Computing1/year
- Construction interest factor
- Computingratio
- Capital incl. construction interest
- ComputingEUR
- Annualised capital
- ComputingEUR/year
- Electricity cost
- ComputingEUR/year
- Other variable OPEX per tonne
- ComputingEUR/t
- Total yearly cost
- ComputingEUR/year
Sensitivities
5 chartsLog in to view this sensitivity chart.
Log in to view this sensitivity chart.
Log in to view this sensitivity chart.
Log in to view this sensitivity chart.
Log in to view this sensitivity chart.
Sources
65 documented assumptions · 3 sources
- psecommunity.orgRoussanaly, Deng, Skaugen, Gundersen (2021), At what pressure shall CO2 be transported by ship? Energies 14(18):5635process (3.1.1), power law (Eq. 1), cost KPI (Eq. 2), Table 3, buffer storage (3.2.2), economic criteria (3.3)
- iifiir.orgDeng, Roussanaly, Skaugen (2019), Techno-economic analyses of CO2 liquefactionimpact of product pressure and impurities, Int. J. Refrigeration 103:301-315
- ukccsrc.ac.ukElement Energy for UKCCSRC (2018), CO2 transportthe role of CO2 shipping, p.45: liquefaction energy for pre-pressurised CO2
About
Calculator context
About
Calculator context
Unit that turns captured CO2 into liquid for ship transport, as in a Northern Lights type CCS chain: multi-stage compression with intercooling and water knock-out (dehydration), impurity removal, pre-cooling, liquefaction and flash gas recompression, with a two-stage ammonia refrigeration cycle, to liquid CO2 at 7 barg (-46 °C, low pressure) or 15 barg (-30 °C, medium pressure). The calculator gives the levelised liquefaction cost in EUR per tonne, split into capital, fixed O&M, electricity and other variable OPEX; the specific electricity in kWh/t; the yearly electricity in MWh; the liquefaction CAPEX; and, as a separate line, the buffer storage before loading. The size input is the liquid CO2 per day in t/d, the capacity makers print.
Method. The model follows Roussanaly et al. (2021, Energies 14:5635), built on the process of Deng et al. (2019), for pure CO2 at 1 bara and 40 °C from the capture plant. Specific energy: 96.3 kWh/t at 7 barg and 90.4 kWh/t at 15 barg (Table 3). Investment: a power law with exponent 0.85 from a 1 Mt/y reference. The source does not print the investment; it is derived from the printed fixed OPEX and the rule that fixed OPEX is 6 % of the investment, giving 41.7 MEUR at 7 barg and 38.3 MEUR at 15 barg (EUR 2017). The investment is carried over a three-year 40/30/30 construction and annualised with the capital recovery factor. As an independent check, the capital part at the source configuration (8 %, 25 years, 1 Mt/y) is 4.26 EUR/t against 4.2 printed at 7 barg, and 3.92 against 4.0 at 15 barg. The two OPEX parts are rebuilt from the same table, so the totals (about 15.1 and 14.0 EUR/t against 14.9 and 14.0 printed) are not a separate validation.
Scope. The source covers 0.5 to 20 Mt/y, about 1,600 t/d and up. The slider starts at 20 t/d to reach packaged units (25-360 t/d), but there the 0.85 law is extrapolated: no open source sets the cost at that scale, and small units likely cost more. Impure CO2 (103-122 kWh/t in the source) and CO2 already at 90 bara (9-17.4 kWh/t) are out of scope and shown only as references. Liquefaction is cheaper at 15 barg, but the source finds the full 7 barg chain more than 30 % cheaper over a wide range, because ships and buffer tanks cost less; choose the pressure on the whole chain.
Model
119 variables — inputs, calculations and outputs, with their dependencies.
Model
119 variables — inputs, calculations and outputs, with their dependencies.
| Variable | Value | Unit | Depends on |
|---|---|---|---|
| 3000 | t/d | — | |
| 1 | — | — | |
| 0 | — | — | |
| 13000 | EUR/(t/d) | — | |
| 85 | % | — | |
| 80 | EUR/MWh | — | |
| 10000 | t | — | |
| 8 | % | — | |
| 25 | years | — |
| Variable | Formula | Unit | Depends on |
|---|---|---|---|
if((<=0)+(<=0)+(>100)+(<0)+(<0)+(<=0)+(<)+(>)+(<0)+(>)+(<=0)+(<=0)>0,1,0) | bool | ||
* | ratio | ||
* | ratio | ||
(*(+)^)/max((+)^-,) | 1/year | ||
**(+)*(+)+**(+)+* | ratio |
| Variable | Formula | Unit | Depends on |
|---|---|---|---|
** | h/year | ||
*** | t/year | ||
/ | Mt/year | ||
/ | t/h | ||
- | pp | ||
if((<)+(>)>,,) | bool | ||
if(==,,) | kWh/t | ||
(/-)/ | % | ||
** | MW | ||
** | MWh/yr | ||
| MWh/yr | ||
if(==,,) | barg | ||
if(==,,) | °C | ||
if(==,,) | kg/m3 | ||
*/ | m3/d | ||
if(==,,) | kWh/t | ||
- | kWh/t | ||
if(==,,) | kWh/t | ||
- | kWh/t | ||
if(==,,)**/(*) | EUR | ||
/ | EUR/(t/d) | ||
if(>=,,) | ratio | ||
if(>=,,clamp(*(/)^(-),,)) | EUR/(t/d) | ||
* | EUR | ||
/max(,) | EUR/t | ||
if(<,/,(*(+)^)/max((+)^-,)) | 1/year | ||
**(+)*(+)+**(+)+* | ratio | ||
* | EUR | ||
* | EUR/year | ||
** | EUR/year | ||
* | EUR/year | ||
max(if(==,,)-**,) | EUR/t | ||
* | EUR/year | ||
+++ | EUR/year | ||
/max(,) | EUR/t | ||
/max(,) | EUR/t | ||
/max(,) | EUR/t | ||
/max(,) | EUR/t | ||
+++ | EUR/t | ||
/max(,)/ | % | ||
/max(,)/ | % | ||
**/(*) | EUR/t | ||
if(==,,) | EUR/t | ||
(/max(,)-)/ | % | ||
if(==,,) | EUR/t | ||
**/ | m3 | ||
*if(==,,) | EUR | ||
** | EUR/year | ||
(**+)/max(,) | EUR/t | ||
*/ | d | ||
+ | EUR |
Assumptions
65 assumptions used in the calculations
Assumptions
65 assumptions used in the calculations
Protects divisions against a zero denominator.
Market range Not applicable (numerical parameter).
0.000001Numerical constantUnit value used in the CRF, the guards and the Customized switch.
Market range Exact by definition.
1Numerical constantZero value used in flags and in the floor of a derived residual.
Market range Exact by definition.
0Numerical constantConverts a percent into a fraction.
Market range Exact by definition.
0.01Numerical constantTonnes per megatonne.
Market range Exact by definition.
1000000t/MtNumerical constantKilograms per tonne.
Market range Exact by definition.
1000kg/tNumerical constantMWh per kWh.
Market range Exact by definition.
0.001MWh/kWhNumerical constantMW per kW.
Market range Exact by definition.
0.001MW/kWNumerical constantTime basis of the operating hours.
Market range 8760 h (8784 h in a leap year).
8760h/yearCalendar conventionConverts the daily liquefied flow into a yearly quantity.
Market range 365 d (366 in a leap year).
365d/yearCalendar conventionConverts the daily flow into an hourly flow.
Market range Exact by definition.
24h/dCalendar conventionCode of the 7 barg reference case in the technology_case select.
Market range Not applicable.
1Selector codeCode of the 15 barg reference case in the technology_case select.
Market range Not applicable.
2Selector codeLowest valid code of the reference case select.
Market range Not applicable.
1Selector codeHighest valid code of the reference case select.
Market range Not applicable.
2Selector codeElectricity per tonne liquefied at 7 barg, from CO2 at 1 bara and 40 C after capture up to liquid CO2 in storage: multi-stage compression with intercooling and water knock-out, pre-cooling, liquefier, flash drum, flash gas recompression and a two-stage ammonia vapour-compression refrigeration cycle.
Market range96.3kWh/tRoussanaly 2021, Table 3Electricity per tonne liquefied at 15 barg, same process and inlet as the 7 barg case. Less work because the liquefaction temperature is higher (about -30 C instead of -46 C).
Market range Same Table 3 range as the 7 barg case.
90.4kWh/tRoussanaly 2021, Table 3Out of scope reference: if the CO2 already arrives at 90 bara the compression is done upstream and liquefaction needs only 17.4 kWh/t. Used only to show the energy this calculator counts for compression from 1 bara.
Market range17.4kWh/tRoussanaly 2021, Table 3Out of scope reference, 15 barg counterpart of the pre-pressurised case.
Market range9kWh/tRoussanaly 2021, Table 3Upper reference for impure CO2: impurity removal adds work. The calculator itself is for pure CO2; this value shows how much an impure feed can add.
Market range121.8kWh/tRoussanaly 2021, Table 315 barg counterpart of the impure-feed reference.
Market range112.4kWh/tRoussanaly 2021, Table 3Product pressure of the low pressure case.
Market range Ship transport studied at 7 and 15 barg; 45 barg is a third option outside this source.
7bargRoussanaly 2021, abstractProduct pressure of the medium pressure case.
Market range Same as the low pressure case.
15bargRoussanaly 2021, abstractLiquid CO2 temperature at 7 barg, close to the triple point (-56.6 C), which is why the 7 barg chain needs a purer product and colder refrigeration.
Market range No independent range cited.
-46°CRoussanaly 2021, p.1-3Liquid CO2 temperature at 15 barg.
Market range No independent range cited.
-30°CRoussanaly 2021, p.1-3Converts tonnes into liquid volume for the daily volume and the buffer storage.
Market range No independent range cited.
1150kg/m3Roussanaly 2021, Table 3Same use at 15 barg: the warmer liquid is less dense, so each tonne needs about 8 % more tank volume.
Market range No independent range cited.
1060kg/m3Roussanaly 2021, Table 3Size at which Table 3 prints the liquefaction cost; the anchor of the scale law.
Market range Source chain studies 0.5-20 Mt/y (section 2).
1Mt/yearRoussanaly 2021, Table 3Utilisation behind the 1 Mt/y reference; used to turn the reference into a daily design flow and to show how far the chosen utilisation is from it.
Market range No independent range cited.
85%Roussanaly 2021, section 3.3Daily design flow of the cost anchor. The scale law is written on this flow, so the CAPEX depends on the plant size and not on how many days it runs.
Market range Not applicable (derived).
3,223.207t/dDerived from Roussanaly 2021Printed fixed OPEX at the reference size. With the 6 % fixed OPEX rule it gives the reference investment: 2.5 x 1 Mt / 0.06 = 41.7 MEUR (derived, not printed).
Market range Table 3 total cost at 1 Mt/y: 14.0-22.8 EUR/t across all scenarios.
2.5EUR/tRoussanaly 2021, Table 3Same derivation at 15 barg: 2.3 x 1 Mt / 0.06 = 38.3 MEUR.
Market range Same Table 3 range.
2.3EUR/tRoussanaly 2021, Table 3Documents the reference investment the model rebuilds in the node ref_capex_eur (EUR 2017). The model computes it from the printed fixed OPEX rather than from this rounded value.
Market range No published investment figure for the liquefaction unit alone.
41.7MEURDerived from Roussanaly 202115 barg counterpart of the derived reference investment.
Market range No published investment figure for the liquefaction unit alone.
38.3MEURDerived from Roussanaly 2021Printed annualised capital cost. It is NOT used to build the model; it is the independent check of the derived investment (output ref_point_capital_cost_gap_pct).
Market range No independent range cited.
4.2EUR/tRoussanaly 2021, Table 3Same independent check at 15 barg.
Market range No independent range cited.
4EUR/tRoussanaly 2021, Table 3Printed variable OPEX. Electricity at 80 EUR/MWh accounts for 7.70 of it; the remaining 0.60 EUR/t is kept as other variable OPEX (utilities and consumables the source does not itemise), independent of the electricity price.
Market range No independent range cited.
8.3EUR/tRoussanaly 2021, Table 3Same split at 15 barg: 7.23 EUR/t of electricity and a 0.57 EUR/t residual.
Market range No independent range cited.
7.8EUR/tRoussanaly 2021, Table 3Printed total at the reference point, shown as a benchmark next to the levelised cost. At the source configuration the model gives about 15.1 EUR/t; only its capital part is an independent reproduction, the two OPEX parts are rebuilt from the same table.
Market range14.9EUR/tRoussanaly 2021, Table 315 barg benchmark. The model gives about 14.0 EUR/t at the source configuration.
Market range14EUR/tRoussanaly 2021, Table 3Fixed O&M per year as a share of the liquefaction investment; also the rule that recovers the reference investment from the printed fixed OPEX.
Market range No independent range cited.
6%/yearRoussanaly 2021, section 3.2.1Scale law of the liquefaction investment on the CO2 flow. The source applies it over 0.5-20 Mt/y; below about 1,600 t/d this calculator extrapolates it (see scope_small_units).
Market range 0.85 in the source; no other exponent cited for this unit.
0.85Roussanaly 2021, Eq. 1Floor of the clamp on the scaled specific investment. It never binds inside the slider range.
Market range Not applicable (guard).
5000EUR/(t/d)Model guardCeiling of the clamp on the scaled specific investment. It never binds inside the slider range.
Market range Not applicable (guard).
60000EUR/(t/d)Model guardShare of the investment spent in the first construction year, carried two years at the discount rate.
Market range No independent range cited.
40%Roussanaly 2021, section 3.3Share spent in the second year, carried one year.
Market range No independent range cited.
30%Roussanaly 2021, section 3.3Share spent in the last year, not carried.
Market range No independent range cited.
30%Roussanaly 2021, section 3.3Price behind the printed variable OPEX; used only to split it into electricity and other variable OPEX. The live electricity price is an input.
Market range No independent range cited.
80EUR/MWhRoussanaly 2021, section 3.2.1Rate of the source configuration, used only by the reference-point check. The live discount rate is an input.
Market range No independent range cited.
8%Roussanaly 2021, section 3.3Lifetime of the source configuration, used only by the reference-point check.
Market range No independent range cited.
25yearsRoussanaly 2021, section 3.3Lower end of the source domain, about 1,600 t/d at 85 %. Below it the output outside_source_domain_flag is 1.
Market range Not applicable.
0.5Mt/yearRoussanaly 2021, section 2Upper end of the source domain; the slider (10,000 t/d, about 3.5 Mt/y at 95 %) stays below it.
Market range Not applicable.
20Mt/yearRoussanaly 2021, section 2Buffer storage before loading is sized on the ship cargo, not on the CO2 flow.
Market range No independent range cited.
1.2Roussanaly 2021, section 3.1.2Specific investment of the 7 barg buffer tanks (EUR 2017).
Market range550EUR/m3Roussanaly 2021, section 3.2.2Specific investment of the 15 barg buffer tanks: thicker walls for the higher pressure.
Market range920EUR/m3Roussanaly 2021, section 3.2.2Yearly fixed O&M of the buffer storage.
Market range No independent range cited.
6%/yearRoussanaly 2021, section 3.2.2Independent order of magnitude for pre-pressurised CO2, consistent with the 9-17.4 kWh/t of Roussanaly Table 3. Out of scope for this calculator (CO2 at 1 bara); shown as a benchmark only.
Market range25kWh/tElement Energy 2018, p.45Method: the liquefaction cost of Roussanaly et al. (2021): investment scaled with a 0.85 power law from a 1 Mt/y reference, carried over a 3-year 40/30/30 construction at the discount rate, annualised with the capital recovery factor, plus 6 % fixed O&M, electricity and a small non-electric variable OPEX, all divided by the tonnes liquefied per year.
Market range Not applicable.
—Roussanaly 2021Process behind the numbers: multi-stage compression with intercooling and water knock-out (dehydration to the dew point), impurity removal, pre-cooler, liquefier, flash drum with flash gas recompression, and a two-stage ammonia vapour-compression cycle as refrigeration. The propane and self-refrigerated (open cycle) options named in industry are not modelled separately.
Market range Not applicable.
—Deng 2019Small units: the source covers 0.5-20 Mt/y, about 1,600-64,000 t/d at 85 %. The slider starts at 20 t/d, so below about 1,600 t/d the 0.85 law is EXTRAPOLATED. Real small units (Nord Gas PuregasBC 25-110 t/d, Linde modular plants 100-360 t/d) probably cost more than this extrapolation. No open source was found that sets the cost below 0.5 Mt/y; the flag outside_source_domain_flag shows when you are there.
Market range Not applicable.
—Model scopePure CO2 at the inlet. An impure feed (amine capture with traces, membrane capture, refinery gas) adds impurity removal: 103-122 kWh/t and 16.5-22.8 EUR/t at 1 Mt/y in the source. The output impurity_energy_uplift_max_kwh_per_t shows the largest energy uplift; the cost uplift is not modelled.
Market range Not applicable.
—Model scopeCO2 at 1 bara and 40 C, as it leaves a capture plant (Longship case). CO2 already at 90 bara, delivered by pipeline, is out of scope: it needs only 9-17.4 kWh/t, and the cost and bounds of this calculator would not hold.
Market range Not applicable.
—Model scopeCosts are EUR 2017, north-western Europe, real terms, with no escalation. The discount rate is read as a real rate, consistent with constant euros.
Market range Not applicable.
—Model scopeBuffer storage before loading is shown as a separate line and is NOT in the levelised liquefaction cost: it is sized on the ship, not on the flow, so at small flows it would dominate (a 10,000 t ship is about 500 days of production at 20 t/d). It is not in the CAPEX exported to project mode either.
Market range Not applicable.
—Model scopeReading: liquefaction at 7 barg costs more than at 15 barg (colder refrigeration, more power), yet the full 7 barg chain is cheaper over a wide range because ships and buffer tanks are cheaper. This calculator covers the liquefaction unit only; choose the pressure on the whole chain.
Market range Not applicable.
—Roussanaly 2021